Anderson-Niswander
- Based in
- La Honda
- On San Francisco permits
- May 2003 to Jun 2012
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2012 | Completed final sign-off Jul 2012 | 66 Terrace Dr | hardy frame panels adjacent to garage doors & foundation strengthening footing.Details
hardy frame panels adjacent to garage doors & foundation strengthening footing. | $8,700 |
| Jun 14, 2011 | Completed final sign-off Aug 2011 | 664 02nd Av | voluntary structural improvement in basement and garage area. shear walls and non vertical loaded cantilever column. special bolting and lateral hardware. new concrete foundations will be added at cantilevered column.Details
voluntary structural improvement in basement and garage area. shear walls and non vertical loaded cantilever column. special bolting and lateral hardware. new concrete foundations will be added at cantilevered column. | $10,000 |
| Dec 28, 2010 | Completed final sign-off Jan 2011 | 3528 23rd St | voluntary prescriptive seismic upgrade (improvement) seismic strengthening plan. shearwalls at first level, including shear clips, sheathing sill bolts, holdowns and grade beams.Details
voluntary prescriptive seismic upgrade (improvement) seismic strengthening plan. shearwalls at first level, including shear clips, sheathing sill bolts, holdowns and grade beams. | $25,600 |
| Apr 30, 2010 | Completed final sign-off Jun 2010 | 830 41st Av | voluntary structural strengthening in the basement/ garage area with storage. add shear wall. a non vertical/loaded cantilever column. bolting and seismic hazard.Details
voluntary structural strengthening in the basement/ garage area with storage. add shear wall. a non vertical/loaded cantilever column. bolting and seismic hazard. | $22,000 |
| Mar 18, 2010 | Completed final sign-off Sep 2010 | 10 Dearborn St | voluntary structural strengthening (seismic upgrade) @ garage level.Details
voluntary structural strengthening (seismic upgrade) @ garage level. | $90,000 |
| Jan 6, 2010 | Completed final sign-off Feb 2010 | 1738 Great Hy | voluntary seismic retrofit improvements (garage area), add sill anchors, chips, shear panels (plywood), no adding roomsDetails
voluntary seismic retrofit improvements (garage area), add sill anchors, chips, shear panels (plywood), no adding rooms | $44,735 |
| Sep 29, 2009 | Completed final sign-off Nov 2009 | 250 Granville Wy | voluntary seismic strengthening, sill anchors, shear clips, shear plywood panels-1/2-5 ply (ground floor).Details
voluntary seismic strengthening, sill anchors, shear clips, shear plywood panels-1/2-5 ply (ground floor). | $15,500 |
| Apr 14, 2009 | Completed final sign-off Jul 2016 | 611 Guerrero St | renew pa# 2007/07/16/6887 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/16/6887 to obtain final inspection. all work has been completed. | |
| Oct 3, 2007 | Completed final sign-off Nov 2007 | 2375 Francisco St | revision to app.# 200708291232/revise south shear wall @ garage to provide one 9' wall,revise attachment details @ north and south shear walls/ delete from scope of work hold downs,posts and anchor bolts at extreme south wall.Details
revision to app.# 200708291232/revise south shear wall @ garage to provide one 9' wall,revise attachment details @ north and south shear walls/ delete from scope of work hold downs,posts and anchor bolts at extreme south wall. | |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 611 Guerrero St | this is a revision to pa# 2007/07/16/6887. shorten footing at the north end and extend it at the south end. move footing at least 2ft to the east.Details
this is a revision to pa# 2007/07/16/6887. shorten footing at the north end and extend it at the south end. move footing at least 2ft to the east. | |
| Aug 29, 2007 | Completed final sign-off Nov 2007 | 2375 Francisco St | voluntary seismic strengthening at 1st floor onlyDetails
voluntary seismic strengthening at 1st floor only | $35,000 |
| Jul 16, 2007 | Expired or cancelled expired Mar 2009 | 611 Guerrero St | voluntary seismic improvement at ground floor.Details
voluntary seismic improvement at ground floor. | $67,450 |
| May 6, 2003 | Completed final sign-off Jul 2011 | 1927 Ellis St | strengthen under s tory/garage area w/ shear walls, buttress walls, spec. bolting, & seismic hardwarDetails
strengthen under s tory/garage area w/ shear walls, buttress walls, spec. bolting, & seismic hardwar | $24,500 |