Permit GraphShortlistSan Francisco building permits since 2000

Ali Abiani

License
C57818
Look the license up with the state
Listed as
engineer
Firm
Mfa Engineer
On San Francisco permits
Feb 2019 to Oct 2024

5 permits since 2000 (engineer on 5 permits): 2 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 31, 2024Expired or cancelled
withdrawn Sep 2026
2306 Market Streopening mini-mart. shelfing and equipment. to make existing toilet room accessible, no change in plumbing fixture count.
Details
Permit
202410314169
Status
withdrawn
Filed
Oct 31, 2024
Declared cost
$10,000
Address
2306 Market St

reopening mini-mart. shelfing and equipment. to make existing toilet room accessible, no change in plumbing fixture count.

Open the permit page

$10,000
Aug 24, 2023Never finaled
issued Sep 2023, no final
1524 Powell Stno physical change. to establish the general entertainment use in basement.
Details
Permit
202308245176
Status
issued
Filed
Aug 24, 2023
Permit issued
Sep 1, 2023
Address
1524 Powell St

no physical change. to establish the general entertainment use in basement.

Open the permit page

Jul 25, 2022In progress
issued Dec 2023
160 Sussex StSilicon Valley Renovations Incone story addition. adding 2 bedrooms,2 baths,kitchen remodel and 210 sf new one car garage.
Details
Permit
202207259260
Status
issued
Filed
Jul 25, 2022
Permit issued
Dec 19, 2023
Declared cost
$50,000
Address
160 Sussex St

one story addition. adding 2 bedrooms,2 baths,kitchen remodel and 210 sf new one car garage.

Open the permit page

$50,000
Aug 15, 2019Completed
final sign-off Oct 2021
453 23rd AvM F A Construction Increar structure, clean dryrot and replace throughout. redesign both units. add bathroom upstairs. new elec and plumbing. level fl at bottom floor. add new windows.
Details
Permit
201908158926
Status
complete
Filed
Aug 15, 2019
Permit issued
Sep 10, 2019
Final sign-off
Oct 1, 2021
Declared cost
$35,000
Address
453 23rd Av

rear structure, clean dryrot and replace throughout. redesign both units. add bathroom upstairs. new elec and plumbing. level fl at bottom floor. add new windows.

Open the permit page

$35,000
Feb 5, 2019Completed
final sign-off Oct 2021
451 23rd AvM F A Construction Incto comply with nov #201772741. fire damage repair like for like.
Details
Permit
201902052110
Status
complete
Filed
Feb 5, 2019
Permit issued
Feb 8, 2019
Final sign-off
Oct 1, 2021
Declared cost
$135,000
Address
451 23rd Av

to comply with nov #201772741. fire damage repair like for like.

Open the permit page

$135,000