Back to kitchen remodel contractors
1 Original Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Mar 2024
- Last 24 months
- 0 permits filed
29 permits since 2000: 23 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2022 | Completed final sign-off May 2023 | 746 21st Av | in unit 746. renovate existing (1) kitchen & (1) bathroom. new cabinets, appliances and wall surfaces.Details
in unit 746. renovate existing (1) kitchen & (1) bathroom. new cabinets, appliances and wall surfaces. | $27,000 |
| Jun 2, 2021 | Completed final sign-off Aug 2021 | 270 Lansdale Av | replace kitchen counter top w/ sink and faucet- cabinets stay: install new appliances. replace fixtures in two full bathrooms and one half bathroom. painting of existing cabinets in kitchen.Details
replace kitchen counter top w/ sink and faucet- cabinets stay: install new appliances. replace fixtures in two full bathrooms and one half bathroom. painting of existing cabinets in kitchen. | $20,000 |
| May 29, 2020 | Completed final sign-off May 2021 | 155 Jackson St | apt #2501-interior remodel in-kind, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitions, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 compliant lighting. no changes to hvac.Details
apt #2501-interior remodel in-kind, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitions, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 compliant lighting. no changes to hvac. | $107,800 |
| Jan 24, 2006 | Completed final sign-off May 2006 | 322 24th Av | renovate (e) kitchen in flat @ 324 - 24th avenue. new drywall & ceiling.cabinets & countertops, upgrade electrical & plumbing fixtures. no relocation of walls. no structural.Details
renovate (e) kitchen in flat @ 324 - 24th avenue. new drywall & ceiling.cabinets & countertops, upgrade electrical & plumbing fixtures. no relocation of walls. no structural. | $15,000 |
| Dec 13, 2005 | Completed final sign-off Sep 2006 | 161 Broderick St | renovate (e) bath & kitchen with new cabinets & counters, electrical & plumbing. in unit# 1 and renovate (e) bath in unit# 2. electrical lighting in kitchen 50% or 100% wattage ti be fkyrecebt ub bath 100% flourcent.Details
renovate (e) bath & kitchen with new cabinets & counters, electrical & plumbing. in unit# 1 and renovate (e) bath in unit# 2. electrical lighting in kitchen 50% or 100% wattage ti be fkyrecebt ub bath 100% flourcent. | $20,000 |
| Oct 12, 2005 | Expired or cancelled expired Feb 2009 | 1586 27th Av | replace cabinets, counters, stove sink, dishwasher. add new lighting. non structural for kitchen remodel.Details
replace cabinets, counters, stove sink, dishwasher. add new lighting. non structural for kitchen remodel. | $20,000 |