Joshua Thomas
- License
- 83610
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- authorized agent-others, engineer
- Firm
- Arup North America Ltd.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Sep 2015
3 permits since 2000 (engineer on 2 permits, authorized agent-others on 1 permit): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Erm-West, Inc., Sequoia Construction & Development Inc
- Architects
- Barbara Lundburg, I-Studios I-Studios
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2015 | Never finaled issued Oct 2015, no final | 1000 Evans Av | Sequoia Construction & Development Inc | revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill.Details
revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill. | $140,000 |
| Sep 15, 2015 | Never finaled issued Dec 2015, no final | 1000 Evans Av | Erm-West, Inc. | new privately-owned publicly-accessible space at the corner of evans ave. and jennings st., on the frontage to an (e) pg&e facility. new retaining walls, vertical decoratie steel walls, seating & lighting to be included. maher naDetails
new privately-owned publicly-accessible space at the corner of evans ave. and jennings st., on the frontage to an (e) pg&e facility. new retaining walls, vertical decoratie steel walls, seating & lighting to be included. maher na | $1,500,000 |
| Nov 10, 2004 | Completed final sign-off Oct 2006 | 816 Larkin St | to comply with nov# 200342503, new non-bearing partitions for 15 booths at first & mezzanine floors.Details
to comply with nov# 200342503, new non-bearing partitions for 15 booths at first & mezzanine floors. | $15,000 |