Block 4343, lot 004
200 Napoleon St
- City’s use
- Industrial
- Built
- 1948
- Stories
- 1
- Rooms
- 5 bathrooms
- Building
- 28,300 sq ft
- Lot
- 214,999 sq ft
- Zoning
- M2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2024 | In progress issued Mar 2025 | 200 Napoleon St | Cold Storage Manufacturing Inc | remove cold storage insulated walls, floor insulation and refrigeration equipoemnt. revert to original warehouse. existing sprinklers, lights and fire alarm to remain in warehouse demo only ti under separate permitDetails
remove cold storage insulated walls, floor insulation and refrigeration equipoemnt. revert to original warehouse. existing sprinklers, lights and fire alarm to remain in warehouse demo only ti under separate permit | $400,000 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 180 Napoleon St | Johnson Controls Security Solutions Llc | install new facu to replace (e) facp due to obsolescene and add a new ip fire communicator ar facu, reconnect all (e) dewvices to new facu. no other changes will be made to (e) system maher naDetails
install new facu to replace (e) facp due to obsolescene and add a new ip fire communicator ar facu, reconnect all (e) dewvices to new facu. no other changes will be made to (e) system maher na | $1,300 |
| Aug 23, 2016 | Completed final sign-off Aug 2016 | 190 Napoleon St | to obtain fifnal inspection for work approved under pa#201108152475. all work is complete.Details
to obtain fifnal inspection for work approved under pa#201108152475. all work is complete. | ||
| Aug 1, 2016 | Completed final sign-off Apr 2017 | 190 Napoleon St | Johnson Controls Security Solutions Llc | revision to ref pa 201606281138: replacing (e) fire alarm panel with new fire alarm panel. replace (e) fire keypads with new. reconnect all (e) devices to new fire alarm panelDetails
revision to ref pa 201606281138: replacing (e) fire alarm panel with new fire alarm panel. replace (e) fire keypads with new. reconnect all (e) devices to new fire alarm panel | $900 |
| Jun 28, 2016 | Never finaled issued Jun 2016, no final | 190 Napoleon St | Johnson Controls Security Solutions Llc | adding a zone expander module to existing fire alaram panel. (2) new water flow switches and (2) new tampers switches will be connected to the zone expander.Details
adding a zone expander module to existing fire alaram panel. (2) new water flow switches and (2) new tampers switches will be connected to the zone expander. | $800 |
| Jun 3, 2016 | Completed final sign-off Apr 2017 | 190 Napoleon St | S A Selover Const Operation | construction phase change to work approved under pa# 201603162202, add electrical plan and title-24 compliance documents. n/a ordinance #155-13Details
construction phase change to work approved under pa# 201603162202, add electrical plan and title-24 compliance documents. n/a ordinance #155-13 | $7,500 |
| May 25, 2016 | Completed final sign-off Apr 2017 | 190 Napoleon St | S A Selover Const Operation | access improvements: demo (e) non compliant platform lift and demo (e) stair @ main entrance. install new accessible platform lift and rebuild a new stair at main entrance, maher naDetails
access improvements: demo (e) non compliant platform lift and demo (e) stair @ main entrance. install new accessible platform lift and rebuild a new stair at main entrance, maher na | $40,000 |
| Apr 21, 2016 | Completed final sign-off Dec 2016 | 190 Napoleon St | Station 1 Fire Protection | adding fire sprinklers in new paint booth and mix room. t.i. app#2015-1215-5151. n/a for maherDetails
adding fire sprinklers in new paint booth and mix room. t.i. app#2015-1215-5151. n/a for maher | $10,200 |
| Mar 16, 2016 | Completed final sign-off Apr 2017 | 190 Napoleon St | S A Selover Const Operation | construction phase changes to work approved under pa#201512155151, office layout changes and spray booth layout changes, delete note "mechanical and electrical under separate permit". n/a ordinance #155-13Details
construction phase changes to work approved under pa#201512155151, office layout changes and spray booth layout changes, delete note "mechanical and electrical under separate permit". n/a ordinance #155-13 | $10,000 |
| Dec 15, 2015 | Completed final sign-off Apr 2017 | 190 Napoleon St | S A Selover Const Operation | 1st floor t.i. - install spray booth . mech & elect under separate permits. n/a maher ordinanceDetails
1st floor t.i. - install spray booth . mech & elect under separate permits. n/a maher ordinance | $50,000 |
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 190 Napoleon St | to obtain final inspection for work approved under pa#201109305940. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#201109305940. all work is complete. n/a for maher. | ||
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 190 Napoleon St | to obtain final inspection for work approved under pa#201109305834. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#201109305834. all work is complete. n/a for maher. | ||
| Dec 14, 2015 | Expired or cancelled expired Aug 2016 | 190 Napoleon St | to obtain final inspection for work approved under pa#201108152475. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#201108152475. all work is complete. n/a for maher. | ||
