Eduardo Umadhay
- Listed as
- contractor, designer
- Firm
- Umadhay Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Sep 2025
37 permits since 2000 (contractor on 37 permits, designer on 2 permits): 25 completed, 2 in progress, 6 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2025 | In progress issued Sep 2025 | 2695 47th Av | Umadhay Construction & Design | 2400 sqft siding replacement and window replacement. 15 windows total, 13 windows are street facing; u=0.3 max. james hardie siding and trims.Details
2400 sqft siding replacement and window replacement. 15 windows total, 13 windows are street facing; u=0.3 max. james hardie siding and trims. | $18,000 |
| Dec 16, 2024 | In progress issued Apr 2025 | 2792 41st Av | Umadhay Construction & Design | remodel kitchen & bathrm, add a full bathrm on the 2nd fl; add 2 bedrms, family rm, 2 full bathrms on the 1st fl; infill 1st floor space under the 2nd fl bedrm; replace furnace and water heater with tankless typeDetails
remodel kitchen & bathrm, add a full bathrm on the 2nd fl; add 2 bedrms, family rm, 2 full bathrms on the 1st fl; infill 1st floor space under the 2nd fl bedrm; replace furnace and water heater with tankless type | $200,000 |
| Feb 2, 2023 | Completed final sign-off Jul 2024 | 408 Utah St | Umadhay Construction & Design | renovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/fDetails
renovation of (e) 2-story carriage house kitchen & bath, new spiral stairs, replace new partition wall to create office on 2/f | $150,000 |
| Jan 10, 2023 | Expired or cancelled cancelled Jan 2026 | 1062 Huron Av | Umadhay Construction & Design | replacement of sewer line. trenching. cutting of concrete driveway. concrete work.Details
replacement of sewer line. trenching. cutting of concrete driveway. concrete work. | $7,000 |
| Oct 19, 2022 | Never finaled issued Apr 2023, no final | 1068 Huron Av | Umadhay Construction & Design | remodel bedroom, living rom, kitchen and toilet in rear unit. window and door openingsDetails
remodel bedroom, living rom, kitchen and toilet in rear unit. window and door openings | $130,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 2659 Lombard St | Golden Heights Remodeling Inc, Umadhay Construction & Design | unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet.Details
unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet. | $55,000 |
| Dec 6, 2021 | Completed final sign-off Feb 2022 | 232 De Long St | Umadhay Construction & Design | remove/replace roofing, carpentry work, parapet 8" high all around roofing, change roof drain, replacement of damage ceiling, remove/repair decayed rafter by sister joist.Details
remove/replace roofing, carpentry work, parapet 8" high all around roofing, change roof drain, replacement of damage ceiling, remove/repair decayed rafter by sister joist. | $25,000 |
| Nov 10, 2021 | Completed final sign-off Apr 2022 | 53 Van Buren St | Umadhay Construction & Design | replace in kind of fixtures. bathroom remodel.Details
replace in kind of fixtures. bathroom remodel. | $20,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 69 Blair Tr | Umadhay Construction & Design | new 1/2 toilet, electrical and plumbing also carpentry workDetails
new 1/2 toilet, electrical and plumbing also carpentry work | $25,000 |
| Jan 29, 2020 | Completed final sign-off Nov 2021 | 1062 Huron Av | Umadhay Construction & Design | adu of units downstairs, upgrade of electrical to 200 amp repair toilet and bath, provide new kitchenDetails
adu of units downstairs, upgrade of electrical to 200 amp repair toilet and bath, provide new kitchen | $45,000 |
| May 13, 2019 | Never finaled filed May 2019, never issued | 1062 Huron Av | Umadhay Construction & Design | to comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement.Details
to comply with nov 201404731 - legalization of bedroom, upgrade electrical panel, repair toilet & bath, install new connecting stair from 2nd floor to basement. | $45,000 |
| Oct 15, 2018 | Completed final sign-off Feb 2019 | 1062 Huron Av | Umadhay Construction & Design | demo interior tiles, carpentry, plumbing, electrical work. remodel.Details
