1 - 888 - 4 - Abatement Inc
- Based in
- Rancho Cordova
- On San Francisco permits
- Jun 2015 to Jul 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 2700 43rd Av | remove and dispose of asbestos drywall throughout from walls and ceiling.Details
remove and dispose of asbestos drywall throughout from walls and ceiling. | $9,253 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 211 Moreland St | remove water and fire damaged drywall approx. 2500 sqft. fire started in middle unit. cover opened area with 5/8" type x sheetrock.Details
remove water and fire damaged drywall approx. 2500 sqft. fire started in middle unit. cover opened area with 5/8" type x sheetrock. | $30,000 |
| Jun 7, 2017 | Completed final sign-off Oct 2017 | 451 23rd Av | asbestos abatement and soft demolition - removing all finishes, down to studs on interior.Details
asbestos abatement and soft demolition - removing all finishes, down to studs on interior. | $43,934 |
| Jun 18, 2015 | Completed final sign-off May 2016 | 1447 Van Dyke Av | removal of asbestos containing drywall (trace< 1%) throughout home. remove cabinets, toilet, tub shower - fire damage repairs to bldg. will be under separate permit with plans - no structural demo by usDetails
removal of asbestos containing drywall (trace< 1%) throughout home. remove cabinets, toilet, tub shower - fire damage repairs to bldg. will be under separate permit with plans - no structural demo by us | $11,000 |