Back to kitchen remodel contractors
20/20 Builders
- Based in
- Oakland
- On San Francisco permits
- Dec 2009 to Jul 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2009 | Completed final sign-off May 2010 | 754 Duboce Av | add posts & beam in the basement, add posts & beams in the 1st floor kitchen area. work for 756 duboce. (existing wall layouts to remain the same)Details
add posts & beam in the basement, add posts & beams in the 1st floor kitchen area. work for 756 duboce. (existing wall layouts to remain the same) | $8,000 |
| Dec 7, 2009 | Completed final sign-off May 2010 | 756 Duboce Av | remove and replace kitchen cabinets, sink, light fixtures, toilet bowl, floor finishes, faucets, tile in the existing kitchen and bathroom. install garbage disposalDetails
remove and replace kitchen cabinets, sink, light fixtures, toilet bowl, floor finishes, faucets, tile in the existing kitchen and bathroom. install garbage disposal | $38,000 |