Block 0274, lot 016
995 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 5
- Units
- 29
- Rooms
- 29 bathrooms
- Building
- 19,000 sq ft
- Lot
- 4,678 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2025 | Completed final sign-off Aug 2025 | 995 Pine St | Sure, Inc. | unit #405: replace kitchen counter top. remodel (1) bathroom w/ new walk-in shower. new light fixtures in the unit and wiring update.Details
unit #405: replace kitchen counter top. remodel (1) bathroom w/ new walk-in shower. new light fixtures in the unit and wiring update. | $30,000 |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 995 Pine St | The Lawson Roofing Co Inc. | re-roofing with torch down.Details
re-roofing with torch down. | $200,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 995 Pine St | Sure, Inc. | unit #502: (1) 50sf bath remodel. (1) 70sf kitchen remodel. update wiring in the unit w/ (n) breaker panel. (n) light fixtures throughout the unit. in kind remodelDetails
unit #502: (1) 50sf bath remodel. (1) 70sf kitchen remodel. update wiring in the unit w/ (n) breaker panel. (n) light fixtures throughout the unit. in kind remodel | $48,000 |
| Aug 13, 2024 | Completed final sign-off Nov 2024 | 995 Pine St | Sure, Inc. | unit #505: renovate (1) 70 sf small bathroom. no change to layout. no work in kitchen update wiring in the unit. new light fixtures and new electric sub-panel in the unit.Details
unit #505: renovate (1) 70 sf small bathroom. no change to layout. no work in kitchen update wiring in the unit. new light fixtures and new electric sub-panel in the unit. | $25,000 |
| Sep 1, 2022 | Completed final sign-off Dec 2022 | 995 Pine St | Sure, Inc. | unit #301: remodel a total of (1) kitchen (40 sqft) and (1) bathroom (40 sqft). no change to layout or wall, no structural work. (n) light fixtures throughout unit. remodel in kind. maintain 1 hr fire rated ceiling.Details
unit #301: remodel a total of (1) kitchen (40 sqft) and (1) bathroom (40 sqft). no change to layout or wall, no structural work. (n) light fixtures throughout unit. remodel in kind. maintain 1 hr fire rated ceiling. | $37,000 |
| May 2, 2022 | Completed final sign-off Sep 2022 | 995 Pine St | Sure, Inc. | (1) bathroom remodel for each unit. no change to layout or wall. (n) light fixtures throughout the unit. replace kitchen countertop. keep all (e) kitchen cabinet, no change.Details
(1) bathroom remodel for each unit. no change to layout or wall. (n) light fixtures throughout the unit. replace kitchen countertop. keep all (e) kitchen cabinet, no change. | $39,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2021 | 995 Pine St | Sure, Inc. | replace a small section of (3') dryrotted modling on taylor street sideDetails
replace a small section of (3') dryrotted modling on taylor street side | $2,000 |
| Aug 21, 2020 | Completed final sign-off Dec 2020 | 995 Pine St | Crime Watch Security Sys Llc | tenant improvement - upgrade existing fire alarm system to comply with sffc section 103.7.6. ref pa# 201508033172Details
tenant improvement - upgrade existing fire alarm system to comply with sffc section 103.7.6. ref pa# 201508033172 | $45,000 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 995 Pine St | street space | ||
| Jul 29, 2019 | Completed final sign-off Oct 2019 | 995 Pine St | Sure, Inc. | replace kitchen counter tops only, bath room remodeling no change of (e) floor planDetails
replace kitchen counter tops only, bath room remodeling no change of (e) floor plan | $25,000 |
| Dec 7, 2018 | Completed final sign-off Feb 2019 | 995 Pine St | Sure, Inc. | unit 402: one kitchen and one bathroom remodel. no new wall and no existing wall relocation. all plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
unit 402: one kitchen and one bathroom remodel. no new wall and no existing wall relocation. all plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $35,000 |
| Dec 14, 2017 | Expired or cancelled cancelled Feb 2018 | 995 Pine St | Sure, Inc. | kitchen & bath remodeling in unit 101 only. no structural workDetails
kitchen & bath remodeling in unit 101 only. no structural work | $32,000 |
| Jun 6, 2017 | Completed final sign-off Mar 2018 | 995 Pine St | Sure, Inc. | #101- kitchen & bath remodeling in same location. no moving of walls, doors or windows.Details
#101- kitchen & bath remodeling in same location. no moving of walls, doors or windows. | $30,000 |
| Jan 27, 2017 | Never finaled issued Jan 2017, no final | 995 Pine St | street space | ||
| Oct 24, 2016 | Completed final sign-off Dec 2016 | 995 Pine St | Sure, Inc. | #201- kitchen remodeling, bathroom remodeling. no structural work, no wall modification.Details
#201- kitchen remodeling, bathroom remodeling. no structural work, no wall modification. | $30,000 |
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 995 Pine St | street space | ||
| May 11, 2016 | Completed final sign-off Jul 2016 | 995 Pine St | Sure, Inc. | #102- kitchen & bath remodeling, all work in kind. pre-construction meeting with inspector prior to work.Details
