Back to bathroom remodel contractors
20/20 Builders
- Based in
- Oakland
- On San Francisco permits
- Dec 2009 to Jul 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 8 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2015 | Expired or cancelled expired Jul 2018 | 3330 23rd St | build a division between (e) garage and new storage. addition of plumbing for future bathroom and laundry room. replacing garage door.Details
build a division between (e) garage and new storage. addition of plumbing for future bathroom and laundry room. replacing garage door. | $20,000 |
| Dec 7, 2009 | Completed final sign-off May 2010 | 756 Duboce Av | remove and replace kitchen cabinets, sink, light fixtures, toilet bowl, floor finishes, faucets, tile in the existing kitchen and bathroom. install garbage disposalDetails
remove and replace kitchen cabinets, sink, light fixtures, toilet bowl, floor finishes, faucets, tile in the existing kitchen and bathroom. install garbage disposal | $38,000 |