Timothy M. O'sullivan
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Tim O'sullivan Structural Eng
- Based in
- San Rafael
- On San Francisco permits
- May 2002 to Sep 2026
595 permits since 2000 (engineer on 504 permits, architect on 79 permits, authorized agent-others on 13 permits, attorney on 2 permits, designer on 2 permits): 392 completed, 54 in progress, 64 never finaled, 85 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 595.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1867 15th Av | retaining walls at yard to level out yard.Details
retaining walls at yard to level out yard. | $25,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 520 Judson Av | voluntary seismic strengtheningDetails
voluntary seismic strengthening | $20,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 41 Garcia Av | repairs to existing front stairs at entry. replace terazzo to brick steps and risers. match finishes. waterproof.Details
repairs to existing front stairs at entry. replace terazzo to brick steps and risers. match finishes. waterproof. | $15,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 297 Richland Av | foundation replacement, seismic upgrade at ground level, eliminate 1 parking garage to storage space.Details
foundation replacement, seismic upgrade at ground level, eliminate 1 parking garage to storage space. | $100,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 3745 Ulloa St | add new bay window at dining room at front elevation on 2nd floor. to remove wall between dining area. to update existing rear house siding to hardie board siding.(color & texture to match existing siding)Details
add new bay window at dining room at front elevation on 2nd floor. to remove wall between dining area. to update existing rear house siding to hardie board siding.(color & texture to match existing siding) | $9,500 | |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 281 16th Av | comply with planning notice of complaint#2026-004305 ent to re-install kitchen.Details
comply with planning notice of complaint#2026-004305 ent to re-install kitchen. | $15,000 | |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 1428 Wawona St | retaining walls at yard for landscapeDetails
retaining walls at yard for landscape | $30,000 | |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 1081 Kansas St | replace (e) concrete retaining wall @ yard and reinforce (e) retaining wall -cut and new retaining wall.Details
replace (e) concrete retaining wall @ yard and reinforce (e) retaining wall -cut and new retaining wall. | $80,000 | |
| Aug 2, 2026 | In progress issued Sep 2026 | 1436 Wawona St | replace retaining wall at yard to support landscapeDetails
replace retaining wall at yard to support landscape | $20,000 | |
| Jul 28, 2026 | In progress issued Aug 2026 | 3819 17th St | new storage room at rear of e unit add retain wall, excavate e crawl spaceDetails
new storage room at rear of e unit add retain wall, excavate e crawl space | $80,000 | |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 1514 34th Av | verify room legalityDetails
verify room legality | ||
| Jul 15, 2026 | In progress issued Jul 2026 | 835 Alabama St | Home Quality Remodeling | demolish of roof /shed, rebuild 5 ft fence.Details
demolish of roof /shed, rebuild 5 ft fence. | $500 |
| Jul 14, 2026 | In progress issued Aug 2026 | 2037 14th Av | str revision to 202604229878. layout changes on both levels to include closets & rear facing wall w/ wider opening. added grade beams and replaced (e) posts with load bearing wall at lower level. remove exterior spiral stair. re-framed living room roof. add shearwalls at property line walls @ l1.Details
str revision to 202604229878. layout changes on both levels to include closets & rear facing wall w/ wider opening. added grade beams and replaced (e) posts with load bearing wall at lower level. remove exterior spiral stair. re-framed living room roof. add shearwalls at property line walls @ l1. | ||
