Block 4624, lot 004
48 Middle Point Rd
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2013 | Completed final sign-off Apr 2014 | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | revision to grading permit to document existence of fill on a portion of the site. original pa# 2010/07/22/7178. revision pa# 2011/03/02/1200.Details
revision to grading permit to document existence of fill on a portion of the site. original pa# 2010/07/22/7178. revision pa# 2011/03/02/1200. | |
| Jan 18, 2013 | Completed final sign-off Apr 2013 | 61 West Point Rd | R T S Systems And Design Llc | revision to pa# 2012-0402-7292 (building b)-revision of calculation for the notifier nfs-320 fire panel, page fa-2.02Details
revision to pa# 2012-0402-7292 (building b)-revision of calculation for the notifier nfs-320 fire panel, page fa-2.02 | |
| Jan 18, 2013 | Completed final sign-off Apr 2013 | 63 West Point Rd | R T S Systems And Design Llc | revision to pa# 2012-0402-7297-revision of panel battery calculation for the fire panel. bldg aDetails
revision to pa# 2012-0402-7297-revision of panel battery calculation for the fire panel. bldg a | |
| Dec 3, 2012 | Never finaled issued Dec 2012, no final | 11 West Point Rd | R T S Systems And Design Llc | as built per the electrical inspector showing removal of devices for elevator recall. revision to app#201204027298. this elevator is article 15 lula - hydraulic. add shunt trip for machine room sprinklerDetails
as built per the electrical inspector showing removal of devices for elevator recall. revision to app#201204027298. this elevator is article 15 lula - hydraulic. add shunt trip for machine room sprinkler | |
| Dec 3, 2012 | Completed final sign-off Aug 2013 | 52 Middle Point Rd | R T S Systems And Design Llc | as built per the electrical inspector showing removal of devices for elevator recall. revision to app#201204027298. this elevator is article 15 lula - hydraulic. add shunt trip for machine room sprinklerDetails
as built per the electrical inspector showing removal of devices for elevator recall. revision to app#201204027298. this elevator is article 15 lula - hydraulic. add shunt trip for machine room sprinkler | |
| Jun 7, 2012 | Never finaled issued Jun 2012, no final | 11 West Point Rd | Pribuss Engineering Inc | fire sprinkler installation per nfpa 13. bldg 6a, 240 heads, bldg 6b, 228 heads. under ground work done under 201111038178Details
fire sprinkler installation per nfpa 13. bldg 6a, 240 heads, bldg 6b, 228 heads. under ground work done under 201111038178 | $240,842 |
| Jun 7, 2012 | Completed final sign-off Oct 2013 | 63 West Point Rd | Pribuss Engineering Inc | fire sprinkler installation and standpipe. bldg 5a: 286 heads, bldg 5b: 241 heads. underground under 201201232683.Details
fire sprinkler installation and standpipe. bldg 5a: 286 heads, bldg 5b: 241 heads. underground under 201201232683. | $271,205 |
| Apr 2, 2012 | Completed final sign-off Apr 2013 | 63 West Point Rd | R T S Systems And Design Llc | add new fire alarm system with ada devices. slc devices.Details
add new fire alarm system with ada devices. slc devices. | $58,000 |
| Apr 2, 2012 | Never finaled issued Sep 2012, no final | 61 West Point Rd | R T S Systems And Design Llc | add new fire alarm system with ada devices. slc devices.Details
add new fire alarm system with ada devices. slc devices. | $58,000 |
| Apr 2, 2012 | Completed final sign-off Dec 2012 | 11 West Point Rd | R T S Systems And Design Llc | add fire alarm system with new ada devices& new slc devices.Details
add fire alarm system with new ada devices& new slc devices. | $60,000 |
| Apr 2, 2012 | Completed final sign-off Dec 2012 | 52 Middle Point Rd | R T S Systems And Design Llc | add fire alarm system with new ada devices& new slc devices.Details
add fire alarm system with new ada devices& new slc devices. | $60,000 |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 11 West Point Rd | Cahill-Nibbi Joint Venture | 24 all thread tie down system is being proposed for use on this project. pa #200912223718Details
