Block 2976, lot 022
250 Granville Way
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 2,152 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2015 | Expired or cancelled cancelled Mar 2016 | 250 Granville Wy | Okell's Fireplace | removal of (e) terra cotta chimney and replace with new metal clas a chiimney system. this is a repair not reconstructionDetails
removal of (e) terra cotta chimney and replace with new metal clas a chiimney system. this is a repair not reconstruction | $6,000 |
| Apr 24, 2015 | Completed final sign-off May 2015 | 250 Granville Wy | Lingruen Associates | to perform repairs as per lingruen associates termite report #66486- item 5bDetails
to perform repairs as per lingruen associates termite report #66486- item 5b | $4,800 |
| Apr 15, 2015 | Never finaled issued Apr 2015, no final | 250 Granville Wy | Asap Roofing | reroofingDetails
reroofing | $6,000 |
| Sep 29, 2009 | Completed final sign-off Nov 2009 | 250 Granville Wy | Anderson-Niswander | voluntary seismic strengthening, sill anchors, shear clips, shear plywood panels-1/2-5 ply (ground floor).Details
voluntary seismic strengthening, sill anchors, shear clips, shear plywood panels-1/2-5 ply (ground floor). | $15,500 |
| Feb 28, 2005 | Never finaled issued Feb 2005, no final | 250 Granville Wy | streetspaceDetails
streetspace | ||
| Jan 5, 2005 | Completed final sign-off Feb 2005 | 250 Granville Wy | renew permit 200205025598Details
renew permit 200205025598 | $1,500 | |
| Jan 5, 2005 | Completed final sign-off Feb 2005 | 250 Granville Wy | replace extg window in front 8 total to match extg & replace stucco rough 800 sqft at frontDetails
replace extg window in front 8 total to match extg & replace stucco rough 800 sqft at front | $55,000 | |
| Jan 16, 2004 | Completed final sign-off Mar 2005 | 250 Granville Wy | laundry room added. structural beam in basement added. increase construction cost per inspector requDetails
laundry room added. structural beam in basement added. increase construction cost per inspector requ | $174,000 | |
| May 2, 2002 | Never finaled issued Sep 2003, no final | 250 Granville Wy | 2nd floor partial addition over (e) , replace (e) ground level deck & add new grndflr level deckDetails
2nd floor partial addition over (e) , replace (e) ground level deck & add new grndflr level deck | $46,000 | |
| Dec 19, 2001 | Completed final sign-off May 2002 | 250 Granville Wy | Moroso Construction Inc | remove (e) finishes, no structural changes, replace new finishes, bathroom remodel, 1 onlyDetails
remove (e) finishes, no structural changes, replace new finishes, bathroom remodel, 1 only | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Anderson-Niswander, Asap Roofing, Lingruen Associates, Moroso Construction Inc, Okell's Fireplace
- Architects
- Monte Stott
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.