Block 4158, lot 065
2115 22nd St
- City’s use
- Multi-Family Residential
- Built
- 1980
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,172 sq ft
- Lot
- 1,875 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 2115 22nd St | street space | ||
| Dec 26, 2018 | Expired or cancelled cancelled Jan 2026 | 2115 22nd St | chemical grouting at 2119 22nd st & 2115, 2115a & 2117 22nd st property 4158Details
chemical grouting at 2119 22nd st & 2115, 2115a & 2117 22nd st property 4158 | $8,000 | |
| Sep 7, 2017 | Completed final sign-off Oct 2017 | 2115 22nd St | M & L Construction | repair less than 50% of stairs at side of property - replace dry rotDetails
repair less than 50% of stairs at side of property - replace dry rot | $3,500 |
| Nov 23, 2011 | Never finaled issued Nov 2011, no final | 2115 22nd St | A B C Window Contractors | install 9 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street all windows will be double pane and have a u-factor of .30, no egress changesDetails
install 9 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street all windows will be double pane and have a u-factor of .30, no egress changes | $3,775 |
| Aug 3, 2007 | Completed final sign-off Nov 2007 | 2115 22nd St | C T Construction & Plumb | infill kitchen door, replace carbinets and install new fixtures in bathroom. all work in unit #1 only. no lighting wk.Details
infill kitchen door, replace carbinets and install new fixtures in bathroom. all work in unit #1 only. no lighting wk. | $2,000 |
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 2115 22nd St | additional house number | ||
| Dec 6, 2004 | Completed final sign-off Dec 2004 | 2115 22nd St | Ames-Billingsley, Inc. | install 8 replacement windows. unit 2117 facing stDetails
install 8 replacement windows. unit 2117 facing st | $3,680 |
| Nov 12, 2004 | Never finaled issued Nov 2004, no final | 2115 22nd St | Rescue Roofing Co | reroofing. | $3,200 |
| Aug 24, 2004 | Completed final sign-off Aug 2004 | 2115 22nd St | North Berkeley Construct | termite report#11132 items 3b,3c,3d,5a less than 50% of structureDetails
termite report#11132 items 3b,3c,3d,5a less than 50% of structure | $2,000 |
| Aug 29, 2003 | Never finaled issued Aug 2003, no final | 2115 22nd St | Simplex Grinnell*** See 802591**** | replace existing painted sprinkler head w/new sprkl head, one each w/same temp orifice & k-fctrDetails
replace existing painted sprinkler head w/new sprkl head, one each w/same temp orifice & k-fctr | $350 |
| Aug 29, 2003 | Never finaled issued Aug 2003, no final | 2117 22nd St | Simplex Grinnell*** See 802591**** | replace (6each)six sprinkler heads that are painted w/ 6 each new sprinkler heads w/ same temp.Details
replace (6each)six sprinkler heads that are painted w/ 6 each new sprinkler heads w/ same temp. | $7,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Simplex Grinnell*** See 802591**** (2), A B C Window Contractors, Ames-Billingsley, Inc., C T Construction & Plumb, M & L Construction, North Berkeley Construct, Rescue Roofing Co
- Engineers
- Jefferson Chen, Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.