Suzanne Dehne
- Listed as
- architect, authorized agent-others, designer
- Firm
- Sujo Design Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Apr 2018
27 permits since 2000 (architect on 26 permits, authorized agent-others on 2 permits, designer on 1 permit): 25 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2018 | Completed final sign-off Jan 2019 | 167 08th Av | Towey Construction Inc. | new exterior stairs to existing deck.Details
new exterior stairs to existing deck. | $12,000 |
| Feb 6, 2018 | Completed final sign-off Dec 2018 | 1559 44th Av | Cht Properties Development | ground floor: addition below extg 2nd floor extension. remodel of extg garage area to include bedroom, bathroom, family room, laundry and storage. structural upgrade as req. demolition of interior walls is less than 75%.Details
ground floor: addition below extg 2nd floor extension. remodel of extg garage area to include bedroom, bathroom, family room, laundry and storage. structural upgrade as req. demolition of interior walls is less than 75%. | $65,000 |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 167 08th Av | infill beneath rear nook. remodel 1st, 2nd, 3rd fl, including mud rm, living rm, kitchen, dining rm, family rm, 4 bedrms, 1 office, 3 full bathrms, 1 1/2 bathrm, closet, laundry closet and garage.Details
infill beneath rear nook. remodel 1st, 2nd, 3rd fl, including mud rm, living rm, kitchen, dining rm, family rm, 4 bedrms, 1 office, 3 full bathrms, 1 1/2 bathrm, closet, laundry closet and garage. | $442,000 | |
| Dec 20, 2016 | Completed final sign-off Jun 2017 | 100 Vasquez Av | remodel of 1/f to include bedroom, 2 bathrooms, laundry area & multi-purpose rom, new hvac & water heater.Details
remodel of 1/f to include bedroom, 2 bathrooms, laundry area & multi-purpose rom, new hvac & water heater. | $75,000 | |
| Nov 7, 2016 | Completed final sign-off Oct 2017 | 35 Bemis St | Terence Mcmahon Construction | new office @ unit #1 and new bathroom @ unit #1. max excavation = 5 cubic feet. max dept = 3'0"Details
new office @ unit #1 and new bathroom @ unit #1. max excavation = 5 cubic feet. max dept = 3'0" | $37,000 |
| Jan 8, 2016 | Completed final sign-off Dec 2018 | 516 Hill St | Capomastro Group:Acalifornia Corp. | horizontal addition. rear 2-story addition including new family room at 1st floor & master bedroom suite with closet & master bathroom at 2nd floor.Details
horizontal addition. rear 2-story addition including new family room at 1st floor & master bedroom suite with closet & master bathroom at 2nd floor. | $55,000 |
| Jul 23, 2015 | Completed final sign-off Mar 2017 | 1385 Monterey Bl | Grant Ian Hetherington | remodel kitchen & 3 bathrooms, new elevator, remove (e) stair & install (n) stair from basement to 1/f, relocate washer & dryer, relocate furnace & water heater.Details
remodel kitchen & 3 bathrooms, new elevator, remove (e) stair & install (n) stair from basement to 1/f, relocate washer & dryer, relocate furnace & water heater. | $175,000 |
| May 27, 2015 | Completed final sign-off Aug 2015 | 4271 26th St | Mrcc | revision 201306280785-s1, revise laundry room, mud room to bedroomDetails
revision 201306280785-s1, revise laundry room, mud room to bedroom | |
| May 27, 2015 | Completed final sign-off Sep 2017 | 4216 26th St | Dore Const. Of Calif. Inc. | 2nd story addition including (4) bedrooms & (2) baths. (at rear). driveway upgrades & (n) garage door.Details
2nd story addition including (4) bedrooms & (2) baths. (at rear). driveway upgrades & (n) garage door. | $45,000 |
| Jan 22, 2015 | Completed final sign-off May 2015 | 880 Urbano Dr | Globus Builder Inc | add door @ (e) window location @ first floor. add hallway @ first floor.Details
