Maurice Lombardo
- Listed as
- architect, authorized agent-others
- Firm
- Taylor Lombard Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Jul 2026
48 permits since 2000 (architect on 46 permits, authorized agent-others on 2 permits): 34 completed, 9 in progress, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Aug 2026 | 38 Hotaling Pl | Aidan Collins & Sons Inc | repair exploratory demo areas on front stucco exteriorDetails
repair exploratory demo areas on front stucco exterior | $4,000 |
| Jun 29, 2026 | In progress issued Aug 2026 | 38 Hotaling Pl | Aidan Collins & Sons Inc | revision 202409261671- structrual adds to orignal ti permit to include relocation of interior brick opening in basement, repair and replace (e) basement posts and beams, and add mechincal mezzanie soffitt on 1st floor.Details
revision 202409261671- structrual adds to orignal ti permit to include relocation of interior brick opening in basement, repair and replace (e) basement posts and beams, and add mechincal mezzanie soffitt on 1st floor. | $18,000 |
| May 13, 2026 | In progress issued May 2026 | 38 Hotaling Pl | Aidan Collins & Sons Inc | the proposed work is limited to the selective removal of areas of deteriorated stucco at the front facade for the evaluation and determination of furture facade. rehabilitation treatments, including evaluation of the originally expired brick.Details
the proposed work is limited to the selective removal of areas of deteriorated stucco at the front facade for the evaluation and determination of furture facade. rehabilitation treatments, including evaluation of the originally expired brick. | $6,500 |
| Apr 29, 2026 | In progress issued Apr 2026 | 38 Hotaling Pl | Aidan Collins & Sons Inc | platform slab extension of (e) elevator machine room, to be done in concreteDetails
platform slab extension of (e) elevator machine room, to be done in concrete | $5,500 |
| Dec 11, 2024 | Completed final sign-off Feb 2025 | 299 Edgewood Av | Eastwood Development Incorporated | revision to permit 201809059130 to include site walls to house pg&e utility meters, along south elevation of adu.Details
revision to permit 201809059130 to include site walls to house pg&e utility meters, along south elevation of adu. | |
| Nov 4, 2024 | In progress issued Mar 2025 | 38 Hotaling Pl | Aidan Collins & Sons Inc | 1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st flDetails
1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st fl | $122,000 |
| Sep 6, 2024 | In progress issued Nov 2025 | 1233 Van Ness Av | compliance with the abe program abe # 201912059302 install automatic door openerDetails
compliance with the abe program abe # 201912059302 install automatic door opener | $5,250 | |
| Sep 6, 2024 | In progress issued Nov 2025 | 1237 Van Ness Av | compliance with the abe program abe # 202306223577 install automatic door openerDetails
compliance with the abe program abe # 202306223577 install automatic door opener | $5,250 | |
| Sep 6, 2024 | In progress issued Nov 2025 | 1235 Van Ness Av | compliance with the abe program abe # 201912059303 install automatic door openerDetails
compliance with the abe program abe # 201912059303 install automatic door opener | $5,250 | |
| Jun 13, 2024 | Completed final sign-off Dec 2024 | 54 Landers St | Rohan Wallace & Aherne Inc | conversion of (e) storage space to accessory dwelling unit (adu) under state adu program including 1 bedroom, 1 bathroom, living room, kitchen/dining room, & laundry room. new openings for new windows. new electrical, lighting, & plumbing including new hot water heater, mech, & electrical meter.Details
conversion of (e) storage space to accessory dwelling unit (adu) under state adu program including 1 bedroom, 1 bathroom, living room, kitchen/dining room, & laundry room. new openings for new windows. new electrical, lighting, & plumbing including new hot water heater, mech, & electrical meter. | $100,000 |
| Jul 3, 2023 | Expired or cancelled cancelled Jan 2026 | 2198 Filbert St | Jesco | erect non-electric blade signDetails
erect non-electric blade sign | $2,000 |
| Jul 3, 2023 | Expired or cancelled cancelled Jan 2026 | 2198 Filbert St | Jesco | erect non-electric blade signDetails
erect non-electric blade sign | $5,000 |
| Mar 24, 2023 | Completed final sign-off Apr 2023 | 765 Market St | Baxter Construction | rev to pa# 2021-0602-1430: reduce and remodel (e) master bath, remove (e) guest bathroom to expand (e) guest bedroom reconfigure (e) closet no change in accessibility featuresDetails
rev to pa# 2021-0602-1430: reduce and remodel (e) master bath, remove (e) guest bathroom to expand (e) guest bedroom reconfigure (e) closet no change in accessibility features | $10,000 |