| Jun 24, 2026 | In progress issued Oct 2026 | 255 Sanchez St | A Tamam Construction Inc. | revision to bpa#202510318668 & 202506047908 per district inspector about beam changeDetails
revision to bpa#202510318668 & 202506047908 per district inspector about beam change | |
| Jun 23, 2026 | In progress issued Jun 2026 | 280 Roosevelt Wy | replace rear-yard wood landscape retaining wall and construct new concrete wall, about 20 feet in length, 5 feet retained height, provide 42-inch tall metal guardrail atop stem.Details
replace rear-yard wood landscape retaining wall and construct new concrete wall, about 20 feet in length, 5 feet retained height, provide 42-inch tall metal guardrail atop stem. | $15,000 | |
| Jun 10, 2026 | In progress issued Jul 2026 | 222 Juanita Wy | West Beam Construction Llc | partial rear of building foundation replace, girder upgrade at basement, partial excavation at basment (storage) less than 50 cy.Details
partial rear of building foundation replace, girder upgrade at basement, partial excavation at basment (storage) less than 50 cy. | $50,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 2226 25th Av | Building By Design | plan revision to #202407196864: per inspector request to building framing, add skylight and framing.Details
plan revision to #202407196864: per inspector request to building framing, add skylight and framing. | $20,000 |
| Jun 8, 2026 | Expired or cancelled withdrawn Aug 2026 | 280 Roosevelt Wy | new roof deck, 4'x32" side, rear addition, new windows + doors, partition walls. all new 5/8" type x 6wb.Details
new roof deck, 4'x32" side, rear addition, new windows + doors, partition walls. all new 5/8" type x 6wb. | $300,000 | |
| Jun 2, 2026 | In progress issued Jul 2026 | 2772 41st Av | Frank Walley Construction | new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows.Details
new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows. | $50,000 |
| May 5, 2026 | In progress issued Jun 2026 | 1662 24th Av | Millwright Construction | porch & stairs to yard from lowerl level bedroomDetails
porch & stairs to yard from lowerl level bedroom | $5,000 |
| Apr 22, 2026 | In progress issued May 2026 | 2037 14th Av | Fog Horn Builders Inc | kitchen & bath remodel. legalize lower room at garage level (260 sqft). add bathroom at lower level. voluntary seismic strengthening both levelsDetails
kitchen & bath remodel. legalize lower room at garage level (260 sqft). add bathroom at lower level. voluntary seismic strengthening both levels | $160,000 |
| Apr 22, 2026 | In progress issued May 2026 | 1370 Wallace Av | Wilko Builders Llc. | provide a revision to (e) permit# 202503132201. adding deferred electrical. revising a number of interior partitions & restrooms.Details
provide a revision to (e) permit# 202503132201. adding deferred electrical. revising a number of interior partitions & restrooms. | $117,372 |
| Apr 7, 2026 | In progress issued Aug 2026 | 826 Haight St | Pacific Edge Construction Inc | remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.Details
remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall. | $38,000 |
| Mar 31, 2026 | In progress issued Apr 2026 | 1867 15th Av | F J Sandoval Co | voluntary strengthening at upper and lower partial plans, replace dining room window not visiable from street. upgrade partial foundationDetails
voluntary strengthening at upper and lower partial plans, replace dining room window not visiable from street. upgrade partial foundation | $35,000 |
| Mar 17, 2026 | In progress issued May 2026 | 1500 Davidson Av | unit d: to comply w/ nov 2026-49983 legalize interior storage within warehouse. actual scope of work includes removal and replacement of (e) drywall on ground floor office area and installation of plywood wall sheathing and relocation of toilet room wall.Details
unit d: to comply w/ nov 2026-49983 legalize interior storage within warehouse. actual scope of work includes removal and replacement of (e) drywall on ground floor office area and installation of plywood wall sheathing and relocation of toilet room wall. | $80,000 | |
