Scott Anderson Gen.Engr.Contr(Sage)
- Based in
- Redwood City
- On San Francisco permits
- Nov 2014 to Dec 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2016 | Completed final sign-off Aug 2017 | 58 Lake Forest Ct | deck material & structural revision to permit no 201510301206.Details
deck material & structural revision to permit no 201510301206. | |
| Sep 15, 2016 | Expired or cancelled cancelled Feb 2019 | 611 Guerrero St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $45,000 |
| Aug 22, 2016 | Expired or cancelled cancelled Aug 2017 | 58 Lake Forest Ct | change deck structural members for presssure treated douglas fir to ipe. struct calcs by santos & urrutia job #8925. revision to bpa#201510301206Details
change deck structural members for presssure treated douglas fir to ipe. struct calcs by santos & urrutia job #8925. revision to bpa#201510301206 | |
| Jan 8, 2015 | Completed final sign-off Jul 2020 | 1415 Leavenworth St | voluntary strengthening work to improve structural resistance. all work to 2013 cbc. haunches at (e) steel moment frame, attachment of steel moment frame to (e) concrete wall; maher n/aDetails
voluntary strengthening work to improve structural resistance. all work to 2013 cbc. haunches at (e) steel moment frame, attachment of steel moment frame to (e) concrete wall; maher n/a | $19,000 |
| Nov 7, 2014 | Completed final sign-off Sep 2024 | 1800 20th Av | seismic streghening only. provide plywood sheathing to existing walls at the 1st floor onlyDetails
seismic streghening only. provide plywood sheathing to existing walls at the 1st floor only | $50,000 |