Block 0321, lot 003
455 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 11
- Units
- 44
- Rooms
- 44 bathrooms
- Building
- 29,286 sq ft
- Lot
- 3,933 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2022 | Completed final sign-off Aug 2023 | 455 Hyde St | Axel8 Construction | unit 1104 - convert (e) dining to den; rehab (e) kitchen & bathroom; install washer/dryerDetails
unit 1104 - convert (e) dining to den; rehab (e) kitchen & bathroom; install washer/dryer | $36,000 |
| Jul 7, 2022 | Completed final sign-off Jul 2023 | 455 Hyde St | Axel8 Construction | apt 83. convert existing kitchen to bedroom. convert existing dining to study. relocate kitchen, rehab existing bathroom. install washer and dryer.Details
apt 83. convert existing kitchen to bedroom. convert existing dining to study. relocate kitchen, rehab existing bathroom. install washer and dryer. | $44,000 |
| Apr 19, 2022 | Never finaled issued Jun 2022, no final | 455 Hyde St | Axel8 Construction | unit 72: convert existing kitchen to bedroom. convert existing dining to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 72: convert existing kitchen to bedroom. convert existing dining to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $44,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 455 Hyde St | Axel8 Construction | unit #53: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #53: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $44,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 455 Hyde St | Axel8 Construction | unit #52: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #52: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $44,000 |
| Feb 11, 2022 | Expired or cancelled cancelled Jan 2026 | 455 Hyde St | 34: install one new clothes washer and dryer. no structural wall demo.Details
34: install one new clothes washer and dryer. no structural wall demo. | $4,500 | |
| Feb 11, 2022 | Completed final sign-off Jul 2022 | 455 Hyde St | Axel8 Construction | #44: convert extg dining to den. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
#44: convert extg dining to den. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $40,000 |
| Feb 2, 2022 | Completed final sign-off Jul 2022 | 455 Hyde St | Axel8 Construction | unit 73: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehab (e) bathroom. install washer/dryer.Details
unit 73: convert (e) kitchen to bedroom. convert (e) dining to study. relocate kitchen. rehab (e) bathroom. install washer/dryer. | $42,000 |
| Feb 2, 2022 | Completed final sign-off Jul 2022 | 455 Hyde St | Axel8 Construction | unit 23: convert (e) living to sleeping area. convert (e) dining to living. remodel (e) kitchen and bathroom. install washer/dryer.Details
unit 23: convert (e) living to sleeping area. convert (e) dining to living. remodel (e) kitchen and bathroom. install washer/dryer. | $42,000 |
| Feb 1, 2022 | Never finaled filed Feb 2022, never issued | 455 Hyde St | proposal of three new adus on the ground floor within the envelope of the existing building. relocation of existing laundry room on the same ground level. change of use of existing commercial unit into a residential unit.Details
proposal of three new adus on the ground floor within the envelope of the existing building. relocation of existing laundry room on the same ground level. change of use of existing commercial unit into a residential unit. | $200,000 | |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 455 Hyde St | Caslez Construction Inc | apt 21/3rd flr: convert (e) dining to nook. rehab (e) kitchen & bathroom. install washer/dryer into (e) closet. sprinkler & poss fire alarm under sep permit.Details
apt 21/3rd flr: convert (e) dining to nook. rehab (e) kitchen & bathroom. install washer/dryer into (e) closet. sprinkler & poss fire alarm under sep permit. | $32,000 |
| Jun 7, 2021 | Completed final sign-off Apr 2022 | 455 Hyde St | Caslez Construction Inc | Details
| $40,000 |
| May 20, 2021 | Completed final sign-off Apr 2022 | 455 Hyde St | Caslez Construction Inc | apt 1002: 1. convert (e) dining into study 2. convert (e) kitchen into bedroom 3. relocate (e) ktichen 4. rehab (e) bathroom 5. install washer/dryerDetails
