Tuong Xuan Tran
- Listed as
- architect, engineer
- Firm
- Tranvu Llc
- Based in
- San Jose
- On San Francisco permits
- Jan 2008 to Jul 2026
29 permits since 2000 (engineer on 24 permits, architect on 5 permits): 19 completed, 3 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 676 Broadway | Bc United Construction Inc | revision to bpa: 202212168554 - replacing, previous a1, sheet bpa:202509024416. relocate previously approved skylight (not yet framed) to a centered location within the same bedroom. revise 2 interuir doors to one double french door and relocate hallway door.Details
revision to bpa: 202212168554 - replacing, previous a1, sheet bpa:202509024416. relocate previously approved skylight (not yet framed) to a centered location within the same bedroom. revise 2 interuir doors to one double french door and relocate hallway door. | |
| Jun 11, 2026 | Completed final sign-off Jun 2026 | 869 Washington St | Sincere Construction Company Inc | revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island.Details
revision to permit 202305167853. 2/f: new bath layout revised. add door to lightwell. add kitchen island. | $100 |
| Sep 2, 2025 | In progress issued Sep 2025 | 676 Broadway | Premier Built Construction Inc | modified layout by adding a non-structural kitchen partition wall, relocating a non-structrual bathroom wall and door and adding a construction exterior annd interior door. no plumbing or electrical changes. revision to pa#: 201602098720 and 202212168554; work on residential.Details
modified layout by adding a non-structural kitchen partition wall, relocating a non-structrual bathroom wall and door and adding a construction exterior annd interior door. no plumbing or electrical changes. revision to pa#: 201602098720 and 202212168554; work on residential. | $2,000 |
| Nov 15, 2024 | Completed final sign-off Feb 2025 | 1393 32nd Av | Wing Construction Co. | fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floorDetails
fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floor | $40,000 |
| Jul 24, 2024 | Completed final sign-off Feb 2025 | 29 Patterson St | to comply nov # 202425832, 202425963 & 202425969 demo an unpermitted partition walls in warehouse.plumbing & electrical under permitDetails
to comply nov # 202425832, 202425963 & 202425969 demo an unpermitted partition walls in warehouse.plumbing & electrical under permit | $20,000 | |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 1470 32nd Av | Atlas General Construction | demo existing 2 windows next to each other at the rear yar and replace with 6' width & 6'-8' height french door at same location. install (n) 4"-5" landing for french doorsDetails
demo existing 2 windows next to each other at the rear yar and replace with 6' width & 6'-8' height french door at same location. install (n) 4"-5" landing for french doors | $8,000 |
| Jun 7, 2023 | Completed final sign-off Mar 2024 | 2631 Leavenworth St | Studio Crit Construction Inc | puting new cabinets countertop, upgrade electrical outlets , add toilet in the bathroom. no structural walls to be removed or adding. add new bath at each flatDetails
puting new cabinets countertop, upgrade electrical outlets , add toilet in the bathroom. no structural walls to be removed or adding. add new bath at each flat | $70,000 |
| May 16, 2023 | Completed final sign-off Jun 2026 | 867 Washington St | Sincere Construction Company Inc | to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sfDetails
to comply w/nov# 202304966 repair basement retaining wall & repair exterior wall on very top of bldg. 2nd fl remodel - add new bathroom, kitchen remodel, remove non-load bearing wall at kitchen and living rm, remove water heater and replace & relocate with tankless water heater, and roof repair 16sf | $40,000 |
| Jan 19, 2023 | In progress issued Jun 2025 | 908 Paris St | C K Construction, Wing Construction Co. | change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office.Details
change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office. | $60,000 |