24 all thread tie down system is being proposed for use on this project. pa #200912223718 | |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 61 West Point Rd | Cahill-Nibbi Joint Venture | 24 all thread tie down system is being proposed for use on this project (pa #200912223714)Details
24 all thread tie down system is being proposed for use on this project (pa #200912223714) | |
| Feb 9, 2012 | Completed final sign-off Feb 2014 | 63 West Point Rd | Cahill-Nibbi Joint Venture | 24 all thread tie down system is being proposed for use on this project. (pa #200912223711)Details
24 all thread tie down system is being proposed for use on this project. (pa #200912223711) | |
| Jan 23, 2012 | Never finaled issued Jan 2012, no final | 63 West Point Rd | Pribuss Engineering Inc | fire sprinkler underground for block 5. new construction under separate apn 200912223711Details
fire sprinkler underground for block 5. new construction under separate apn 200912223711 | $80,000 |
| Dec 22, 2011 | Never finaled issued Feb 2012, no final | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | az all thread tie down system is being proposed for use on the project cal & plans to review by dbi to allow z4 system to be used by constractor. ref. to pa #200912223722.Details
az all thread tie down system is being proposed for use on the project cal & plans to review by dbi to allow z4 system to be used by constractor. ref. to pa #200912223722. | $80,000 |
| Nov 3, 2011 | Never finaled issued Nov 2011, no final | 11 West Point Rd | Pribuss Engineering Inc | underground piping for fire sprinklers, block 6, ref 2009-1222-3718Details
underground piping for fire sprinklers, block 6, ref 2009-1222-3718 | $80,000 |
| Oct 12, 2011 | Never finaled issued Oct 2011, no final | 11 West Point Rd | Cahill-Nibbi Joint Venture | revision to app#2011-08-30-3529. new temporary earth shoring to accomodate foundation construction. add tiebacks to shoring beams.Details
revision to app#2011-08-30-3529. new temporary earth shoring to accomodate foundation construction. add tiebacks to shoring beams. | $100,000 |
| Aug 30, 2011 | Expired or cancelled withdrawn Nov 2012 | 11 West Point Rd | Cahill-Nibbi Joint Venture | temporary shoring for proposed foundation construction.Details
temporary shoring for proposed foundation construction. | $25,000 |
| Aug 30, 2011 | Completed final sign-off Jun 2012 | 63 West Point Rd | Cahill-Nibbi Joint Venture | temporary shoring for proposed foundation construction.Details
temporary shoring for proposed foundation construction. | $200,000 |
| Mar 2, 2011 | Completed final sign-off May 2014 | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | revision to grading permit pa#201007227178.Details
revision to grading permit pa#201007227178. | |
| Feb 3, 2011 | Completed final sign-off Feb 2014 | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | permit for administrative purposes only to correct unit count approved under 200912223722's. unit count 13 incorrect, final unit count as reflected in approved drawings is 12Details
permit for administrative purposes only to correct unit count approved under 200912223722's. unit count 13 incorrect, final unit count as reflected in approved drawings is 12 | |
| Feb 3, 2011 | Completed final sign-off Feb 2014 | 11 West Point Rd | Cahill-Nibbi Joint Venture | permit for administrative purposes only to correct unit count approved under 200912223718-s. unit count 11 incorrect, final count as reflected in plans 13 correctDetails
permit for administrative purposes only to correct unit count approved under 200912223718-s. unit count 11 incorrect, final count as reflected in plans 13 correct | |
| Jul 22, 2010 | Completed final sign-off Apr 2014 | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4720/27).Details
hunters view, phase i: re-grading of the site of the initial phase of a master-planned residential development; includes re-grading of a portion of west point road, which has been abandoned as a public street (see related applns for blk 4624/lot 9 & 4720/27). | $300,000 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 44 Middle Point Rd | bldg# 26 - demolition of 3-story 7 residential units. (#44, 46, 48, 50, 52, 54, 56 middle point rd.)Details
