Block 4580, lot 002
1000 Evans Ave
- City’s use
- Industrial
- Built
- 1947
- Stories
- 2
- Lot
- 874,684 sq ft
- Zoning
- M2
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 30, 2016 | Never finaled issued Aug 2016, no final | 1000 Evans Av | Erm-West, Inc. | remedial excavation and fill along with general excavation to facilitate the installation of park features.< than 5ftDetails
remedial excavation and fill along with general excavation to facilitate the installation of park features.< than 5ft | $500,000 |
| May 25, 2016 | Never finaled issued Sep 2016, no final | 1000 Evans Av | Erm-West, Inc. | remediation grading/excavaion/backfill & shoreline restoration. installation of park features including electrial & plumbing.Details
remediation grading/excavaion/backfill & shoreline restoration. installation of park features including electrial & plumbing. | $7,000,000 |
| Sep 24, 2015 | Never finaled issued Oct 2015, no final | 1000 Evans Av | Sequoia Construction & Development Inc | revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill.Details
revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill. | $140,000 |
| Sep 15, 2015 | Never finaled issued Dec 2015, no final | 1000 Evans Av | Erm-West, Inc. | new privately-owned publicly-accessible space at the corner of evans ave. and jennings st., on the frontage to an (e) pg&e facility. new retaining walls, vertical decoratie steel walls, seating & lighting to be included. maher naDetails
new privately-owned publicly-accessible space at the corner of evans ave. and jennings st., on the frontage to an (e) pg&e facility. new retaining walls, vertical decoratie steel walls, seating & lighting to be included. maher na | $1,500,000 |
| Oct 9, 2012 | Completed final sign-off Dec 2012 | 1000 Evans Av | Sequoia Construction & Development Inc | fill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required.Details
fill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required. | $733,000 |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 1000 Evans Av | street spaceDetails
street space | ||
| May 10, 2011 | Never finaled issued May 2011, no final | 1000 Evans Av | Engineering Remediation Resources Group | shoring added as shown to permit #1217452 (pa #2010-0625-5335). scope of work: shoring as required for work under pa#2010-0625-5335.Details
shoring added as shown to permit #1217452 (pa #2010-0625-5335). scope of work: shoring as required for work under pa#2010-0625-5335. | $300,000 |
| May 5, 2011 | Completed final sign-off May 2011 | 1000 Evans Av | Engineering Remediation Resources Group | revision to appl.#201004130169; to relocate already approved temporary trailer to a (n) location within the site (from 151 jennings to 1000 evans st.)Details
revision to appl.#201004130169; to relocate already approved temporary trailer to a (n) location within the site (from 151 jennings to 1000 evans st.) | |
| Sep 28, 2009 | Completed final sign-off Aug 2015 | 1000 Evans Av | T R C Solutions Inc. | install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth.Details
install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth. | $123,938 |
| Jun 5, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | T R C Solutions Inc. | revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4.Details
revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4. | $51,000 |
| May 22, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | T R C Solutions Inc. | felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461.Details
felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461. | $51,000 |
| Dec 15, 2005 | Completed final sign-off Aug 2015 | 1000 Evans Av | to demolish power plant.Details
to demolish power plant. | ||
| Dec 15, 2005 | Completed final sign-off Aug 2015 | 1000 Evans Av | to demolish power plant.Details
to demolish power plant. | ||
| Dec 15, 2005 | Completed final sign-off Aug 2015 | 1000 Evans Av | to demolish power plant.Details
to demolish power plant. | ||
| Dec 15, 2005 | Completed final sign-off Aug 2015 | 1000 Evans Av | to demolish power plant.Details
to demolish power plant. | ||
| Dec 15, 2005 | Completed final sign-off Aug 2015 | 1000 Evans Av | demolition of power plant.Details
demolition of power plant. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Erm-West, Inc. (3), T R C Solutions Inc. (3), Engineering Remediation Resources Group (2), Sequoia Construction & Development Inc (2)
- Architects
- Barbara Lundburg, Douglas Burnham
- Engineers
- Joshua Thomas (2), Ghd/Jason Lin, Joe Farre