| May 27, 2022 | Completed final sign-off Apr 2025 | 149 Arleta Av | legalize ground flr unit w/ one bathroom and kitchen space at 620 sf. per ord# 43-14Details
legalize ground flr unit w/ one bathroom and kitchen space at 620 sf. per ord# 43-14 | $35,000 | |
| Apr 14, 2022 | Completed final sign-off May 2022 | 721 Ulloa St | Evergreen Construction Company | add bathroom in garage at basement. change door in back from regular door and windows to three sections glass stacking patio door at 1/f, not visible from street, replacement of door.Details
add bathroom in garage at basement. change door in back from regular door and windows to three sections glass stacking patio door at 1/f, not visible from street, replacement of door. | $10,000 |
| Apr 8, 2022 | Never finaled filed Apr 2022, never issued | 258 20th Av | legalize ground floor to adu, one bedroom, one bathroom and kitchen space at 509 sf, city ordinance 43-14Details
legalize ground floor to adu, one bedroom, one bathroom and kitchen space at 509 sf, city ordinance 43-14 | $35,000 | |
| Oct 14, 2021 | Never finaled filed Oct 2021, never issued | 149 Jules Av | demolish a 1 story single family dwelling.Details
demolish a 1 story single family dwelling. | $30,000 | |
| Jul 10, 2018 | Expired or cancelled cancelled Jan 2026 | 2200 Keith St | extending (e) mezzanine at unit 1 to all floor area (office). build a new ada bathroom on new unit. new elevator for adaDetails
extending (e) mezzanine at unit 1 to all floor area (office). build a new ada bathroom on new unit. new elevator for ada | $75,000 | |
| Jun 12, 2018 | Expired or cancelled cancelled Jan 2026 | 4500 Mission St | ti - remodel existing restaurant space into sushi restaurant. new ada restroom, 24 seatings + 6 bar seatsDetails
ti - remodel existing restaurant space into sushi restaurant. new ada restroom, 24 seatings + 6 bar seats | $80,000 | |
| Nov 14, 2016 | Completed final sign-off Mar 2018 | 426 17th Av | provide as built plans for revision on bath at basement lvel and bath at top level. related to 201401136073. add access door to roofDetails
provide as built plans for revision on bath at basement lvel and bath at top level. related to 201401136073. add access door to roof | ||
| Jul 14, 2016 | Completed final sign-off May 2017 | 1801 15th Av | Warren Manh Young | revision to pa #201606028952 - replace /rebuild new retaining wall like for like.Details
revision to pa #201606028952 - replace /rebuild new retaining wall like for like. | $3,850 |
| Dec 11, 2015 | Completed final sign-off Feb 2018 | 3327 Irving St | Hong Bo Hardware Supply | kitchen, bath remodel. remove wall between kitchen, living rm, upgrade e elec panel to 125 amp, change furnace, changte 2 windows facing street, replace with all-wood windows in kind retaining divided light configurations. legalize living room, family rm and full bath on 1/fDetails
kitchen, bath remodel. remove wall between kitchen, living rm, upgrade e elec panel to 125 amp, change furnace, changte 2 windows facing street, replace with all-wood windows in kind retaining divided light configurations. legalize living room, family rm and full bath on 1/f | $94,000 |
| May 12, 2015 | Expired or cancelled suspend Feb 2016 | 284 Roosevelt Wy | Cross Dial Technologies & Constr. | new permits - no planning hold. this permit was superseded by 201802050353 and 201904117757. to comply with nov# 201536821 by constructing retaining in 3 sections. ref. to building pa# 201201303143's1'Details
new permits - no planning hold. this permit was superseded by 201802050353 and 201904117757. to comply with nov# 201536821 by constructing retaining in 3 sections. ref. to building pa# 201201303143's1' | $5 |
| Jul 3, 2014 | Completed final sign-off May 2015 | 527 Oak Park Dr | Kendu Construction | convert 144 sf @ garage to living area, add 177 sf of living area 1st flr rear, remodel interior stair, remodel 1st and 2nd floor 1800 sf, 2 bath & kit remodel, add 1 bathrm in 1st flr, add 6 ea sky light, & reroof,living dining & kit areaDetails
