William Ogle
- Listed as
- architect, authorized agent-others, designer
- Firm
- Ogle Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Aug 2026
20 permits since 2000 (architect on 17 permits, authorized agent-others on 2 permits, designer on 1 permit): 10 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 303 02nd St | Bradshaw Group Inc | ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibmDetails
ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm | $140,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 883 Mission St | Xp Construction Llc. | tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619Details
tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619 | $125,000 |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 915 Bryant St | new 8-story mixed use residential building wtih 14 units shared amenity and ground floor commercial space. approx 17,858 sqft. basement-level 3 type 1a and level 4-level 8 type 3a.Details
new 8-story mixed use residential building wtih 14 units shared amenity and ground floor commercial space. approx 17,858 sqft. basement-level 3 type 1a and level 4-level 8 type 3a. | $7,000,000 | |
| Jun 20, 2025 | In progress issued Sep 2025 | 1407 Lyon St | Bay Build Design Inc | exterior front stair and deck (remodel/replace in kind) within property line of residence. rail material change. stair and deck serve/impact only 1 unit.Details
exterior front stair and deck (remodel/replace in kind) within property line of residence. rail material change. stair and deck serve/impact only 1 unit. | $25,000 |
| Mar 17, 2025 | Completed final sign-off Sep 2025 | 1407 Lyon St | Bay Build Design Inc | 2/f: structural changes based on field conditions. minor revision to permit 202408057940.Details
2/f: structural changes based on field conditions. minor revision to permit 202408057940. | $1,000 |
| Dec 3, 2024 | Completed final sign-off Jul 2026 | 360 Lake St | Bay Build Design Inc | unit #2: renovate condo: open up the kitchen by relocating it to the front and creating an open plan w/ the living room. addition renovation of the bathroom & office and the relocation of the master bedroom. no exterior work performedDetails
unit #2: renovate condo: open up the kitchen by relocating it to the front and creating an open plan w/ the living room. addition renovation of the bathroom & office and the relocation of the master bedroom. no exterior work performed | $200,000 |
| Nov 6, 2024 | Completed final sign-off Jul 2026 | 1325 Filbert St | Bay Build Design Inc | voluntary in-kind replacement of an (e) elevator & motor in a duplex bldg. elevator is interior and starts at ground flr level and serves only to upper duplex unit.Details
voluntary in-kind replacement of an (e) elevator & motor in a duplex bldg. elevator is interior and starts at ground flr level and serves only to upper duplex unit. | $30,000 |
| Oct 2, 2024 | In progress filed Oct 2024, not yet issued | 70 Piedmont St | interior remodel of living room, bedrooms, family area and garage area.Details
interior remodel of living room, bedrooms, family area and garage area. | $400,000 | |
| Aug 5, 2024 | Completed final sign-off Sep 2025 | 1407 Lyon St | Bay Build Design Inc | 2/f: interior remodel of the primary unit in a 3 story building. additional work to include replacement of rear door, windows, and railing. replace front door in existing opening.Details
2/f: interior remodel of the primary unit in a 3 story building. additional work to include replacement of rear door, windows, and railing. replace front door in existing opening. | $249,000 |
| Jul 26, 2023 | Never finaled filed Jul 2023, never issued | 474 17th Av | add sauna to rear yard. add outdoor shower. add privacy screenDetails
add sauna to rear yard. add outdoor shower. add privacy screen | $20,000 | |
| Jul 26, 2023 | Never finaled filed Jul 2023, never issued | 310 Santa Ana Av | change rear door @ rearyard and adding window facing backyard.Details
change rear door @ rearyard and adding window facing backyard. | $10,000 | |
| Aug 17, 2022 | Expired or cancelled cancelled Jan 2026 | 474 17th Av | remodel (e) bathroom & (e) garage renovation to include update finishes & millwork.Details
remodel (e) bathroom & (e) garage renovation to include update finishes & millwork. | $50,000 | |
| Feb 25, 2022 | Completed final sign-off Jun 2023 | 44 Dellbrook Av | Daniel Kelly Construction | revision to 202103045892: 2nd fl ceiling and layout changes to create a cathedral ceiling by extending the (e) pitched roof.Details
revision to 202103045892: 2nd fl ceiling and layout changes to create a cathedral ceiling by extending the (e) pitched roof. | $20,000 |
| Dec 17, 2021 | Completed final sign-off Feb 2022 | 455 Valencia St | D K G Construction Inc | tenant improvement for life style gym, personal service and arts, activities space.Details
tenant improvement for life style gym, personal service and arts, activities space. | $30,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2023 | 44 Dellbrook Av | Daniel Kelly Construction | interior remodel of lower level and partial upper level. select window upgrades. all new finishes.Details
interior remodel of lower level and partial upper level. select window upgrades. all new finishes. | $45,000 |
| Jan 29, 2021 | Completed final sign-off Jun 2023 | 38 Hearst Av | Daniel Kelly Construction | remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath.Details
remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath. | $30,000 |
| Dec 30, 2019 | Completed final sign-off Sep 2022 | 321 Dellbrook Av | Daniel Kelly Construction | rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck.Details
rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck. | $99,000 |
| Sep 6, 2018 | Completed final sign-off Apr 2019 | 1856 Mcallister St | renovate existing single dwelling residence layout to accommodate additional bathrooms while maintaining bedroom count. no change on exterior. swaping kitchen and living room location.Details
renovate existing single dwelling residence layout to accommodate additional bathrooms while maintaining bedroom count. no change on exterior. swaping kitchen and living room location. | $99,000 | |
| Aug 20, 2018 | Never finaled issued May 2022, no final | 244 Douglass St | work @ upper unit only. repair / replace / raise roof with 8 x 12 pitch & crate new floor layout on upper unit# 244. addition include 3 bathrooms & 1 bedroom, 1 office, 1 bar/entertainment, 1 living room.Details
work @ upper unit only. repair / replace / raise roof with 8 x 12 pitch & crate new floor layout on upper unit# 244. addition include 3 bathrooms & 1 bedroom, 1 office, 1 bar/entertainment, 1 living room. | $200,000 | |
| Feb 20, 2018 | Expired or cancelled cancelled Nov 2022 | 150 Lexington St | infill front deck to match existing bay windows & adjust interior walls for layout.Details
infill front deck to match existing bay windows & adjust interior walls for layout. | $79,000 |