apt 1002: 1. convert (e) dining into study 2. convert (e) kitchen into bedroom 3. relocate (e) ktichen 4. rehab (e) bathroom 5. install washer/dryer | $35,000 |
| Feb 22, 2021 | Expired or cancelled withdrawn Apr 2021 | 455 Hyde St | proposal of three (n) adus on the ground floor within the envelope of the existing building. relocation of existing laundry room on the same ground level.Details
proposal of three (n) adus on the ground floor within the envelope of the existing building. relocation of existing laundry room on the same ground level. | $200,000 | |
| May 14, 2020 | Expired or cancelled cancelled Jan 2026 | 455 Hyde St | unit 64: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 64: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $38,000 | |
| Feb 3, 2020 | Completed final sign-off Sep 2020 | 455 Hyde St | B-Side Inc. | #94: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
#94: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $35,000 |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 455 Hyde St | street spaceDetails
street space | ||
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 455 Hyde St | street spaceDetails
street space | ||
| Nov 13, 2019 | Never finaled issued Feb 2020, no final | 455 Hyde St | B-Side Inc. | #92: install office/den. rehabilitate (e) kitchen & bathroom. install washer/dryer.Details
#92: install office/den. rehabilitate (e) kitchen & bathroom. install washer/dryer. | $45,000 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 455 Hyde St | Axel8 Construction | street spaceDetails
street space | |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 455 Hyde St | street spaceDetails
street space | ||
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 455 Hyde St | street spaceDetails
street space | ||
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 455 Hyde St | Axel8 Construction | unit 2 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer/dryerDetails
unit 2 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer/dryer | $40,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 455 Hyde St | Hue & Cry Security System | voluntary upgrade of fire alarm with like for like fa panel and addition of wirelesss low frequency sounders in all sleeping area to meet code 1103.7.6.1Details
voluntary upgrade of fire alarm with like for like fa panel and addition of wirelesss low frequency sounders in all sleeping area to meet code 1103.7.6.1 | $104,000 |
| May 28, 2019 | Completed final sign-off Aug 2019 | 455 Hyde St | B-Side Inc. | #1-rehabilitate (e) kitchen & bathroom. install w/d. convert (e) kitchen to bedroomDetails
#1-rehabilitate (e) kitchen & bathroom. install w/d. convert (e) kitchen to bedroom | $38,000 |
| May 20, 2019 | Expired or cancelled cancelled Oct 2025 | 457 Hyde St | Aguilera Construction Company | abe#201812122913, to comply with accessible bld entrance program/ord 51-16. reslope recessed entry & install power door operationDetails
abe#201812122913, to comply with accessible bld entrance program/ord 51-16. reslope recessed entry & install power door operation | $10,000 |
| Nov 7, 2017 | Never finaled issued Feb 2018, no final | 455 Hyde St | Euro Plumbing Inc, General Contractor | unit #33: 1)convert extg dining into bedroom. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer.Details
unit #33: 1)convert extg dining into bedroom. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $30,000 |
| Jul 24, 2017 | Completed final sign-off Oct 2017 | 455 Hyde St | Boss Construction Inc. | #84: kitchen revision to pa #201704144013.Details
#84: kitchen revision to pa #201704144013. | |
| Jun 20, 2017 | Completed final sign-off Jul 2022 | 455 Hyde St | Axel8 Construction | unit 43 - convert e kitchen to bedroom, relocate kitchen, rehab e bath, convert e dining rm to study, install washer dryerDetails
unit 43 - convert e kitchen to bedroom, relocate kitchen, rehab e bath, convert e dining rm to study, install washer dryer | $32,000 |
| Apr 14, 2017 | Completed final sign-off Oct 2017 | 455 Hyde St | Boss Construction Inc. | unit #84: rehabilitate (e) kitchen & (e) bathroom. install w/dDetails
