Block 0793, lot 025
481 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 3,100 sq ft
- Lot
- 2,186 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2021 | Completed final sign-off Sep 2021 | 481 Fulton St | comply with nov 202177001. rebuild existing wall in kind by the exit stairs at the top unit. ref 202106091985Details
comply with nov 202177001. rebuild existing wall in kind by the exit stairs at the top unit. ref 202106091985 | $3,000 | |
| Jun 9, 2021 | Completed final sign-off Sep 2021 | 481 Fulton St | repair wall in rear of unit per notice of violation. item #2 attached. 5' x 10'Details
repair wall in rear of unit per notice of violation. item #2 attached. 5' x 10' | $400 | |
| Jan 6, 2021 | Completed final sign-off Jun 2022 | 479 Fulton St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to provide notificationto new adu and to comply with sffc section 1103.7.6.1. ref pa# 2018-1017-3484. ref. sprinkler # 2020-0904-3475.Details
upgrade existing fire alarm system to provide notificationto new adu and to comply with sffc section 1103.7.6.1. ref pa# 2018-1017-3484. ref. sprinkler # 2020-0904-3475. | $15,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2023 | 485 Fulton St | Fire Guard Protection Inc. | install fire sprinkler system per nfpa 13 in. 1 new adu units at first floor only. pa# 201810173484Details
install fire sprinkler system per nfpa 13 in. 1 new adu units at first floor only. pa# 201810173484 | $18,000 |
| Jan 15, 2020 | Completed final sign-off Nov 2020 | 479 Fulton St | revision to 201810153207. replace steel beams in design with engineered wood beams. revise foundation detailDetails
revision to 201810153207. replace steel beams in design with engineered wood beams. revise foundation detail | $150,000 | |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 479 Fulton St | street space onlyDetails
street space only | ||
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 479 Fulton St | street spaceDetails
street space | ||
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 479 Fulton St | street spaceDetails
street space | ||
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 479 Fulton St | street spaceDetails
street space | ||
| Oct 17, 2018 | Completed final sign-off Apr 2023 | 485 Fulton St | Ho Bok Construction | new adu apartment units at basement level per ordinance #162-16; (n) fire sprinklers at entire basement floor per nfpa-13 under separate permit.Details
new adu apartment units at basement level per ordinance #162-16; (n) fire sprinklers at entire basement floor per nfpa-13 under separate permit. | $167,000 |
| Oct 15, 2018 | Completed final sign-off Mar 2021 | 479 Fulton St | voluntary strengthening at the basement level. lower the grade, underpin extg foundation and new configuration per ab-094.Details
voluntary strengthening at the basement level. lower the grade, underpin extg foundation and new configuration per ab-094. | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crime Watch Security Sys Llc, Fire Guard Protection Inc., Ho Bok Construction
- Architects
- Andrew Levine
- Engineers
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.