Block 2045, lot 001
1801 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1948
- Stories
- 2
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 5,650 sq ft
- Lot
- 3,249 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 1801 08th Av | unit #4: replace bathroom floor and wall tiles. replace bathtub and toilet. 1 bathroom remodel.Details
unit #4: replace bathroom floor and wall tiles. replace bathtub and toilet. 1 bathroom remodel. | $6,000 | |
| Aug 11, 2020 | Completed final sign-off Oct 2020 | 1801 08th Av | Atlantic Construction Co Inc | unit #5: replace two (2) existing operable windows facing the street with the same size and material windowsDetails
unit #5: replace two (2) existing operable windows facing the street with the same size and material windows | $1,500 |
| Jul 13, 2020 | Completed final sign-off Jul 2020 | 1801 08th Av | Atlantic Construction Co Inc | replace two (2) existing windows. 1 window facing the front and 1 window facing the side of the building. existng windows are made of wood. new replacement windows will be wood as well. new windows will be the same size and same location as the existing ones.Details
replace two (2) existing windows. 1 window facing the front and 1 window facing the side of the building. existng windows are made of wood. new replacement windows will be wood as well. new windows will be the same size and same location as the existing ones. | $1,500 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 1801 08th Av | Qse Construction | to comply with nov establish secondary means of egress, install new ballisters at rear stairway, landings and guard rail; install new illuminated exit signs with lamp heads, install 3 fire related doors, relocate main dor in (e) garage door.Details
to comply with nov establish secondary means of egress, install new ballisters at rear stairway, landings and guard rail; install new illuminated exit signs with lamp heads, install 3 fire related doors, relocate main dor in (e) garage door. | $15,000 |
| Sep 23, 2016 | Completed final sign-off Jul 2017 | 1801 08th Av | Qse Construction | soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4. to comply with complaint# 200838358.Details
soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4. to comply with complaint# 200838358. | $60,000 |
| May 1, 2015 | Expired or cancelled withdrawn Mar 2017 | 1801 08th Av | comply with nov#200838358 establish secondary means of egress, install new balusters at rear stairway, landings and guard rail, install new illuminated exit signs with lamp heads, install 3 fire reated doors, relocate man-door in (e) garage door.Details
comply with nov#200838358 establish secondary means of egress, install new balusters at rear stairway, landings and guard rail, install new illuminated exit signs with lamp heads, install 3 fire reated doors, relocate man-door in (e) garage door. | $15,000 | |
| Apr 11, 2008 | Completed final sign-off Apr 2008 | 1801 08th Av | replace 3 existing overhead garage doors with similar wood doors.Details
replace 3 existing overhead garage doors with similar wood doors. | $2,100 | |
| Aug 4, 2006 | Never finaled issued Aug 2006, no final | 1801 08th Av | streetspaceDetails
streetspace |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Atlantic Construction Co Inc (2), Qse Construction (2)
- Engineers
- Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.