Bonggi Moon
- Listed as
- engineer
- Firm
- Sezen & Moon Structural
- Based in
- Campbell
- On San Francisco permits
- Apr 2010 to Jul 2026
10 permits since 2000 (engineer on 10 permits): 4 completed, 3 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 282 Romain St | remove the wall between the kitchen and the dining room. remove the wall between the dining room and the living room. remove the wall between the kitchen & the living room.Details
remove the wall between the kitchen and the dining room. remove the wall between the dining room and the living room. remove the wall between the kitchen & the living room. | $60,000 | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 1427 21st Av | new rear deck with exterior stair and at garde sauna and replace 2 doors.Details
new rear deck with exterior stair and at garde sauna and replace 2 doors. | $52,000 | |
| Apr 29, 2026 | In progress issued Apr 2026 | 57 Oakwood St | unit 59 on level 1: bathroom remodel and lightwell infill (15 sq.ft. only)Details
unit 59 on level 1: bathroom remodel and lightwell infill (15 sq.ft. only) | $20,000 | |
| Apr 25, 2022 | Completed final sign-off Jun 2023 | 1242 23rd Av | Edri Construction Inc *See Notes* | remodel opening 2 livable floors, 3 bed 1.5 bath to 3 bed 2.5 bath. rewire panel upgrade 200 amp.Details
remodel opening 2 livable floors, 3 bed 1.5 bath to 3 bed 2.5 bath. rewire panel upgrade 200 amp. | $180,000 |
| Nov 18, 2020 | Expired or cancelled withdrawn Jul 2021 | 68 Glenview Dr | relocate (e) bathroom at 1st fl. remodel (e) living room at 2nd fl.Details
relocate (e) bathroom at 1st fl. remodel (e) living room at 2nd fl. | $35,000 | |
| Oct 16, 2020 | Never finaled issued Apr 2021, no final | 65 Henry St | La Joya Construction Inc | remodel of (e) sfr. demo of select interior walls. (2)bdrms, (2)bathrms, den entry area & stairs on 1st flr. rear patio on the ground flr. living area, dining, kitchen & lounge on the 2nd flr. replacement of (e)windows. close all complaint #2011-49786, #2012-87434, #2012-82895,#2015-76611.Details
remodel of (e) sfr. demo of select interior walls. (2)bdrms, (2)bathrms, den entry area & stairs on 1st flr. rear patio on the ground flr. living area, dining, kitchen & lounge on the 2nd flr. replacement of (e)windows. close all complaint #2011-49786, #2012-87434, #2012-82895,#2015-76611. | $250,000 |
| Nov 22, 2019 | Completed final sign-off Oct 2022 | 61 Henry St | La Joya Construction Inc | comply with nov# 2014496451, 201878161, 201571201, 2012282895, 201287434 & 201576611. remodel all (e) 3 units. no excavation (reduced scope per applicant)Details
comply with nov# 2014496451, 201878161, 201571201, 2012282895, 201287434 & 201576611. remodel all (e) 3 units. no excavation (reduced scope per applicant) | $250,000 |
| Oct 25, 2019 | Expired or cancelled withdrawn Oct 2022 | 63 Henry St | work for 63 henry only - interior remodel and demo 70.44% of existing walls. deferred submittal for rear deck/stairs and fire sprinklers. units 61 & 65 henry shown on plans for reference onlyDetails
work for 63 henry only - interior remodel and demo 70.44% of existing walls. deferred submittal for rear deck/stairs and fire sprinklers. units 61 & 65 henry shown on plans for reference only | $90,000 | |
| May 27, 2010 | Completed final sign-off Apr 2011 | 363 West Portal Av | Saga Construction & Painting | replacement of dry cleaning machine.Details
replacement of dry cleaning machine. | $20,000 |
| Apr 27, 2010 | Completed final sign-off Jul 2010 | 667 Portola Dr | Young P Hur | dry cleaning machine replacement only.Details
dry cleaning machine replacement only. | $30,000 |