Wayne Erb
- License
- C40183
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Porter & Erb Architects
- Based in
- Montara
- On San Francisco permits
- Aug 2025 to Oct 2026
7 permits since 2000 (architect on 7 permits): 1 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kilrea Construction Inc. (2), Dijeau Poage Construction Inc., Pivotal Builders Inc
- Engineers
- Bonggi Moon
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 379 Hearst Av | new deck at existing lower level,(2) new doors proposed accessing the deck.Details
new deck at existing lower level,(2) new doors proposed accessing the deck. | $33,000 | |
| Oct 7, 2026 | In progress issued Oct 2026 | 106 Gambier St | Kilrea Construction Inc. | interior remodel of kitchen & bathroom within (e) sfr.Details
interior remodel of kitchen & bathroom within (e) sfr. | $75,000 |
| Jul 27, 2026 | In progress issued Sep 2026 | 91 Palm Av | Kilrea Construction Inc. | remodel (e) 719 sf ground floor into attached 719 sf 1 bedroom adu in (e) tenancy in common duplex.Details
remodel (e) 719 sf ground floor into attached 719 sf 1 bedroom adu in (e) tenancy in common duplex. | $100,000 |
| Jul 21, 2026 | In progress issued Oct 2026 | 1621 Diamond St | Pivotal Builders Inc | interior remodel of (e) home to include selective demo and remodel of the kitchen and (2) bathrooms, demo (e) direct vent gas fireplace and replace (1) (e) direct vent gas fireplace in kind. no structural work. replace (e) front door in kind.Details
interior remodel of (e) home to include selective demo and remodel of the kitchen and (2) bathrooms, demo (e) direct vent gas fireplace and replace (1) (e) direct vent gas fireplace in kind. no structural work. replace (e) front door in kind. | $250,000 |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 1427 21st Av | new rear deck with exterior stair and at garde sauna and replace 2 doors.Details
new rear deck with exterior stair and at garde sauna and replace 2 doors. | $52,000 | |
| Jan 15, 2026 | In progress issued Feb 2026 | 3 Mccormick St | kitchen & bathroom remodel. enlargement of 1 window & additional 1 new window.Details
kitchen & bathroom remodel. enlargement of 1 window & additional 1 new window. | $75,000 | |
| Aug 12, 2025 | Completed final sign-off Sep 2026 | 1250 Jones St | Dijeau Poage Construction Inc. | unit:601 interior renovation of an (e) residential unit.scope includes selective demolition of non struct walls and complete remodel of the kitchen and two bathrooms, addition of one bathroom,flooring replacement throughout,and miscellanous interior finish improvements.no structural work proposed.Details
unit:601 interior renovation of an (e) residential unit.scope includes selective demolition of non struct walls and complete remodel of the kitchen and two bathrooms, addition of one bathroom,flooring replacement throughout,and miscellanous interior finish improvements.no structural work proposed. | $500,000 |