Block 4149, lot 035A
2811 22nd St
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,100 sq ft
- Lot
- 2,596 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2019 | Expired or cancelled cancelled Jan 2026 | 2811 22nd St | remove wall add wood beam and post on 2nd flDetails
remove wall add wood beam and post on 2nd fl | $20,000 | |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 2811 22nd St | G R C Roofing Inc. | re-roofingDetails
re-roofing | $13,000 |
| Apr 19, 2019 | Completed final sign-off Apr 2019 | 2811 22nd St | Ikb Stone Inc | built decorative fence per plans - horizontal redwood slab matching contour of existing neighbor fences, not to exceed 9'8" on the east wall of the property.Details
built decorative fence per plans - horizontal redwood slab matching contour of existing neighbor fences, not to exceed 9'8" on the east wall of the property. | $7,000 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 2811 22nd St | street spaceDetails
street space | ||
| Dec 18, 2018 | Completed final sign-off May 2019 | 2811 22nd St | Ikb Stone Inc | revision to 201810314600 remove w.l.b. partition. install/replace interior railing. r.i.k upper flr windowsDetails
revision to 201810314600 remove w.l.b. partition. install/replace interior railing. r.i.k upper flr windows | $15,000 |
| Oct 31, 2018 | Completed final sign-off Apr 2019 | 2811 22nd St | Ikb Stone Inc | modify non-structural partitions at 1st flr. renovate (e) bathroom, modify bedroom closetDetails
modify non-structural partitions at 1st flr. renovate (e) bathroom, modify bedroom closet | $40,000 |
| Oct 15, 2018 | Expired or cancelled withdrawn Oct 2018 | 2811 22nd St | modify non-structural partitions on 1st level. renovate an (e) bathroom. modify existing water heater closet. the work adds 96 sf of habitable spaceDetails
modify non-structural partitions on 1st level. renovate an (e) bathroom. modify existing water heater closet. the work adds 96 sf of habitable space | $30,000 | |
| Oct 5, 2018 | Completed final sign-off May 2019 | 2811 22nd St | Ikb Stone Inc | remodel 2 bathrooms in 2nd floor. replace fixtures, shower and tub surrounds, tile floor. no structural work. replace in kind. kitchen remodel in kind.Details
remodel 2 bathrooms in 2nd floor. replace fixtures, shower and tub surrounds, tile floor. no structural work. replace in kind. kitchen remodel in kind. | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ikb Stone Inc (4), G R C Roofing Inc.
- Architects
- Thomas Biggs, Thomas Dutton Biggs
- Engineers
- Darren Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.