#102- kitchen & bath remodeling, all work in kind. pre-construction meeting with inspector prior to work. | $18,000 |
| May 2, 2016 | Expired or cancelled withdrawn May 2016 | 995 Pine St | Sure, Inc. | soft story retrofit per sfbc chapter 34b. engineering criteria 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b. engineering criteria 2012 iebc appendix a-4. | $30,000 |
| Aug 3, 2015 | Completed final sign-off Nov 2016 | 995 Pine St | Sure, Inc. | soft story retrofit per sfbc chapter 34b "2012 iebc appendix a-4." comliance with mandatory soft story retrofit program, iebc sec a4.Details
soft story retrofit per sfbc chapter 34b "2012 iebc appendix a-4." comliance with mandatory soft story retrofit program, iebc sec a4. | $40,000 |
| Jul 28, 2015 | Completed final sign-off Oct 2015 | 995 Pine St | Sure, Inc. | unit 205: replace kitchen counter tops and cabinets. replace bathtub, vanity and tiles in bathroom.Details
unit 205: replace kitchen counter tops and cabinets. replace bathtub, vanity and tiles in bathroom. | $18,000 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 995 Pine St | street space | ||
| May 7, 2015 | Completed final sign-off Jul 2015 | 995 Pine St | Sure, Inc. | unit 203: replace kitchen cabinets & countertops. replace bathroom tiles. replace bathtub, vanity & medicine cabinet.Details
unit 203: replace kitchen cabinets & countertops. replace bathroom tiles. replace bathtub, vanity & medicine cabinet. | $18,000 |
| May 4, 2015 | Completed final sign-off Jul 2015 | 995 Pine St | Sure, Inc. | unit 302: replace kitchen cabinets & countertop; replace bath tiles; replace bathtub, vanity & medicine cabinet. no structural work.Details
unit 302: replace kitchen cabinets & countertop; replace bath tiles; replace bathtub, vanity & medicine cabinet. no structural work. | $18,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 995 Pine St | Sure, Inc. | work in unit #403: kitchen remodel - replace kitchen cabinets & countertops. bathroom remodel - replace bathtub, tiles & vanity. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5.Details
work in unit #403: kitchen remodel - replace kitchen cabinets & countertops. bathroom remodel - replace bathtub, tiles & vanity. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5. | $18,000 |
| Jan 26, 2015 | Completed final sign-off Apr 2015 | 995 Pine St | Sure, Inc. | #304- 8'x8' like for like, replace kitchen cabinet & counter tops. 5'x7' like for like, replace bath tiles, medicine cabinet & vanity.Details
#304- 8'x8' like for like, replace kitchen cabinet & counter tops. 5'x7' like for like, replace bath tiles, medicine cabinet & vanity. | $18,000 |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 995 Pine St | street space permit | ||
| Aug 15, 2013 | Completed final sign-off Oct 2013 | 995 Pine St | Sure, Inc. | unit #204-replace kitchen cabinets & counter top, replace bath tub. replace bathroom tiles. new kitchen window in same location/openingDetails
unit #204-replace kitchen cabinets & counter top, replace bath tub. replace bathroom tiles. new kitchen window in same location/opening | $18,000 |
| Aug 4, 2011 | Completed final sign-off Sep 2011 | 995 Pine St | A B C Window Contractors | #503: install 4 andersen series 100 windows, windows do face the street, install 2 vinyl windows in the rear, no change in size or location, will comply with sect cbc1026 for rescue , all windows be double pane u factor of 30Details
#503: install 4 andersen series 100 windows, windows do face the street, install 2 vinyl windows in the rear, no change in size or location, will comply with sect cbc1026 for rescue , all windows be double pane u factor of 30 | $4,295 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 995 Pine St | Sure, Inc. | unit #406: replace kitchen cabinets. kitchen: at least 50% high efficacy lighting (by wattage) replace bath tub, replace vanity and medicine cabinet. bathroom: high efficacy or occupancy sensor. no new wall & no existing wall relocation. no change to exhaust system.Details
unit #406: replace kitchen cabinets. kitchen: at least 50% high efficacy lighting (by wattage) replace bath tub, replace vanity and medicine cabinet. bathroom: high efficacy or occupancy sensor. no new wall & no existing wall relocation. no change to exhaust system. | $15,000 |
| Sep 21, 2009 | Completed final sign-off Oct 2009 | 995 Pine St | A B C Window Contractors | unit #504: install 6 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 310.4 for rescue. al windows will be double pane and have a u-factor of .30Details
unit #504: install 6 vinyl windows in kind into existing frames, no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 310.4 for rescue. al windows will be double pane and have a u-factor of .30 | $2,770 |
| Jul 24, 2008 | Completed final sign-off Aug 2008 | 995 Pine St | A B C Window Contractors | #304- install 1 vinyl window in kind into (e) frames. no change in size/location. window does not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all window will be doulbe pane and have a u-factor of .30.Details
