Bill Daley
- License
- S3526
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3526 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Hohbachi Lewin Inc.
- Based in
- Palo Alto
- On San Francisco permits
- Jul 2007 to Dec 2017
7 permits since 2000 (engineer on 7 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Anderson-Niswander (3), Aka Construction Company, Brendan Waters Construction Inc, Scott Anderson Gen.Engr.Contr(Sage)
- Architects
- Maurice Lombardo
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2017 | Completed final sign-off Nov 2019 | 129 Julian Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4; to comply with nov 201719262Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4; to comply with nov 201719262 | $50,000 | |
| Jan 8, 2015 | Completed final sign-off Jul 2020 | 1415 Leavenworth St | Scott Anderson Gen.Engr.Contr(Sage) | voluntary strengthening work to improve structural resistance. all work to 2013 cbc. haunches at (e) steel moment frame, attachment of steel moment frame to (e) concrete wall; maher n/aDetails
voluntary strengthening work to improve structural resistance. all work to 2013 cbc. haunches at (e) steel moment frame, attachment of steel moment frame to (e) concrete wall; maher n/a | $19,000 |
| May 28, 2014 | Completed final sign-off Oct 2014 | 577 Arkansas St | Brendan Waters Construction Inc | seismic upgrade, voluntary. add shear walls on existing foundation. remove post in basement and under kitchen.Details
seismic upgrade, voluntary. add shear walls on existing foundation. remove post in basement and under kitchen. | $10,000 |
| Jun 13, 2012 | Completed final sign-off Jul 2012 | 66 Terrace Dr | Anderson-Niswander | hardy frame panels adjacent to garage doors & foundation strengthening footing.Details
hardy frame panels adjacent to garage doors & foundation strengthening footing. | $8,700 |
| Feb 21, 2008 | Completed final sign-off Aug 2008 | 2722 Gough St | Aka Construction Company | instll new ground floor shear walls, new grade beams. install anchor bolts.Details
instll new ground floor shear walls, new grade beams. install anchor bolts. | $30,000 |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 611 Guerrero St | Anderson-Niswander | this is a revision to pa# 2007/07/16/6887. shorten footing at the north end and extend it at the south end. move footing at least 2ft to the east.Details
this is a revision to pa# 2007/07/16/6887. shorten footing at the north end and extend it at the south end. move footing at least 2ft to the east. | |
| Jul 16, 2007 | Expired or cancelled expired Mar 2009 | 611 Guerrero St | Anderson-Niswander | voluntary seismic improvement at ground floor.Details
voluntary seismic improvement at ground floor. | $67,450 |