| Mar 10, 2026 | Completed final sign-off Jun 2026 | 379 Day St | Avis Builders And Design Corp | new master bathroom in existing closet.Details
new master bathroom in existing closet. | $20,000 |
| Mar 10, 2026 | In progress issued Apr 2026 | 712 24th Av | kitchen, dining, living restore ceilings due to fire damage; replace kitchen cabinets, plumbing, electric upgrade; (e) sunroom post/footing connection/dry rot; add windows not visible from streetDetails
kitchen, dining, living restore ceilings due to fire damage; replace kitchen cabinets, plumbing, electric upgrade; (e) sunroom post/footing connection/dry rot; add windows not visible from street | $45,000 | |
| Mar 10, 2026 | In progress filed Mar 2026, not yet issued | 219 Roosevelt Wy | replace front propertyline fesnce in kind(wood fence and gate)Details
replace front propertyline fesnce in kind(wood fence and gate) | $15,000 | |
| Feb 12, 2026 | Completed final sign-off May 2026 | 1304 Valencia St | Pacific Edge Construction Inc | earth shoring permit behind a retaining wall along line 6 (between lines a & b). ref pa #2022-0420-2645/s1Details
earth shoring permit behind a retaining wall along line 6 (between lines a & b). ref pa #2022-0420-2645/s1 | $4,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 1445 Taraval St | Mac Kenzie Construction | removed window and installed new door - misc sheetrock repair and painting.Details
removed window and installed new door - misc sheetrock repair and painting. | $750 |
| Dec 11, 2025 | Completed final sign-off May 2026 | 396 Crestlake Dr | Jim Fergus Construction | kitchen and bath remodel: replace in kind except make opening to kichen wider. reinforce existing balcony deck and replace guardrail.Details
kitchen and bath remodel: replace in kind except make opening to kichen wider. reinforce existing balcony deck and replace guardrail. | $50,000 |
| Oct 31, 2025 | In progress issued Nov 2025 | 255 Sanchez St | A Tamam Construction Inc. | revision to pa #202506047908 for kitchen remodel project. add scope to enclose existing lightwell patio with skylights. remove hall at kitchen to patio.Details
revision to pa #202506047908 for kitchen remodel project. add scope to enclose existing lightwell patio with skylights. remove hall at kitchen to patio. | $15,000 |
| Oct 28, 2025 | Completed final sign-off Aug 2026 | 176 Parker Av | revision to pa #202507312045 to reflect adjustments to foundation location for garage modificationDetails
revision to pa #202507312045 to reflect adjustments to foundation location for garage modification | ||
| Oct 23, 2025 | Completed final sign-off Jun 2026 | 630 Jones St | Ac And Company | legalize water closet (toilet and sink) at existing ground level storage space. to comply with nov #202182155Details
legalize water closet (toilet and sink) at existing ground level storage space. to comply with nov #202182155 | $10,000 |
| Oct 15, 2025 | In progress issued Feb 2026 | 1450 Guerrero St | roof deck at front of building on top of existing flat roofDetails
roof deck at front of building on top of existing flat roof | $20,000 | |
| Oct 1, 2025 | In progress filed Oct 2025, not yet issued | 927 Union St | add new redwood roof deck at building via (e) stair roof pent deck located close to front of buildingDetails
add new redwood roof deck at building via (e) stair roof pent deck located close to front of building | $25,000 | |
| Sep 30, 2025 | In progress issued Nov 2025 | 2573 Post St | replace 25 ft of soldier pile retain wall in yard used as landscape terraceDetails
replace 25 ft of soldier pile retain wall in yard used as landscape terrace | $20,000 | |
| Sep 23, 2025 | Completed final sign-off Oct 2025 | 1584 11th Av | Northpoint Builders | comply w/ nov # 202542638: remove rear stair penthouse structure.Details
comply w/ nov # 202542638: remove rear stair penthouse structure. | $10,000 |
| Sep 11, 2025 | Completed final sign-off Feb 2026 | 246 Ney St | Lone Mountain Homes Inc. | foundation upgrades. foundation coating/waterproofing. drainage improvement.Details