| Apr 29, 2022 | Completed final sign-off Feb 2025 | 299 Edgewood Av | Eastwood Development Incorporated | garage remodel to create open space. new perimeter foundation and housing of mechanical room of unit above. changing 3 garage doors to 2 garage doors.Details
garage remodel to create open space. new perimeter foundation and housing of mechanical room of unit above. changing 3 garage doors to 2 garage doors. | $150,000 |
| Nov 16, 2021 | Expired or cancelled cancelled Jul 2026 | 2652 California St | horizontal & vertical addition for (n) 2nd dwelling unit. remodel (e) unit w/ (n) stair to (n) deck at (e) roof. (n) passenger elevator. (n) concrete sidewalk. front facade improvements. (n) mep systems. (n) rear yard landscaping, retaining walls & paving.Details
horizontal & vertical addition for (n) 2nd dwelling unit. remodel (e) unit w/ (n) stair to (n) deck at (e) roof. (n) passenger elevator. (n) concrete sidewalk. front facade improvements. (n) mep systems. (n) rear yard landscaping, retaining walls & paving. | $2,835,800 | |
| Mar 13, 2019 | Completed final sign-off Nov 2019 | 129 Julian Av | revision to 201712136310 seismic retrofit program. relocate shear walls due to obstruction & replace mf with sw.Details
revision to 201712136310 seismic retrofit program. relocate shear walls due to obstruction & replace mf with sw. | $80,000 | |
| Dec 11, 2018 | Completed final sign-off Jan 2019 | 631 Taraval St | 8 Success Construction | revision to pa #201802211848. existing issued permit need to change occupancy class form e to i4. to remove interior door, turn existing door frome (push out), and add hardware.Details
revision to pa #201802211848. existing issued permit need to change occupancy class form e to i4. to remove interior door, turn existing door frome (push out), and add hardware. | |
| Sep 12, 2018 | Completed final sign-off Nov 2020 | 2815 Polk St | Design Line Construction | revision to pa 2014-0709-0811 s4 - reroute mep room (b103) hot water heater combusstion air pipe from 1st fl covered entry to garage. b101 modification to combined air fan. coordinate horizontl chase extents w/water heater exhaust @ b101. (n) outside air louver at rear buildingDetails
revision to pa 2014-0709-0811 s4 - reroute mep room (b103) hot water heater combusstion air pipe from 1st fl covered entry to garage. b101 modification to combined air fan. coordinate horizontl chase extents w/water heater exhaust @ b101. (n) outside air louver at rear building | |
| Sep 10, 2018 | Completed final sign-off Nov 2020 | 2815 Polk St | Design Line Construction | revision to 2014-0709-0811 s4; addition o f air conditioning to 3rd floor dwelling unit 3Details
revision to 2014-0709-0811 s4; addition o f air conditioning to 3rd floor dwelling unit 3 | |
| Sep 6, 2018 | Completed final sign-off Nov 2020 | 2815 Polk St | Design Line Construction | revision to 201407090811 s4 revised ul listing ref for 1st flr fire rated assembly. no structural changes to floor assemblyDetails
revision to 201407090811 s4 revised ul listing ref for 1st flr fire rated assembly. no structural changes to floor assembly | |
| Sep 5, 2018 | Expired or cancelled expired Feb 2025 | 299 Edgewood Av | adu above (e) 3-car garage (3 stories total), (2) bedroom. ord #162-16Details
adu above (e) 3-car garage (3 stories total), (2) bedroom. ord #162-16 | $230,000 | |
| Jul 5, 2018 | Completed final sign-off Mar 2019 | 531 Jackson St | unit #3; apartment remodel to include bathroom and kitchen///shall comply with sffc 1103.7.6.1// building had a new fire alarm installed recentlyDetails
unit #3; apartment remodel to include bathroom and kitchen///shall comply with sffc 1103.7.6.1// building had a new fire alarm installed recently | $50,000 | |
| Feb 21, 2018 | Completed final sign-off Jun 2018 | 129 Julian Av | unit #4: kitchen remodel: new cabinets, new tile, new appliances, add dishwasher, basic layout remains the same. bathroom remodel: new bathtub, new toilet, new sink and new tile.Details
unit #4: kitchen remodel: new cabinets, new tile, new appliances, add dishwasher, basic layout remains the same. bathroom remodel: new bathtub, new toilet, new sink and new tile. | $32,000 | |
| Feb 21, 2018 | Completed final sign-off Sep 2018 | 631 Taraval St | 8 Success Construction | ti of (e) ground fl commercial space in (e) 3-story building into day care. work includes partial demolition of (e) interior non-structural walls & interior finishes and the construction of new interior walls & interior finishes.Details
