Block 1521, lot 008
453 23rd Ave
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 3
- Units
- 4
- Rooms
- 10 bedrooms, 8 bathrooms
- Building
- 4,043 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2022 | Never finaled issued Dec 2022, no final | 453 23rd Av | M F A Construction Inc | revison to pa#'s 2016-0314-1992 and 2019-0815-8926: remove window in rear and close opening at rear building lower unit.Details
revison to pa#'s 2016-0314-1992 and 2019-0815-8926: remove window in rear and close opening at rear building lower unit. | $400 |
| Jul 26, 2021 | Completed final sign-off Oct 2021 | 451 23rd Av | M F A Construction Inc | to fix rain leader pipe at rear. to comply w/ nov# 20207761.Details
to fix rain leader pipe at rear. to comply w/ nov# 20207761. | $500 |
| Jul 23, 2021 | Never finaled issued Jul 2021, no final | 453 23rd Av | M F A Construction Inc | recommencement and completeion of work approved under pa# 201603141992.Details
recommencement and completeion of work approved under pa# 201603141992. | $15,000 |
| Nov 19, 2020 | Never finaled issued Apr 2021, no final | 453 23rd Av | Victory Fire Protection Inc | new automatic fire sprinkler system overhead through egress per nfpa 13 & rear lower unit (combo) per nfpa 13d; ug (for nfpa 13 system) on separate permit; ref # 2019-0314-1992 & 2019-0815-8926 (for revised floor plan)Details
new automatic fire sprinkler system overhead through egress per nfpa 13 & rear lower unit (combo) per nfpa 13d; ug (for nfpa 13 system) on separate permit; ref # 2019-0314-1992 & 2019-0815-8926 (for revised floor plan) | $4,575 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 451 23rd Av | street spaceDetails
street space | ||
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 451 23rd Av | street spaceDetails
street space | ||
| Aug 15, 2019 | Completed final sign-off Oct 2021 | 453 23rd Av | M F A Construction Inc | rear structure, clean dryrot and replace throughout. redesign both units. add bathroom upstairs. new elec and plumbing. level fl at bottom floor. add new windows.Details
rear structure, clean dryrot and replace throughout. redesign both units. add bathroom upstairs. new elec and plumbing. level fl at bottom floor. add new windows. | $35,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 451 23rd Av | street spaceDetails
street space | ||
| Jun 14, 2019 | Completed final sign-off Oct 2020 | 451 23rd Av | M F A Construction Inc | replace 10 front windows within existing openings with fiberglass-clad wood.Details
replace 10 front windows within existing openings with fiberglass-clad wood. | $4,000 |
| Feb 5, 2019 | Completed final sign-off Oct 2021 | 451 23rd Av | M F A Construction Inc | to comply with nov #201772741. fire damage repair like for like.Details
to comply with nov #201772741. fire damage repair like for like. | $135,000 |
| Jun 7, 2017 | Completed final sign-off Oct 2017 | 451 23rd Av | 1 - 888 - 4 - Abatement Inc | asbestos abatement and soft demolition - removing all finishes, down to studs on interior.Details
asbestos abatement and soft demolition - removing all finishes, down to studs on interior. | $43,934 |
| Mar 18, 2016 | Completed final sign-off Aug 2016 | 453 23rd Av | rear unit: replace kitchen sink & cabinets in 453a - 23rd ave @ upper rear unit. no new appliances, no new lighting.Details
rear unit: replace kitchen sink & cabinets in 453a - 23rd ave @ upper rear unit. no new appliances, no new lighting. | $100 | |
| Mar 14, 2016 | Never finaled issued Aug 2017, no final | 453 23rd Av | comply w/ nov 201692661, to legalize g/f unit per ordinance 43-14 at rear bldg, t0 comply with 201692661, to add 2 bedrooms, 1 full bathroom, kitchen and living room. working at rear building.Details
comply w/ nov 201692661, to legalize g/f unit per ordinance 43-14 at rear bldg, t0 comply with 201692661, to add 2 bedrooms, 1 full bathroom, kitchen and living room. working at rear building. | $2,500 | |
| Feb 3, 2016 | Completed final sign-off Aug 2016 | 451 23rd Av | replace kitchen sink & cabinet in rear of unit 451-a on 3rd fl.Details
replace kitchen sink & cabinet in rear of unit 451-a on 3rd fl. | $200 | |
| Feb 2, 2016 | Completed final sign-off Aug 2016 | 453 23rd Av | repair a few damaged steps and install hand rails on backyard deck and stairs. less than 50% repairs in front and back of stairs.Details
repair a few damaged steps and install hand rails on backyard deck and stairs. less than 50% repairs in front and back of stairs. | $800 | |
| Nov 2, 2012 | Completed final sign-off Nov 2012 | 453 23rd Av | to comply with nov# 201265861, 201272421,201269323, 201269362: provide 1-hr fire rated wall next to water heater.Details
to comply with nov# 201265861, 201272421,201269323, 201269362: provide 1-hr fire rated wall next to water heater. | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M F A Construction Inc (6), 1 - 888 - 4 - Abatement Inc, Victory Fire Protection Inc
- Architects
- Richard A. Hartman
- Engineers
- Ali Abiani (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.