foundation upgrades. foundation coating/waterproofing. drainage improvement. | $25,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 3050 Market St | Christopher Wells Construction Inc. | partial foundation replacement approximately 17'-6". replace concrete steps to yard in kind.Details
partial foundation replacement approximately 17'-6". replace concrete steps to yard in kind. | $25,000 |
| Sep 4, 2025 | In progress issued Nov 2025 | 1662 24th Av | Millwright Construction | conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space.Details
conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space. | $80,000 |
| Jul 31, 2025 | Completed final sign-off Aug 2026 | 176 Parker Av | modify garage to 2 vehicle tandem. adjust e) ground level plan at rear of garage- remove interior walls at ground level, add windows at alley & rearDetails
modify garage to 2 vehicle tandem. adjust e) ground level plan at rear of garage- remove interior walls at ground level, add windows at alley & rear | $88,000 | |
| Jul 25, 2025 | In progress issued Oct 2025 | 1445 48th Av | rear parking garage (share w/1447 48th av) compliance to nov 202537535 for 1445 48th av: structural upgrade to e) carport at rear of lot. refer to p/a 2025-0725-1646 for accompanying p/a.Details
rear parking garage (share w/1447 48th av) compliance to nov 202537535 for 1445 48th av: structural upgrade to e) carport at rear of lot. refer to p/a 2025-0725-1646 for accompanying p/a. | $40,000 | |
| Jul 25, 2025 | In progress filed Jul 2025, not yet issued | 1400 Lombard St | Ac And Company | install power door operator at front enter door.Details
install power door operator at front enter door. | $5,000 |
| Jul 25, 2025 | In progress filed Jul 2025, not yet issued | 1408 Lombard St | Ac And Company | install power door operator at front enter door.Details
install power door operator at front enter door. | $5,000 |
| Jul 25, 2025 | In progress issued Oct 2025 | 1447 48th Av | rear parking garage (share w/1445 48th av) compliance to nov 202538040 for 1447 48th av: structural upgrade to wood framing & seimic improvement. refer to p/a 2025-0725-1648 for accompanying p/a.Details
rear parking garage (share w/1445 48th av) compliance to nov 202538040 for 1447 48th av: structural upgrade to wood framing & seimic improvement. refer to p/a 2025-0725-1648 for accompanying p/a. | $40,000 | |
| Jun 4, 2025 | In progress issued Jun 2025 | 255 Sanchez St | A Tamam Construction Inc. | kitchen remodel. move e) lightwell wall. structural upgrade at kitchenDetails
kitchen remodel. move e) lightwell wall. structural upgrade at kitchen | $80,000 |
| May 20, 2025 | In progress issued Jun 2025 | 2466 17th Av | replace portion of rear yard retain wall in kind approx 15 lineal ftDetails
replace portion of rear yard retain wall in kind approx 15 lineal ft | $20,000 | |
| May 15, 2025 | Completed final sign-off Jun 2025 | 222 Webster St | revision to 202304055116 to delete windows in storage and also reflect existing condition at laundry and utility roomDetails
revision to 202304055116 to delete windows in storage and also reflect existing condition at laundry and utility room | ||
| Apr 24, 2025 | In progress issued Apr 2025 | 3159 16th St | Ac And Company | comply with sf health dept correction list for bar/eating prep.sheetrock ceiling with 2 sheets of 5/8" type x s.r. for fire rating separation to living spaces. add utility sink adjacent to bar- 30 amp circuit for #8 approval perfect fry equipmentDetails
comply with sf health dept correction list for bar/eating prep.sheetrock ceiling with 2 sheets of 5/8" type x s.r. for fire rating separation to living spaces. add utility sink adjacent to bar- 30 amp circuit for #8 approval perfect fry equipment | $20,000 |
| Apr 23, 2025 | In progress issued Oct 2025 | 1370 Wallace Av | Wilko Builders Llc., Gerson Construction Inc., Meylan Construction | to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f.Details
