Permit GraphShortlistSan Francisco building permits since 2000

Todd Kemen

License
S5409
Look the license up with the state
Listed as
engineer
Firm
Response Structural Engineers
On San Francisco permits
Feb 2018 to Jul 2025

5 permits since 2000 (engineer on 5 permits): 2 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 3, 2025Completed
final sign-off Dec 2025
1632 Hayes StCameron Builders Sfwindow modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade.
Details
Permit
202507030134
Status
complete
Filed
Jul 3, 2025
Permit issued
Jul 8, 2025
Final sign-off
Dec 5, 2025
Declared cost
$2,125
Address
1632 Hayes St

window modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade.

Open the permit page

$2,125
Nov 15, 2024In progress
issued Jan 2025
44 Glover Stinstall spring-loaded acoustical wood slat ceiling in the (e) media room on the lower level. area of proposed work is 349 sf & includes electrical/lighting
Details
Permit
202411155116
Status
issued
Filed
Nov 15, 2024
Permit issued
Jan 8, 2025
Declared cost
$10,000
Address
44 Glover St

install spring-loaded acoustical wood slat ceiling in the (e) media room on the lower level. area of proposed work is 349 sf & includes electrical/lighting

Open the permit page

$10,000
Sep 22, 2021Never finaled
issued Sep 2021, no final
340 Post StCarson Services Corporatin /Carson Mechdisconnect/removal of (e) 12.5 ton pk6 unit (rtu-2), installation of new 12.5 ton pk6 unit w/economizer disconnect, fuses, smoke detector, plumbing, transition duct work
Details
Permit
202109228948
Status
issued
Filed
Sep 22, 2021
Permit issued
Sep 22, 2021
Declared cost
$20,000
Address
340 Post St

disconnect/removal of (e) 12.5 ton pk6 unit (rtu-2), installation of new 12.5 ton pk6 unit w/economizer disconnect, fuses, smoke detector, plumbing, transition duct work

Open the permit page

$20,000
Apr 4, 2019Expired or cancelled
cancelled Jul 2021
415 Mission StDome Construction Corpdeferred permit for installation of a floating floor/isolated slab on te 38th fl for a gym. ref original pa #201806252845.
Details
Permit
201904047089
Status
cancelled
Filed
Apr 4, 2019
Permit issued
Apr 4, 2019
Declared cost
$50,000
Address
415 Mission St

deferred permit for installation of a floating floor/isolated slab on te 38th fl for a gym. ref original pa #201806252845.

Open the permit page

$50,000
Feb 15, 2018Completed
final sign-off Apr 2019
201 King StExcolo Construction Servicesrevision to 201706219948 install acoustical ceiling, scan concrete, install clies, track, gyp board, tape & paint
Details
Permit
201802151463
Status
complete
Filed
Feb 15, 2018
Permit issued
May 11, 2018
Final sign-off
Apr 9, 2019
Declared cost
$214,000
Address
201 King St

revision to 201706219948 install acoustical ceiling, scan concrete, install clies, track, gyp board, tape & paint

Open the permit page

$214,000