unit #84: rehabilitate (e) kitchen & (e) bathroom. install w/d | $27,000 |
| Aug 10, 2016 | Completed final sign-off Sep 2018 | 455 Hyde St | Rain Defense | reroofingDetails
reroofing | $70,000 |
| Jun 24, 2015 | Never finaled issued Sep 2015, no final | 455 Hyde St | B-Side Inc. | unit #81: relocating kitchen, remodel kitchen and remodel bathroom. add new washer and dryer.Details
unit #81: relocating kitchen, remodel kitchen and remodel bathroom. add new washer and dryer. | $10,000 |
| May 14, 2015 | Never finaled issued Jul 2015, no final | 455 Hyde St | B-Side Inc. | remodel unit #41: relocate & remodel kitchen. add new washer/dryer. remodel bathroom in kind; maher ord. #155-13Details
remodel unit #41: relocate & remodel kitchen. add new washer/dryer. remodel bathroom in kind; maher ord. #155-13 | $10,000 |
| Feb 27, 2015 | Never finaled issued Mar 2015, no final | 455 Hyde St | B-Side Inc. | unit #93 remodel - relocating between fixtures & remodel, add new bedroom & new wash & dryer. n/a maher ordinanceDetails
unit #93 remodel - relocating between fixtures & remodel, add new bedroom & new wash & dryer. n/a maher ordinance | $20,000 |
| Jan 29, 2015 | Expired or cancelled cancelled Jan 2026 | 455 Hyde St | unit #1104: remodel and relocate kitchen fixture and cabinets. add new washer and dryer and bedroom.Details
unit #1104: remodel and relocate kitchen fixture and cabinets. add new washer and dryer and bedroom. | $10,000 | |
| Jan 29, 2015 | Never finaled issued Mar 2015, no final | 455 Hyde St | unit #1004: remodel and relocate kitchen fixture and cabinets. add new washer and dryer and bedroom.Details
unit #1004: remodel and relocate kitchen fixture and cabinets. add new washer and dryer and bedroom. | $12,000 | |
| Jan 29, 2015 | Never finaled issued Mar 2015, no final | 455 Hyde St | B-Side Inc. | unit #91: remodel and relocate kitchen fixtures add new washer and dryer and bedroom. n/a for maherDetails
unit #91: remodel and relocate kitchen fixtures add new washer and dryer and bedroom. n/a for maher | $10,000 |
| Jan 29, 2015 | Never finaled issued Mar 2015, no final | 455 Hyde St | B-Side Inc. | remodel unit #1001: relocating of kitchen fixtures and cabinets and new washer and dryer and bedroom.Details
remodel unit #1001: relocating of kitchen fixtures and cabinets and new washer and dryer and bedroom. | $10,000 |
| Jan 14, 2014 | Completed final sign-off Feb 2014 | 455 Hyde St | Malagic Construction | bathroom- new tub surround new tile, floor new sink. layout to remain the same . no walls moved, remove or added.Details
bathroom- new tub surround new tile, floor new sink. layout to remain the same . no walls moved, remove or added. | $2,500 |
| Mar 21, 2012 | Completed final sign-off May 2012 | 455 Hyde St | Liberty Fire Systems Inc | add 2 fire sprinklers laundry room at fire inspection req.Details
add 2 fire sprinklers laundry room at fire inspection req. | $500 |
| Oct 23, 2007 | Expired or cancelled expired Dec 2010 | 455 Hyde St | Cardona Construction | work on unit#42 & #1103. 1 kitchen upgrade cabinets , sink, countertop, flooring. bathroom upgrade tub tile flooring and minor drywall repair. no structural work.Details
work on unit#42 & #1103. 1 kitchen upgrade cabinets , sink, countertop, flooring. bathroom upgrade tub tile flooring and minor drywall repair. no structural work. | $21,500 |
| Jun 12, 2007 | Never finaled issued Jul 2007, no final | 455 Hyde St | voluntary removal razing and demolition of non-conforming, noncomplying general advertising sign. per planning code secs.181(b), 188(b) and 604(h). once commenced, demolition should be completed in a reasonable time.Details
voluntary removal razing and demolition of non-conforming, noncomplying general advertising sign. per planning code secs.181(b), 188(b) and 604(h). once commenced, demolition should be completed in a reasonable time. | $2,000 | |
| Jun 27, 2002 | Expired or cancelled expired Oct 2002 | 455 Hyde St | sidewalk repairDetails
sidewalk repair | ||
| Sep 27, 2001 | Completed final sign-off Oct 2001 | 457 Hyde St | erect non-electric projecting wall sig2nDetails
erect non-electric projecting wall sig2n |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.