to comply w/ nov# 201845201, 201845202, 201842931, and orders of abatements: demo work done without permit. retroactively permit (e) roof to expand building envelope over (e) retaining walls (permit # 202411124831). construct new gender neutral baths and addl req. fixtures as per cpc 422.1 on 1/f. | $117,372 |
| Apr 8, 2025 | In progress issued Jun 2025 | 3043 Market St | new roof deck and associated sprial stair (enclosed by a penthouse) for unit 3043, new ground floor partition wall and 1- hour exit passageway.Details
new roof deck and associated sprial stair (enclosed by a penthouse) for unit 3043, new ground floor partition wall and 1- hour exit passageway. | $25,000 | |
| Apr 1, 2025 | In progress issued Jul 2025 | 2112 18th Av | Quinlan Construction | kitchen remodel, remove walls at kitchen/dining. remodel upstairs bathroom/add new bathroom upstairs. modify upstairs bedroom, relocate rear bedroom window.Details
kitchen remodel, remove walls at kitchen/dining. remodel upstairs bathroom/add new bathroom upstairs. modify upstairs bedroom, relocate rear bedroom window. | $90,000 |
| Mar 21, 2025 | Completed final sign-off Feb 2026 | 378 Vernon St | J B Const & Maint Co | voluntary seismic strengthening to lower level; remodel family room, add new bathroom at 1st floor, remodel kitchen at 2nd floor.Details
voluntary seismic strengthening to lower level; remodel family room, add new bathroom at 1st floor, remodel kitchen at 2nd floor. | $110,000 |
| Mar 7, 2025 | In progress filed Mar 2025, not yet issued | 332 03rd Av | improvements to existing attic. add 2 dormers at south side of roof. reinforce existing attic floor. remove existing siding covering original front elev. attic window. add new lighting in attic. attic level is not an occupiable space (not heated).Details
improvements to existing attic. add 2 dormers at south side of roof. reinforce existing attic floor. remove existing siding covering original front elev. attic window. add new lighting in attic. attic level is not an occupiable space (not heated). | $35,000 | |
| Feb 19, 2025 | In progress filed Feb 2025, not yet issued | 41 Garcia Av | revision to permit 202103056033 with foundation adjustment per city inspector. revise hardy frame to timber shearwallDetails
revision to permit 202103056033 with foundation adjustment per city inspector. revise hardy frame to timber shearwall | ||
| Feb 14, 2025 | Completed final sign-off Jul 2025 | 1414 Guerrero St | Kelly Properties Inc Dba Kelly Bros. Con | replace lower rear unit & upper rear unit balcony in-kind due to dry rotDetails
replace lower rear unit & upper rear unit balcony in-kind due to dry rot | $16,000 |
| Feb 6, 2025 | Completed final sign-off Feb 2026 | 1101 Irving St | Paniagua Construction Inc | remove (e) failed stair penthouse and replace with new metal roof hatch and fixed metal stair ladder. in-fill roof. unoccuppied roof.Details
remove (e) failed stair penthouse and replace with new metal roof hatch and fixed metal stair ladder. in-fill roof. unoccuppied roof. | $25,000 |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 1354 Pacific Av | Doyle Developments | voluntary bolting of wood sill plate (about 150 lineal feet) and posts (about 10) to foundation, no plywood sheathing.Details
voluntary bolting of wood sill plate (about 150 lineal feet) and posts (about 10) to foundation, no plywood sheathing. | $7,500 |
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 2539 18th Av | Northpoint Builders | voluntary added foundation & structural support to e) sunroomDetails
voluntary added foundation & structural support to e) sunroom | $15,000 |
| Jan 14, 2025 | Expired or cancelled cancelled Jan 2025 | 1926 Jefferson St | roof deck over 4th floorDetails
roof deck over 4th floor | $15,000 | |
| Jan 2, 2025 | Completed final sign-off Jan 2026 | 142 Arguello Bl | Christopher Wells Construction Inc. | partial south foundation upgrade to accomodate grade clearance at garage space. interior work - side of building.Details
partial south foundation upgrade to accomodate grade clearance at garage space. interior work - side of building. | $15,000 |
