Block 0741, lot 012
601 Eddy St
- City’s use
- Commercial Hotel
- Built
- 1956
- Stories
- 2
- Units
- 45
- Rooms
- 46 bathrooms
- Building
- 21,895 sq ft
- Lot
- 37,810 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2020 | Never finaled issued Mar 2020, no final | 601 Eddy St | James E Roberts-Obayashi Corporation | temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks. | $200,000 |
| Jul 14, 2016 | Completed final sign-off Sep 2016 | 601 Eddy St | Advanced Geotechniques Inc. | replace existing wood retaining wall which ranges from 4'5 high with new like and kind wall directly in front of e wal. wall is along south property line between hotel and rental car building. n/a ordinance #155-13Details
replace existing wood retaining wall which ranges from 4'5 high with new like and kind wall directly in front of e wal. wall is along south property line between hotel and rental car building. n/a ordinance #155-13 | $20,000 |
| Jul 14, 2016 | Completed final sign-off Nov 2016 | 601 Eddy St | Advanced Geotechniques Inc. | comply with nov 201327881, retrofit/repair e masonry retaining wall on e property line along larkin st using hilfller spiral nails through face extending approx 6' into property. work to be performed from public sidewalk maher not reqDetails
comply with nov 201327881, retrofit/repair e masonry retaining wall on e property line along larkin st using hilfller spiral nails through face extending approx 6' into property. work to be performed from public sidewalk maher not req | $50,000 |
| Oct 9, 2015 | Expired or cancelled cancelled Jan 2020 | 601 Eddy St | comply with violation 201327881. remove approx 75' (e) retaining wall and replace. repair/replace (e) sidewalk, chain link fence, concrete planter wall and ashpalt paving as req. (maher ordinance - extended ordinance no.155-13 is required)Details
comply with violation 201327881. remove approx 75' (e) retaining wall and replace. repair/replace (e) sidewalk, chain link fence, concrete planter wall and ashpalt paving as req. (maher ordinance - extended ordinance no.155-13 is required) | $50,000 | |
| Dec 1, 2010 | Never finaled issued Dec 2010, no final | 601 Eddy St | relocate two (e) bars, relcoate (e) sliding windows, demo (e) cmu bearing walls, new structural steel support posts, partial new ceiling, new lightings, changes to exterior courtyard, minor ada revision to (e) restrooms & courtyard door/ramp. relocate (e) steel ramp. changes not visible from street.Details
relocate two (e) bars, relcoate (e) sliding windows, demo (e) cmu bearing walls, new structural steel support posts, partial new ceiling, new lightings, changes to exterior courtyard, minor ada revision to (e) restrooms & courtyard door/ramp. relocate (e) steel ramp. changes not visible from street. | $200,000 | |
| Jan 8, 2010 | Never finaled issued Jan 2010, no final | 601 Eddy St | Premier Security Solutions Corp | replace non-functioning fire alarm control panel. replace (e) fire bells with 6-horn/strobes, add 1-horn/strobe in lobby, add 1-manual fire pull in lobby; add 1-pull at facp; add smoke detector above facp and annunciator in lobby. field verify audibility to achieve minimum 75 dba in sleeping rooms.Details
replace non-functioning fire alarm control panel. replace (e) fire bells with 6-horn/strobes, add 1-horn/strobe in lobby, add 1-manual fire pull in lobby; add 1-pull at facp; add smoke detector above facp and annunciator in lobby. field verify audibility to achieve minimum 75 dba in sleeping rooms. | $4,000 |
| May 10, 2007 | Never finaled issued May 2007, no final | 601 Eddy St | street space & sidewalkDetails
street space & sidewalk | ||
| Oct 20, 2003 | Never finaled issued Oct 2003, no final | 601 Eddy St | sidewalk repairDetails
sidewalk repair | ||
| May 30, 2003 | Completed final sign-off Jun 2003 | 601 Eddy St | Hasz Construction Inc | correct occupancy from b to a.3 per inspection instructionDetails
correct occupancy from b to a.3 per inspection instruction | |
| May 13, 2003 | Completed final sign-off Jun 2003 | 601 Eddy St | increase value of app #2003/01/22/5634 from $35,000 to $55,000 will be paid under generalDetails
increase value of app #2003/01/22/5634 from $35,000 to $55,000 will be paid under general | ||
| May 2, 2003 | Completed final sign-off Jun 2003 | 601 Eddy St | Ok Fire System | install fire suppression wet sytem in hood @ street level restaurantDetails
install fire suppression wet sytem in hood @ street level restaurant | $1,800 |
| Jan 22, 2003 | Never finaled issued Jan 2003, no final | 601 Eddy St | Hasz Construction Inc | relocate bar; install additional restrooms, reconfigure office space, remove & replace existing doorDetails
relocate bar; install additional restrooms, reconfigure office space, remove & replace existing door | $35,000 |
| Dec 13, 2002 | Expired or cancelled expired Apr 2004 | 601 Eddy St | Kim Construction | remodel barriers for disabled accessDetails
remodel barriers for disabled access | $3,500 |
| May 3, 2002 | Expired or cancelled expired Sep 2002 | 601 Eddy St | Kim Construction | dry rot repair in addition to app#2002/04/10/3596.Details
dry rot repair in addition to app#2002/04/10/3596. | $1,200 |
| Apr 10, 2002 | Expired or cancelled expired Apr 2004 | 601 Eddy St | Kim Construction | remove 1 tub and install 1 roll in shower on unit #6Details
remove 1 tub and install 1 roll in shower on unit #6 | $1,800 |