bldg# 26 - demolition of 3-story 7 residential units. (#44, 46, 48, 50, 52, 54, 56 middle point rd.) | $15,759 | |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 41 West Point Rd | bldg 28 - demolition of 2-story 6 residential units. (#41, 43, 45, 47. 49, 51 west point rd.)Details
bldg 28 - demolition of 2-story 6 residential units. (#41, 43, 45, 47. 49, 51 west point rd.) | $14,821 | |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 82 Middle Point Rd | bldg# 36 - demolition of 3-story 8 residential units. (#82, 84, 86, 88, 90, 92, 94, 96 middle point rd.)Details
bldg# 36 - demolition of 3-story 8 residential units. (#82, 84, 86, 88, 90, 92, 94, 96 middle point rd.) | $17,896 | |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 66 Middle Point Rd | Cahill-Nibbi Joint Venture | bldg# 35 - demolition of 3-story 8 residential units. (#66 - 80 middle point rd.)Details
bldg# 35 - demolition of 3-story 8 residential units. (#66 - 80 middle point rd.) | $17,896 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 30 Middle Point Rd | Cahill-Nibbi Joint Venture | bldg# 25 - demolition of 3-story 7 residential units. (#30 - 42 middle point rd.)Details
bldg# 25 - demolition of 3-story 7 residential units. (#30 - 42 middle point rd.) | $15,759 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 71 West Point Rd | Cahill-Nibbi Joint Venture | bldg# 29 - demolition of 2-story 4 residential units. (71, 73, 75, 77 west point rd.)Details
bldg# 29 - demolition of 2-story 4 residential units. (71, 73, 75, 77 west point rd.) | $9,902 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 58 Middle Point Rd | Cahill-Nibbi Joint Venture | bldg# 34 - demolition of 2-story 4 residential units. (58, 60, 62, 64 middle point rd.)Details
bldg# 34 - demolition of 2-story 4 residential units. (58, 60, 62, 64 middle point rd.) | $11,009 |
| Jan 7, 2010 | Completed final sign-off Jan 2012 | 11 West Point Rd | Cahill-Nibbi Joint Venture | bldg 27 - demolition of 2-story 4 residential units. (#11, 13, 15, & 17 west point rd.)Details
bldg 27 - demolition of 2-story 4 residential units. (#11, 13, 15, & 17 west point rd.) | $11,009 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 61 West Point Rd | Cahill-Nibbi Joint Venture | to erect 4 stories, 13 units residential building.Details
to erect 4 stories, 13 units residential building. | $5,100,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 11 West Point Rd | Cahill-Nibbi Joint Venture | to erect 4 stories, 11 units residential building.Details
to erect 4 stories, 11 units residential building. | $4,700,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 63 West Point Rd | Cahill-Nibbi Joint Venture | to erect 4 stories, 15 units residential building.Details
to erect 4 stories, 15 units residential building. | $6,000,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2014 | 52 Middle Point Rd | Cahill-Nibbi Joint Venture | to erect 4 stories, 13 units residential building.Details
to erect 4 stories, 13 units residential building. | $4,900,000 |
| Sep 23, 2003 | Completed final sign-off Oct 2003 | 125 West Point Rd | Ics Associates Inc | renew expired appn. 200201126827 for final inspDetails
renew expired appn. 200201126827 for final insp | |
| Jan 12, 2002 | Completed final sign-off Oct 2003 | 125 West Point Rd | disabled access barrier removal upgrade to entrance doors toilet rms kitchen signage electrical acceDetails
disabled access barrier removal upgrade to entrance doors toilet rms kitchen signage electrical acce | $107,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill-Nibbi Joint Venture (21), R T S Systems And Design Llc (8), Pribuss Engineering Inc (4), Ics Associates Inc
- Architects
- Thomas Johnson (8)
- Engineers
- Carlile Macy (8), David Hanson (2), Kevin O'connor (2), James Fain, John W. Laws, Ronald F Nelson
- Authorized agent-otherss
- Robert Stark (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.