| Dec 18, 2024 | In progress issued May 2026 | 2029 Wawona St | alterations to lower level foundation and interior stairway from garage to lower level.Details
alterations to lower level foundation and interior stairway from garage to lower level. | $22,000 | |
| Nov 14, 2024 | Completed final sign-off Mar 2025 | 2631 39th Av | B W H Builder Inc. | demolish and reconstruct rotten and leaking frong staircase in tunnel entry, not visible from street. add new door between tunnel entry and garage.Details
demolish and reconstruct rotten and leaking frong staircase in tunnel entry, not visible from street. add new door between tunnel entry and garage. | $10,000 |
| Sep 11, 2024 | Expired or cancelled withdrawn Jul 2026 | 222 Juanita Wy | partial foundation replace at basement. girder upgrade at basement. partial excavation at basement. add slab.Details
partial foundation replace at basement. girder upgrade at basement. partial excavation at basement. add slab. | $45,000 | |
| Sep 10, 2024 | Completed final sign-off Apr 2025 | 2950 26th Av | W B Jordan Inc **See Notes** | revision to pa# 202403087441, to add additional support at interior stair and floor.Details
revision to pa# 202403087441, to add additional support at interior stair and floor. | $2,000 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 1535 Green St | T Prior Building Co | replace in-kind courtyard fence.Details
replace in-kind courtyard fence. | $7,500 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 1545 Green St | T Prior Building Co | replace in-kind courtyard fence.Details
replace in-kind courtyard fence. | $7,500 |
| Aug 13, 2024 | In progress issued Feb 2025 | 41 Garcia Av | remodel (e) lower level plan to family room, bedroom, office bathroom & laundry roomDetails
remodel (e) lower level plan to family room, bedroom, office bathroom & laundry room | $100,000 | |
| Aug 9, 2024 | Completed final sign-off Sep 2024 | 2518 Diamond St | J B Const & Maint Co | repair to e) front stair. demo 50%, replace in-kind all finishesDetails
repair to e) front stair. demo 50%, replace in-kind all finishes | $9,500 |
| Aug 9, 2024 | Completed final sign-off Apr 2025 | 3124 21st St | Mosvaler Construction Inc | replace roof and rafters and roofing.Details
replace roof and rafters and roofing. | $30,000 |
| Aug 2, 2024 | Completed final sign-off Sep 2024 | 23 Los Palmos Dr | Ac And Company | repairs to existing wood deck at rear of building(less than 50%). replace guardrail in kind, install structural upgrades. replace dryrot, horizontal tiedown.Details
repairs to existing wood deck at rear of building(less than 50%). replace guardrail in kind, install structural upgrades. replace dryrot, horizontal tiedown. | $7,500 |
| Jul 17, 2024 | Completed final sign-off Jul 2025 | 2523 20th Av | install new wood deck and stairs at rear of building to yard.Details
install new wood deck and stairs at rear of building to yard. | $12,000 | |
| Jul 10, 2024 | In progress issued Aug 2024 | 160 Miraloma Dr | install new residential elevator at living room to service all 4 "stops" (all levels) all interior work only - not seen from street.Details
install new residential elevator at living room to service all 4 "stops" (all levels) all interior work only - not seen from street. | $100,000 | |
| Jun 12, 2024 | In progress filed Jun 2024, not yet issued | 1432 Wawona St | retain wall at rear yard space to replace (e) and add new wallsDetails
retain wall at rear yard space to replace (e) and add new walls | $30,000 | |
| Jun 4, 2024 | Completed final sign-off Apr 2025 | 215 Parnassus Av | Doyle Developments | repairs to existing front stairs(entry). re-frame tread and riser supports, waterproof. replace with brick finish. replace rear of building coved siding. match finishes.Details
repairs to existing front stairs(entry). re-frame tread and riser supports, waterproof. replace with brick finish. replace rear of building coved siding. match finishes. | $15,000 |
| May 8, 2024 | Expired or cancelled expired Apr 2026 | 49 Nordhoff St | Northpoint Builders | revision to 202403157959 to add 20 ft underpin of south foudation & add 15 ft foundation at garage (structural only) no exterior workDetails