#304- install 1 vinyl window in kind into (e) frames. no change in size/location. window does not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all window will be doulbe pane and have a u-factor of .30. | $400 |
| May 20, 2008 | Completed final sign-off Aug 2008 | 995 Pine St | Sure, Inc. | work @ unit# 306 & # 505 only. replace kitchen cabinets, bath vanity & bath medicine cabinet.Details
work @ unit# 306 & # 505 only. replace kitchen cabinets, bath vanity & bath medicine cabinet. | $19,000 |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 995 Pine St | A B C Window Contractors | work @ unit# 505 only. install 8 vinyl windows in kind into (e) frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double pane & have a u-factor of 0.30.Details
work @ unit# 505 only. install 8 vinyl windows in kind into (e) frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double pane & have a u-factor of 0.30. | $4,000 |
| Feb 1, 2008 | Completed final sign-off Apr 2008 | 995 Pine St | Sure, Inc. | apt#501.replace kitchen cabinets, tiles in bath tub enclosure, vanity and medicine cabinetDetails
apt#501.replace kitchen cabinets, tiles in bath tub enclosure, vanity and medicine cabinet | $10,000 |
| Oct 25, 2007 | Completed final sign-off Oct 2007 | 995 Pine St | Sure, Inc. | repair dry rot around side gate. trim pieces around gate. replace in kind.Details
repair dry rot around side gate. trim pieces around gate. replace in kind. | $1,500 |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 995 Pine St | Sure, Inc. | work @ unit# 105 only. replace kitchen cabinets. replace bath vanity. replace bath medicine cabinet. installation to comply with tile 24 energy codes.Details
work @ unit# 105 only. replace kitchen cabinets. replace bath vanity. replace bath medicine cabinet. installation to comply with tile 24 energy codes. | $10,000 |
| May 17, 2007 | Completed final sign-off Aug 2007 | 995 Pine St | Sure, Inc. | unit#305. replace kitchen cabinets, replace bath vanity & medicene cabinet on this permit no door or window changes. provide flourescent lights in kitchen & bath.Details
unit#305. replace kitchen cabinets, replace bath vanity & medicene cabinet on this permit no door or window changes. provide flourescent lights in kitchen & bath. | $10,000 |
| May 2, 2007 | Completed final sign-off Jul 2007 | 995 Pine St | A B C Window Contractors | (unit#103,104,203,204,303,403)install 6 vinyl windows in kind into (e) frames. no change in size or location. windows do not face the street. if applicable, bedroom windows, will comply with section 310.4 for rescue. all windows will be double pane and have a u-facator of.30.Details
(unit#103,104,203,204,303,403)install 6 vinyl windows in kind into (e) frames. no change in size or location. windows do not face the street. if applicable, bedroom windows, will comply with section 310.4 for rescue. all windows will be double pane and have a u-facator of.30. | $2,423 |
| Aug 13, 2004 | Completed final sign-off Nov 2004 | 995 Pine St | Lara Construction Co. | #503- remove kit.cabinets,counter.install new kit.cabinets,counter.remove bath fixtures except tub.Details
#503- remove kit.cabinets,counter.install new kit.cabinets,counter.remove bath fixtures except tub. | $9,000 |
| Mar 25, 2004 | Completed final sign-off May 2004 | 995 Pine St | Lara Construction Co. | remove (e) kitchen cabinets & counters, install new kitchenb cabinets & laminate counter, no **Details
remove (e) kitchen cabinets & counters, install new kitchenb cabinets & laminate counter, no ** | $6,400 |
| Feb 5, 2004 | Never finaled issued Feb 2004, no final | 995 Pine St | A B C Window Contractors | install 3 windows into (e) frames, no change in size or locationDetails
install 3 windows into (e) frames, no change in size or location | $1,050 |
| Jan 15, 2004 | Completed final sign-off Mar 2004 | 995 Pine St | Lara Construction Co. | remove & replace kitchen cabs & counter, remove existing bath fixtures & replace -retile shower stalDetails
remove & replace kitchen cabs & counter, remove existing bath fixtures & replace -retile shower stal | $11,248 |
| Nov 12, 2003 | Completed final sign-off Dec 2003 | 995 Pine St | Lara Construction Co. | remove existing kit cabs & counter, install new kit cabs & formica counter, no structural wall removDetails
remove existing kit cabs & counter, install new kit cabs & formica counter, no structural wall remov | $6,200 |
| Jun 4, 2003 | Completed final sign-off Jul 2003 | 995 Pine St | Lara Construction Co. | remove kitchen cabinets&tops,install cabinets&tops.replace tilesin bath.no structural walls removed.Details
remove kitchen cabinets&tops,install cabinets&tops.replace tilesin bath.no structural walls removed. | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (26), A B C Window Contractors (6), Lara Construction Co. (5), Crime Watch Security Sys Llc, The Lawson Roofing Co Inc.
- Engineers
- Donald David
- Authorized agents
- Siu Man (5)
- Designers
- Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.