Sequoia Construction & Development Inc
- Based in
- Martinez
- On San Francisco permits
- Jun 2012 to Sep 2015
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2015 | Never finaled issued Oct 2015, no final | 1000 Evans Av | revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill.Details
revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill. | $140,000 |
| Oct 9, 2012 | Completed final sign-off Dec 2012 | 1000 Evans Av | fill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required.Details
fill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required. | $733,000 |
| Sep 26, 2012 | Completed final sign-off Dec 2012 | 1180 Evans Av | fine grade lot. install 6" (4" baserock, 2" asphalt) parving. install drainage system.Details
fine grade lot. install 6" (4" baserock, 2" asphalt) parving. install drainage system. | $450,000 |
| Jun 4, 2012 | Completed final sign-off Jan 2013 | 151 Jennings St | revision to 20100625335. incude area b phase 2 detail for grading plan. paving included. no excavation under this permit.Details
revision to 20100625335. incude area b phase 2 detail for grading plan. paving included. no excavation under this permit. | $366,450 |