Back to bathroom remodel contractors
3 D Design & Construction Inc
- Based in
- San Anselmo
- On San Francisco permits
- Nov 2009 to May 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 27 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2015 | Completed final sign-off May 2015 | 154 Lombard St | remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/aDetails
remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/a | $54,350 |
| Jan 14, 2015 | Completed final sign-off Mar 2016 | 430 El Camino Del Mar | build out former storage room to create guest room. add full bathroom, add windows and modify extg windows at back. no exterior expansion. mep under seperate permit.Details
build out former storage room to create guest room. add full bathroom, add windows and modify extg windows at back. no exterior expansion. mep under seperate permit. | $20,000 |
| Aug 5, 2013 | Completed final sign-off Dec 2013 | 150 Lombard St | unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain.Details
unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain. | $72,000 |
| Jul 10, 2013 | Completed final sign-off Sep 2013 | 101 Lombard St | remodel bathroom. replace bathtub with shower, install new tile, shower doors, vanity, sink, fuacet and bentilation fan. relocate light fixture location. relocate gfci location. install built in bookshelves in master bedroom and living room. install new carpet. install new countertop and mirrors.Details
remodel bathroom. replace bathtub with shower, install new tile, shower doors, vanity, sink, fuacet and bentilation fan. relocate light fixture location. relocate gfci location. install built in bookshelves in master bedroom and living room. install new carpet. install new countertop and mirrors. | $14,800 |
| Sep 6, 2012 | Completed final sign-off Mar 2013 | 101 Lombard St | remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets.Details
remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets. | $80,000 |
| Jul 6, 2012 | Completed final sign-off Jan 2013 | 120 Shrader St | master bathroom remodel - relocate toilet and vanity sink. remove tub and install new shower. all new finishes. no structural changes. install new forced air unit to service upstairs of sfd, in closet located in upstairs hallway.Details
master bathroom remodel - relocate toilet and vanity sink. remove tub and install new shower. all new finishes. no structural changes. install new forced air unit to service upstairs of sfd, in closet located in upstairs hallway. | $65,000 |
| Feb 25, 2010 | Completed final sign-off May 2011 | 2132 Bryant St | remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insertDetails
remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insert | $85,000 |
| Dec 10, 2009 | Completed final sign-off May 2011 | 2132 Bryant St | partial remodel of existing 2 story building. scope includes tenant improvment of 1st floor only. includes replace existing light fixtures, add outlets, replace gas furnace, add ada bath,voluntary install steel rigid frames on the ground floor per plans. change use under separate permit.Details
partial remodel of existing 2 story building. scope includes tenant improvment of 1st floor only. includes replace existing light fixtures, add outlets, replace gas furnace, add ada bath,voluntary install steel rigid frames on the ground floor per plans. change use under separate permit. | $48,500 |