ti of (e) ground fl commercial space in (e) 3-story building into day care. work includes partial demolition of (e) interior non-structural walls & interior finishes and the construction of new interior walls & interior finishes. | $50,000 |
| Jan 30, 2018 | Completed final sign-off Jun 2018 | 47 06th St | Archeon Construction | revision to pa 2016-0728-3624 relocations of plumbing fixtures and equipments in cafe and restroom. construction of full height wall between cafe and clean up space and inclusion of rcp/lighting plan and mep drawings. change of use under pa 2016-0909-7253. change to exterior facade under paDetails
revision to pa 2016-0728-3624 relocations of plumbing fixtures and equipments in cafe and restroom. construction of full height wall between cafe and clean up space and inclusion of rcp/lighting plan and mep drawings. change of use under pa 2016-0909-7253. change to exterior facade under pa | $5,000 |
| Jan 8, 2018 | In progress issued Jul 2026 | 2637 Union St | increase entry lvl height by raising ground lvl wall by 1'-0"; convert entry lvl suite to 2nd dwelling unit; replace (e) window @ entry lvl w/ roll up door to accomodate off street parking; horizontal addition in the rear yard; setback vertical addition above (e) 2nd lvl.Details
increase entry lvl height by raising ground lvl wall by 1'-0"; convert entry lvl suite to 2nd dwelling unit; replace (e) window @ entry lvl w/ roll up door to accomodate off street parking; horizontal addition in the rear yard; setback vertical addition above (e) 2nd lvl. | $400,000 | |
| Dec 28, 2017 | Completed final sign-off Apr 2019 | 1630 Stockton St | barrier removal. demo of (e) restroom & install new code complyinh restroom including lighting fixtures in (e) entry vestibuleDetails
barrier removal. demo of (e) restroom & install new code complyinh restroom including lighting fixtures in (e) entry vestibule | $30,000 | |
| Dec 13, 2017 | Completed final sign-off Nov 2019 | 129 Julian Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4; to comply with nov 201719262Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4; to comply with nov 201719262 | $50,000 | |
| Aug 25, 2017 | Completed final sign-off Jul 2020 | 129 Julian Av | legalize unit per ordinance 43-14 ground floor studio.Details
legalize unit per ordinance 43-14 ground floor studio. | $8,250 | |
| May 23, 2017 | Expired or cancelled cancelled May 2019 | 299 Edgewood Av | remodel (e) attic f main house, raise floor + ceiling height & addition of new roof with one additional bath, bedroom,closet, sitting room, 2 new balconies.Details
remodel (e) attic f main house, raise floor + ceiling height & addition of new roof with one additional bath, bedroom,closet, sitting room, 2 new balconies. | $300,000 | |
| Mar 6, 2017 | Completed final sign-off Apr 2017 | 2712 Broadway | Kearney & Obanion Inc. | install new front yard fence and gate with clear glass panels and painted metal rails above existing retaining wall. maximum total height of 6 feet above grade. n/a maher ordinanceDetails
install new front yard fence and gate with clear glass panels and painted metal rails above existing retaining wall. maximum total height of 6 feet above grade. n/a maher ordinance | $10,000 |
| Sep 9, 2016 | Completed final sign-off Jun 2018 | 47 06th St | change of use from retail to cafe. no work on this permit. ** maher: n/a **. reference permit # 2016-0728-3624 for tenant improvement workDetails
change of use from retail to cafe. no work on this permit. ** maher: n/a **. reference permit # 2016-0728-3624 for tenant improvement work | ||
| Mar 2, 2016 | Completed final sign-off Feb 2017 | 2712 Broadway | Kearney & Obanion Inc. | revision to 201512225781. move and enlarge window on top floor, north east corner maher not req: add glass screen at 3/f terrace.Details
revision to 201512225781. move and enlarge window on top floor, north east corner maher not req: add glass screen at 3/f terrace. | $1,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2017 | 2712 Broadway | Kearney & Obanion Inc. | submittal of as-built conditions to existing pa# 201102150303 (new bldg) & pa#201511193084. submittal is for interior as built conditions. includes pa#201505045294 for clarification of story count. n/a ordinance #155-13Details
submittal of as-built conditions to existing pa# 201102150303 (new bldg) & pa#201511193084. submittal is for interior as built conditions. includes pa#201505045294 for clarification of story count. n/a ordinance #155-13 | |
| Oct 23, 2015 | Completed final sign-off Mar 2016 | 531 Jackson St | unit #4 - remodel bathroom & kitchen, relocate bathroom & kitchen location. remove partition wall between bedroom & living room. n/a maher ordinanceDetails
