Wenjin Situ
- Listed as
- engineer
- Firm
- Situ-Ye Structural Engineering
- Based in
- Sacramento
- On San Francisco permits
- Oct 2025 to Sep 2026
6 permits since 2000 (engineer on 6 permits): 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 279 Diamond St | Centoni Restoration & Development | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard.Details
horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 3230 San Jose Av | 1/f: reconfig and legalize 2nd unit (43-14).2/f: horizontal addition at rear, reconfig layout with 2 new beds and 2 full baths. 3/f: (n) 2 baths and wet bar. garage: relocate w/h,furnance,w/d. ext'r: relocate staircase at rear yard. comply nov202175845.Details
1/f: reconfig and legalize 2nd unit (43-14).2/f: horizontal addition at rear, reconfig layout with 2 new beds and 2 full baths. 3/f: (n) 2 baths and wet bar. garage: relocate w/h,furnance,w/d. ext'r: relocate staircase at rear yard. comply nov202175845. | $250,000 | |
| Aug 21, 2026 | In progress issued Aug 2026 | 279 Diamond St | Centoni Restoration & Development | interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope.Details
interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope. | $180,000 |
| May 26, 2026 | In progress issued May 2026 | 1031 Noriega St | I E General Const Inc | to comply w/ nov# 202652111. rebuild damaged exterior front stairway.Details
to comply w/ nov# 202652111. rebuild damaged exterior front stairway. | $25,000 |
| May 19, 2026 | In progress issued May 2026 | 3956 Washington St | Centoni Restoration & Development | voluntary seismic upgrade and limited gravity framing reinforcement at 1st and 2nd floor. no change in use. occupancy or floor area.Details
voluntary seismic upgrade and limited gravity framing reinforcement at 1st and 2nd floor. no change in use. occupancy or floor area. | $75,000 |
| Oct 24, 2025 | In progress issued Sep 2026 | 547 Edinburgh St | Big 4 Construction | comply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room.Details
comply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room. | $200,000 |