revision to 202403157959 to add 20 ft underpin of south foudation & add 15 ft foundation at garage (structural only) no exterior work | $10,000 |
| Apr 3, 2024 | In progress filed Apr 2024, not yet issued | 312 Connecticut St | remove (e) 2 powder rooms (toilet & sink) @ street level and 1 powder room @ 3nd level; remove partial floor @ 2nd level; add steel beams to support 2nd level (partial) change of occupacny to eliminate the a-3 useDetails
remove (e) 2 powder rooms (toilet & sink) @ street level and 1 powder room @ 3nd level; remove partial floor @ 2nd level; add steel beams to support 2nd level (partial) change of occupacny to eliminate the a-3 use | $45,000 | |
| Mar 29, 2024 | Completed final sign-off Apr 2024 | 268 Ripley St | Northpoint Builders | revision to 202403218292 (renewal of 201609268787). to reflect converted dining into bedroom 2md fl. converted closet to powder rm at 1st fl. 1 new 30" x 50" skylight at (e) kitchen (invisible from st)Details
revision to 202403218292 (renewal of 201609268787). to reflect converted dining into bedroom 2md fl. converted closet to powder rm at 1st fl. 1 new 30" x 50" skylight at (e) kitchen (invisible from st) | $5,000 |
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 142 Ashton Av | Daylight Construction | g/f: to comply with nov 202315358 (work without permit). to remove unwarranted bathroom and interior walls at lower level.Details
g/f: to comply with nov 202315358 (work without permit). to remove unwarranted bathroom and interior walls at lower level. | $1,000 |
| Feb 26, 2024 | Completed final sign-off Oct 2024 | 2818 23rd St | Buchmann General Building | replace in kind rear stairs to yard.Details
replace in kind rear stairs to yard. | $5,500 |
| Feb 2, 2024 | Completed final sign-off Jul 2024 | 364 17th Av | Pacific Edge Construction Inc | add approx 173 sf of heated space office to downstaira lelve. revision to 202307212707Details
add approx 173 sf of heated space office to downstaira lelve. revision to 202307212707 | $1,000 |
| Feb 1, 2024 | In progress issued Feb 2024 | 2757 23rd St | Ac And Company | replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hallDetails
replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hall | $35,000 |
| Jan 16, 2024 | In progress filed Jan 2024, not yet issued | 12 Juanita Wy | 999 sqft 2nd story addition to promary unit: new master bedroom, walk-in-closet, and master bath.Details
999 sqft 2nd story addition to promary unit: new master bedroom, walk-in-closet, and master bath. | $200,000 | |
| Jan 12, 2024 | Completed final sign-off Jul 2024 | 1998 Vallejo St | Deep Elm Construction Llc | revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades)Details
revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades) | $1,000 |
| Jan 9, 2024 | Completed final sign-off Mar 2024 | 141 Morse St | Ac And Company | new dormer at north elevation to (e) attic space per nov # 202311713Details
new dormer at north elevation to (e) attic space per nov # 202311713 | $6,000 |
| Jan 3, 2024 | Completed final sign-off Sep 2024 | 1132 Noe St | Prior Construction, De Barra Builders | replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement.Details
replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement. | $55,000 |
| Dec 27, 2023 | In progress filed Dec 2023, not yet issued | 1627 Kirkwood Av | to comply w/nov# 200006672 item 3 & 5, rebuild existing collapsed fire egress stairs inkind rear stairs to yard (egress). no firewall construction.Details
to comply w/nov# 200006672 item 3 & 5, rebuild existing collapsed fire egress stairs inkind rear stairs to yard (egress). no firewall construction. | $15,000 | |
| Nov 29, 2023 | Completed final sign-off Sep 2024 | 2050 Lyon St | Ac And Company | unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosureDetails
unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosure | $12,000 |