convert 144 sf @ garage to living area, add 177 sf of living area 1st flr rear, remodel interior stair, remodel 1st and 2nd floor 1800 sf, 2 bath & kit remodel, add 1 bathrm in 1st flr, add 6 ea sky light, & reroof,living dining & kit area | $120,000 |
| Mar 17, 2014 | Never finaled issued Jan 2016, no final | 138 San Felipe Av | C B W Construction Inc. | rear addition area including: 1st floor hallway, 2nd floor office & 3rd floor master bathroom. compliance with maher ordinace no. 155-13 not required.Details
rear addition area including: 1st floor hallway, 2nd floor office & 3rd floor master bathroom. compliance with maher ordinace no. 155-13 not required. | $60,000 |
| Jan 13, 2014 | Completed final sign-off Mar 2018 | 426 17th Av | Full Gamut Design & Build, Chc Builders Inc | remodel of existing dwellings; legalization of basement area into additional living space of existing unit. all windows at streetside to be replace with wood casement windows. required by planning: add roof deck for open space for upper unit.Details
remodel of existing dwellings; legalization of basement area into additional living space of existing unit. all windows at streetside to be replace with wood casement windows. required by planning: add roof deck for open space for upper unit. | $120,000 |
| Jan 13, 2014 | Expired or cancelled expired Oct 2016 | 115 14th Av | revision of permit #201304305788, 2013.0315.2299, 2013.0329.3379, 2013.0628.0767; remove interior wall at dining room; relocate master bath and closetDetails
revision of permit #201304305788, 2013.0315.2299, 2013.0329.3379, 2013.0628.0767; remove interior wall at dining room; relocate master bath and closet | ||
| Nov 30, 2012 | Completed final sign-off Aug 2013 | 178 Townsend St | Wong Ho Yu/Ho's Electric Co | revision to appl #2012.0723.5461 (page a.2-1b) - siting relocation, no change of occupancy.Details
revision to appl #2012.0723.5461 (page a.2-1b) - siting relocation, no change of occupancy. | |
| Jul 23, 2012 | Completed final sign-off Aug 2013 | 178 Townsend St | Wong Ho Yu/Ho's Electric Co | new restaurant at ground floor. add mezzanine. underground plumbing, mechanical, and electrical. ref pa# 2011/04/08/3769. fire sprinkler under seperateDetails
new restaurant at ground floor. add mezzanine. underground plumbing, mechanical, and electrical. ref pa# 2011/04/08/3769. fire sprinkler under seperate | $200,000 |
| Jun 12, 2012 | Completed final sign-off Jun 2012 | 211 Industrial St | build partition walls to hang cabinets for displayingDetails
build partition walls to hang cabinets for displaying | $6,000 | |
| Mar 12, 2012 | Completed final sign-off Jan 2013 | 325 Kearny St | add a shower & relocate laundry room on 2nd floor. relocate electrical panel. add 2 showers at 3rd floor. all mechanical, plumbing & elec fixtures will remain except at new shower rooms.Details
add a shower & relocate laundry room on 2nd floor. relocate electrical panel. add 2 showers at 3rd floor. all mechanical, plumbing & elec fixtures will remain except at new shower rooms. | $10,000 | |
| Aug 18, 2010 | Completed final sign-off Feb 2011 | 796 Junipero Serra Bl | interior remodel. garage conversion, new rear decks, reconfigure e breakfast area. convert existing bathroom and closet at main level into 2 bathrooms. convert rear half of garage into new suite with full bath. kitchen renovation. new lighting.Details
interior remodel. garage conversion, new rear decks, reconfigure e breakfast area. convert existing bathroom and closet at main level into 2 bathrooms. convert rear half of garage into new suite with full bath. kitchen renovation. new lighting. | $48,000 | |
| Jan 3, 2008 | Completed final sign-off May 2008 | 4015 24th St | Kendu Construction | remove sheetrock, install insulation, remodel upper bathroom (bathtub to shower). relocate one wall, install new receptacles. no structural work.Details
remove sheetrock, install insulation, remodel upper bathroom (bathtub to shower). relocate one wall, install new receptacles. no structural work. | $12,000 |