demo interior tiles, carpentry, plumbing, electrical work. remodel. | $8,000 |
| May 22, 2018 | Never finaled issued May 2018, no final | 247 Madrid St | Umadhay Construction & Design | as built ref 201801027698 to refelct accurate dimesions and furnance movement, and relocate the 20 min self closing door in the (n) bedroom on the ground floor.Details
as built ref 201801027698 to refelct accurate dimesions and furnance movement, and relocate the 20 min self closing door in the (n) bedroom on the ground floor. | |
| Apr 16, 2018 | Completed final sign-off Apr 2018 | 643 19th Av | Umadhay Construction & Design | reroofing.Details
reroofing. | $8,000 |
| Apr 16, 2018 | Expired or cancelled expired Dec 2024 | 643 19th Av | Umadhay Construction & Design | dry rot cause by roof drain. change faucets.Details
dry rot cause by roof drain. change faucets. | $2,000 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 15 Guerrero St | Umadhay Construction & Design | replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. to comply with nov#200343379,item 2.Details
replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. to comply with nov#200343379,item 2. | $5,500 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 21 Guerrero St | Umadhay Construction & Design | replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. also to comply with nov#200997220.Details
replacing 8 to 9 common area windows, replace less than 50% of back stairs due to dry rot. also to comply with nov#200997220. | $5,500 |
| Jan 2, 2018 | Completed final sign-off Nov 2020 | 247 Madrid St | Umadhay Construction & Design | construction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell.Details
construction of 2 bedroom, 1 study room, 1 bath, bar sink, family room @ 1st floor. circular stair to 2nd floor. remodel toiet & add 1 bath @ 2nd floor, install 5x10 lightwell. | $180,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 401 Ramsell St | Umadhay Construction & Design | reroofingDetails
reroofing | $6,500 |
| Sep 21, 2017 | Never finaled issued Sep 2017, no final | 247 Madrid St | Umadhay Construction & Design | reroofingDetails
reroofing | $8,500 |
| Feb 2, 2017 | Completed final sign-off Apr 2017 | 30 Inca Ln | Umadhay Construction & Design | remove & replace kitchen cabinets with like kind. changing all angle stops. adding electrical where needed also adding 1 circuit for dishwasher.Details
remove & replace kitchen cabinets with like kind. changing all angle stops. adding electrical where needed also adding 1 circuit for dishwasher. | $12,000 |
| Jan 17, 2017 | Completed final sign-off May 2017 | 4051 18th St | Umadhay Construction & Design | 10 electrical outlets and 5 faucet & conduits; 5 lavatories in 3 rooms; drywall repair.Details
10 electrical outlets and 5 faucet & conduits; 5 lavatories in 3 rooms; drywall repair. | $6,000 |
| Dec 2, 2016 | Completed final sign-off Jan 2017 | 225 Waller St | Umadhay Construction & Design | converting closet into half bath. installing plumbing for toilet and single vanity. installing electrical for light and gfiDetails
converting closet into half bath. installing plumbing for toilet and single vanity. installing electrical for light and gfi | $7,000 |
| Jul 27, 2016 | Completed final sign-off Sep 2016 | 2205 Sacramento St | Umadhay Construction & Design | kitchen remodel with like kind cabinets, electrical where needed, and new fridge water line; maher n/aDetails
kitchen remodel with like kind cabinets, electrical where needed, and new fridge water line; maher n/a | $10,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2017 | 3166 16th St | Umadhay Construction & Design | t.i. to extg space. new electrical outlets and lighting. add sinks. upgrade extg bathroom for disabled persons. breakroom. to comply with nov #201538583Details
t.i. to extg space. new electrical outlets and lighting. add sinks. upgrade extg bathroom for disabled persons. breakroom. to comply with nov #201538583 | $30,000 |
| Sep 11, 2015 | Completed final sign-off Nov 2015 | 378 Golden Gate Av | Umadhay Construction & Design | kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines,Details
kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines, | $13,000 |
| Dec 29, 2014 | Never finaled issued Dec 2014, no final | 1508 Taraval St | Umadhay Construction & Design | ramp entrance relocation. revision to app#201301077336Details
ramp entrance relocation. revision to app#201301077336 | $1,500 |
| Jul 29, 2014 | Completed final sign-off Sep 2014 | 1508 Taraval St | Umadhay Construction & Design | replacement of stair in-kind @ side of the building (not visible from street). same location.Details
replacement of stair in-kind @ side of the building (not visible from street). same location. | $6,000 |
| Jun 5, 2014 | Never finaled issued Jun 2014, no final | 1186 Geneva Av | Umadhay Construction & Design | repair of roof approximately 35% and repair of sheetrock in bedroomDetails
repair of roof approximately 35% and repair of sheetrock in bedroom | $7,000 |
| May 31, 2013 | Completed final sign-off Aug 2013 | 191 Henry St | Umadhay Construction & Design | change (e) living into a (n) bedroom, demolish fireplace, relocate kitchen- all works are on 1/f.Details
change (e) living into a (n) bedroom, demolish fireplace, relocate kitchen- all works are on 1/f. | $20,000 |
| May 17, 2013 | Completed final sign-off Aug 2013 | 193 Henry St | Umadhay Construction & Design | remodel of bathroom & kitchenDetails
remodel of bathroom & kitchen | $15,000 |
| Apr 22, 2013 | Completed final sign-off May 2014 | 262 Bella Vista Wy | Umadhay Construction & Design | replacement of 2 front windows, comply with nov# 201393681 with fiber wood clad window, same opening 5'x6' & 5'x10' at the same opening, same style. living & dining rooms. u factor 0.40.Details
replacement of 2 front windows, comply with nov# 201393681 with fiber wood clad window, same opening 5'x6' & 5'x10' at the same opening, same style. living & dining rooms. u factor 0.40. | $500 |
| Jan 7, 2013 | Completed final sign-off Dec 2014 | 1508 Taraval St | Umadhay Construction & Design | construct(n)2x4 studs partitions w/gypsm brd sidings. install (n) suspended ceiling w/metal frames & 24"x24' ceiling brd. construct(n)unisex accessible toilet, install plmg connect to(e). install(n)elec wall outlets & lighting. install(n)heating/ventilating system for "cafe" area & unisex toilet.Details
construct(n)2x4 studs partitions w/gypsm brd sidings. install (n) suspended ceiling w/metal frames & 24"x24' ceiling brd. construct(n)unisex accessible toilet, install plmg connect to(e). install(n)elec wall outlets & lighting. install(n)heating/ventilating system for "cafe" area & unisex toilet. | $55,000 |
| Sep 4, 2012 | Completed final sign-off Nov 2012 | 859 46th Av | Umadhay Construction & Design | recommencement and completion of work approved under 200707197266Details
recommencement and completion of work approved under 200707197266 | $300 |
| Nov 1, 2011 | Completed final sign-off Jan 2012 | 727 41st Av | Umadhay Construction & Design | relocate lightwell stairs and door to north side of the rear bedroom. replace e door with window per plan.Details
relocate lightwell stairs and door to north side of the rear bedroom. replace e door with window per plan. | $1,000 |
| Jul 27, 2011 | Expired or cancelled expired Feb 2013 | 4014 Mission St | Umadhay Construction & Design | fire damaged inspection per correction notice dated 7/4/2011 by nancy curvinoDetails
fire damaged inspection per correction notice dated 7/4/2011 by nancy curvino | $5,000 |
| Jul 12, 2011 | Expired or cancelled expired Feb 2013 | 4014 Mission St | Umadhay Construction & Design | repair fire damagedwindow at front and rear. comply with notice of violation 201148889. remove fire damaged debris and fire damaged. no structural work and soft demo. legalize mechanical room, partial complaince only. stairs at rear to be done with additional permit.Details
repair fire damagedwindow at front and rear. comply with notice of violation 201148889. remove fire damaged debris and fire damaged. no structural work and soft demo. legalize mechanical room, partial complaince only. stairs at rear to be done with additional permit. | $2,000 |