| Feb 26, 2014 | Never finaled issued Feb 2014, no final | 190 Napoleon St | street space permitDetails
street space permit | ||
| Feb 14, 2014 | Completed final sign-off Mar 2015 | 180 Napoleon St | Narrowback Construction Co. | replace existing exterior door to allow for raising of back of sidewalk as required by sfdpw per pending permit 11e-0478. compliance with ordinance #155-13 not required.Details
replace existing exterior door to allow for raising of back of sidewalk as required by sfdpw per pending permit 11e-0478. compliance with ordinance #155-13 not required. | $1,000 |
| Sep 30, 2011 | Completed final sign-off Feb 2016 | 190 Napoleon St | G P Fire Protection | relocate 3 upright sprinklers for new ductwork plenumDetails
relocate 3 upright sprinklers for new ductwork plenum | $2,400 |
| Sep 30, 2011 | Expired or cancelled expired Aug 2016 | 190 Napoleon St | Sausal Corporation | revision to pa# 2011-0815-2475-construction phase change to work already under way, demolish (e) non compliant stair & replace with new code compliant stairsDetails
revision to pa# 2011-0815-2475-construction phase change to work already under way, demolish (e) non compliant stair & replace with new code compliant stairs | $2,500 |
| Aug 15, 2011 | Expired or cancelled expired Aug 2016 | 190 Napoleon St | Sausal Corporation | change of use from (e) warehouse to (n) vehicle maintenace facility /repair garage with no toxic materials. work incl. demising wall, new exterioropennings, mech vent syst for vehicle exhaust, waste water teratment sys for vehicle washing, and sidewalk.Details
change of use from (e) warehouse to (n) vehicle maintenace facility /repair garage with no toxic materials. work incl. demising wall, new exterioropennings, mech vent syst for vehicle exhaust, waste water teratment sys for vehicle washing, and sidewalk. | $80,000 |
| Jul 9, 2007 | Expired or cancelled expired Mar 2013 | 200 Napoleon St | Ames-Billingsley, Inc. | install 4 replacement windows. all visable from street. new windows to be brown aluminium casements to match center room. u-value .38 - .52Details
install 4 replacement windows. all visable from street. new windows to be brown aluminium casements to match center room. u-value .38 - .52 | $6,000 |
| Feb 10, 2006 | Completed final sign-off Apr 2006 | 200 Napoleon St | Walschon Fire Protection Inc | install new mains and branchline piping to supply dry pendant fire sprinkler in new freezer & cooler boxes. 148 sprinkler heads.Details
install new mains and branchline piping to supply dry pendant fire sprinkler in new freezer & cooler boxes. 148 sprinkler heads. | $34,000 |
| Jan 5, 2006 | Completed final sign-off Apr 2006 | 200 Napoleon St | to install new loading ramp at front of property. ada compliance as per 200512160545 as well as revisionDetails
to install new loading ramp at front of property. ada compliance as per 200512160545 as well as revision | $35,000 | |
| Dec 16, 2005 | Completed final sign-off Apr 2006 | 200 Napoleon St | install new loading dock and add new interior frames and panels for new coolerr, freezer and processing units.Details
install new loading dock and add new interior frames and panels for new coolerr, freezer and processing units. | $30,000 | |
| Dec 13, 2002 | Never finaled issued Dec 2002, no final | 180 Napoleon St | Emerald Plbg & Fire Protection | provide fire sprinkler system to (e) system for new mezz. 14 headsDetails
provide fire sprinkler system to (e) system for new mezz. 14 heads | $2,000 |
| Jun 3, 2002 | Never finaled issued Sep 2002, no final | 180 Napoleon St | expansion of current offices/new bthrm/new entry of show room for doors and wndws/hndycap liftDetails
expansion of current offices/new bthrm/new entry of show room for doors and wndws/hndycap lift | $120,000 | |
| Apr 13, 2001 | Completed final sign-off May 2001 | 180 Napoleon St | Amwest Mechanical Inc | 3 new heads on (e) pipe schedule systemDetails
3 new heads on (e) pipe schedule system | $400 |
| Mar 20, 2001 | Completed final sign-off Mar 2001 | 200 Napoleon St | Arrow Sign Company | erect a non-electric, single faced wall signDetails
erect a non-electric, single faced wall sign | |
| Nov 3, 2000 | Expired or cancelled expired Jun 2001 | 200 Napoleon St | modified loading ramp & protective curb.Details
modified loading ramp & protective curb. | $18,000 | |
| Mar 27, 2000 | Completed final sign-off May 2001 | 180 Napoleon St | installation of new accessible exits from warehouise #2 to comply w/ exiting/accessibility requiremeDetails
installation of new accessible exits from warehouise #2 to comply w/ exiting/accessibility requireme | $81,834 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S A Selover Const Operation (4), Johnson Controls Security Solutions Llc (3), Sausal Corporation (2), Ames-Billingsley, Inc., Amwest Mechanical Inc, Arrow Sign Company, Cold Storage Manufacturing Inc, Emerald Plbg & Fire Protection, G P Fire Protection, Narrowback Construction Co., Station 1 Fire Protection, Walschon Fire Protection Inc
- Architects
- Harvey Hacker (6), James Terry
- Engineers
- Meng Hsiu Chen, Rodrigo Santos
Find contractors for work like this