unit #4 - remodel bathroom & kitchen, relocate bathroom & kitchen location. remove partition wall between bedroom & living room. n/a maher ordinance | $30,000 | |
| Jul 9, 2014 | Completed final sign-off Nov 2020 | 2815 Polk St | Design Line Construction | demolish 1-story single family residence.Details
demolish 1-story single family residence. | $15,000 |
| Jul 9, 2014 | Completed final sign-off Nov 2020 | 2815 Polk St | Partners Contracting Inc., Design Line Construction, Nuport Construction Inc | to erect 3 stories, 1 basement, type iii-a, 3 units residential building.Details
to erect 3 stories, 1 basement, type iii-a, 3 units residential building. | $1,500,000 |
| Oct 23, 2013 | Completed final sign-off Feb 2014 | 794 Ashbury St | Ron Davison Construction | kitchen remodel interior wall removal & alteration, adding new shower to existing 1/2 bathroom. new energy efficient hot water heater.Details
kitchen remodel interior wall removal & alteration, adding new shower to existing 1/2 bathroom. new energy efficient hot water heater. | $95,000 |
| Mar 20, 2013 | Completed final sign-off Sep 2013 | 40 Hotaling Pl | Bbc Construction Inc. | at second floor provide two-acessible toilet rooms and kitchenette with sink, dishwasher and 2-refrigeratorsDetails
at second floor provide two-acessible toilet rooms and kitchenette with sink, dishwasher and 2-refrigerators | $50,000 |
| Jul 28, 2011 | Completed final sign-off Jun 2012 | 2830 Pacific Av | Koala Development Corporation | to replace (e) wood stairs & deck with new concrete stairs, new concrete deck on slab, new wood deck & 1 hour rated parapet wall along length of new wood deck.Details
to replace (e) wood stairs & deck with new concrete stairs, new concrete deck on slab, new wood deck & 1 hour rated parapet wall along length of new wood deck. | $40,000 |
| Feb 15, 2011 | Completed final sign-off Feb 2017 | 2712 Broadway | Kearney & Obanion Inc., Serra Homes | erect 3 stories of one dwelling unit. type 5.Details
erect 3 stories of one dwelling unit. type 5. | $1,650,000 |
| Feb 14, 2011 | Completed final sign-off May 2014 | 2712 Broadway | Kearney & Obanion Inc., Serra Homes | demolish 3 stories, type 5, single family dwelling bldg.Details
demolish 3 stories, type 5, single family dwelling bldg. | $20,000 |
| Nov 3, 2010 | Completed final sign-off Jul 2014 | 2040 Jackson St | single family residence remodel. add additional 1702 sq. ft. of new conditioned space includes 3 story rear addition. refurblish 6354 sq. ft. of (e) conditioned & unconditioned space. create roof deck & stair penthouse.Details
single family residence remodel. add additional 1702 sq. ft. of new conditioned space includes 3 story rear addition. refurblish 6354 sq. ft. of (e) conditioned & unconditioned space. create roof deck & stair penthouse. | $680,000 | |
| Oct 14, 2010 | Completed final sign-off Jun 2012 | 2830 Pacific Av | Koala Development Corporation | general remodel of interior spaces, new bath at 2nd level, new window at basement, remodel extg penthouse.Details
general remodel of interior spaces, new bath at 2nd level, new window at basement, remodel extg penthouse. | $200,000 |
| May 11, 2009 | Completed final sign-off Sep 2009 | 559 Clay St | Mayta & Jensen | provide a 2nd required accessible toilet room at the 1st fl. new restroom shall utilize existing plumbing stub outs, exhaust. ducting and fire sprinkler installation. electrical, mechanical, life safety work to be done under seperate permit.Details
provide a 2nd required accessible toilet room at the 1st fl. new restroom shall utilize existing plumbing stub outs, exhaust. ducting and fire sprinkler installation. electrical, mechanical, life safety work to be done under seperate permit. | $13,500 |
| Sep 5, 2008 | Completed final sign-off Apr 2009 | 624 Vallejo St | Nibbi Bros Construction | to install 6 foot high decorative wrought iron fence & pair of 4 foot wide gates.Details
to install 6 foot high decorative wrought iron fence & pair of 4 foot wide gates. | $15,000 |
| Apr 11, 2007 | Completed final sign-off Oct 2007 | 624 Vallejo St | interior non-structural demolition of church gymnasium.Details
interior non-structural demolition of church gymnasium. | $26,000 | |
| May 22, 2006 | Completed final sign-off Dec 2008 | 624 Vallejo St | Nibbi Bros Construction | remodel church gym for new chapel and gift shop. new accessible restrooms and remodel e facade and entry (site permit)Details
remodel church gym for new chapel and gift shop. new accessible restrooms and remodel e facade and entry (site permit) | $350,000 |