| Nov 28, 2023 | In progress issued Feb 2024 | 1246 43rd Av | Quinlan Construction | rev to pa# 2023-0811-4248: remodel (e) upper level plan bathroom remove lightwell at same bathroom add bathroom at closet at front bedroom upper levelDetails
rev to pa# 2023-0811-4248: remodel (e) upper level plan bathroom remove lightwell at same bathroom add bathroom at closet at front bedroom upper level | |
| Oct 20, 2023 | Completed final sign-off Apr 2025 | 268 Gold Mine Dr | Mac Kenzie Construction | relocate entry door 3' from building facade. add entry door at entry front in liev of (e) ornament gate. relocate (e) washer & dryer from garage to interior space closet.Details
relocate entry door 3' from building facade. add entry door at entry front in liev of (e) ornament gate. relocate (e) washer & dryer from garage to interior space closet. | $10,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 2 Coleridge St | Ac And Company | revision to 202305127708 to replace rear of building wood stairs serving as required second means of egress "to reflect as-is condition" that was incorrectly drafted.Details
revision to 202305127708 to replace rear of building wood stairs serving as required second means of egress "to reflect as-is condition" that was incorrectly drafted. | |
| Oct 10, 2023 | Completed final sign-off Jul 2024 | 465 38th Av | Bryce C B Construction Inc | voluntary foundation improvements and seismic strengthening. add anchor bolts + plywood wall at garage. increase ceiling height at e utility space bby lowering slab and add paritions to separate it from kitchenDetails
voluntary foundation improvements and seismic strengthening. add anchor bolts + plywood wall at garage. increase ceiling height at e utility space bby lowering slab and add paritions to separate it from kitchen | $16,000 |
| Oct 6, 2023 | Completed final sign-off Jul 2024 | 364 17th Av | Pacific Edge Construction Inc | revision to pa# 202307212707, to add more foundation support & change beams in kitchen.Details
revision to pa# 202307212707, to add more foundation support & change beams in kitchen. | $10,000 |
| Oct 5, 2023 | Completed final sign-off Jan 2024 | 1412 Jackson St | Christopher Wells Construction Inc. | revision to 202304276592 per direction of district building inspector to reflect framing in-kind @ rear wall & front wall (partial) due to dry rot, all material & finishes in-kind. work at top floor only.Details
revision to 202304276592 per direction of district building inspector to reflect framing in-kind @ rear wall & front wall (partial) due to dry rot, all material & finishes in-kind. work at top floor only. | $3,000 |
| Sep 20, 2023 | Completed final sign-off Dec 2024 | 2664 22nd St | Ac And Company | restore unwarrented rooms at garage level (behind garage to storage space).Details
restore unwarrented rooms at garage level (behind garage to storage space). | $2,000 |
| Sep 8, 2023 | In progress issued Nov 2023 | 1846 16th Av | replace (e) rear yard landscape wood with concrete retaining wall. level terraces, re-build side porch stairs in-kind. rear ground level yard deck landing to yard.Details
replace (e) rear yard landscape wood with concrete retaining wall. level terraces, re-build side porch stairs in-kind. rear ground level yard deck landing to yard. | $23,000 | |
| Aug 23, 2023 | Completed final sign-off Apr 2025 | 268 Gold Mine Dr | Mac Kenzie Construction | revision to pa# 202303284506. repairs to water damage. remodel kitchen + baths. remove partial wall at kitchen.Details
revision to pa# 202303284506. repairs to water damage. remodel kitchen + baths. remove partial wall at kitchen. | $20,000 |
| Aug 16, 2023 | Completed final sign-off Sep 2023 | 733 Congo St | Daylight Construction | replace in-kind rear stair to yardDetails
replace in-kind rear stair to yard | $15,000 |
| Aug 11, 2023 | Completed final sign-off Jan 2024 | 1855 Oak St | partial replacemnt " in-kind" of side of building wood stairs serving as second means of egressDetails
partial replacemnt " in-kind" of side of building wood stairs serving as second means of egress | $10,000 |