add door @ (e) window location @ first floor. add hallway @ first floor. | $10,000 |
| Jan 22, 2015 | Completed final sign-off Aug 2015 | 1578 44th Av | Streiffer Burnham Const., Inc. | add master suite @ first floor (bedroom, den, & full bath). replace (e)door & (e) wondows @ rear first floor.Details
add master suite @ first floor (bedroom, den, & full bath). replace (e)door & (e) wondows @ rear first floor. | $50,000 |
| Oct 29, 2014 | Completed final sign-off Apr 2015 | 957 Grove St | Walsh Construction | revision to extg bathroom permit #201409247229. repair and replace extg bathroom flooring. repair and replace damaged rear wall at bathroomDetails
revision to extg bathroom permit #201409247229. repair and replace extg bathroom flooring. repair and replace damaged rear wall at bathroom | $5,000 |
| Sep 16, 2014 | Completed final sign-off Apr 2015 | 210 Lisbon St | Michael Heavey Construction | new curb cut at extg driving garage location.Details
new curb cut at extg driving garage location. | $2,000 |
| Jun 27, 2014 | Completed final sign-off Aug 2014 | 2526 Kirkham St | Sunset Improvements | new bathroom addition @ 1st floor.Details
new bathroom addition @ 1st floor. | $10,000 |
| Feb 18, 2014 | Completed final sign-off Apr 2014 | 2143 42nd Av | Paul Slattery | revision to 201305096498: reduction in scope from previously issued permit. omit new family rm, guest room, bath, laundry and omit insulation , windows and doors at rearDetails
revision to 201305096498: reduction in scope from previously issued permit. omit new family rm, guest room, bath, laundry and omit insulation , windows and doors at rear | |
| Feb 7, 2014 | Completed final sign-off Mar 2019 | 1236 19th Av | Dliu Construction | horiz'l & vert addition. convert single fam residence into 4 units, add 3rd floor & rear yard addition. each unit has 1 kitchen, 2 bathrms & 3 bedrms, lower unit has only 2 bedrms, (new 1/f unit 1: 2 bedrm/1 kitch, unit 2 2/f : 3 bedrm, 2 bathrm/1 kitchen; unit 3 (3/f: 3 bedrms/2 bathrm, 1 kitchen)Details
horiz'l & vert addition. convert single fam residence into 4 units, add 3rd floor & rear yard addition. each unit has 1 kitchen, 2 bathrms & 3 bedrms, lower unit has only 2 bedrms, (new 1/f unit 1: 2 bedrm/1 kitch, unit 2 2/f : 3 bedrm, 2 bathrm/1 kitchen; unit 3 (3/f: 3 bedrms/2 bathrm, 1 kitchen) | $236,000 |
| Dec 20, 2013 | Completed final sign-off Mar 2016 | 214 Chenery St | Grant Ian Hetherington | bring previous addition up to code (from 1980). two story addition in rear including kitchen, nook and bedroom.Details
bring previous addition up to code (from 1980). two story addition in rear including kitchen, nook and bedroom. | $75,000 |
| Nov 12, 2013 | Expired or cancelled expired Jul 2016 | 511 Mississippi St | Sunworks | 3 skylights and 1 replacement.not visible from street. voluntary structural upgradeDetails
3 skylights and 1 replacement.not visible from street. voluntary structural upgrade | $3,900 |
| Jun 28, 2013 | Completed final sign-off Sep 2015 | 4271 26th St | Mrcc | lower floor addition including bedroom & bathroom & new interior stair. legalize (e) family room @ 2nd floor (garden room).Details
lower floor addition including bedroom & bathroom & new interior stair. legalize (e) family room @ 2nd floor (garden room). | $75,000 |
| Jun 6, 2013 | Completed final sign-off Aug 2013 | 35 Bemis St | S K Builders | stair repair/replacement at side of propertyDetails
stair repair/replacement at side of property | $7,500 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 847 Baker St | Anxin Associates Construction Inc. | two new windows at property line at the carriage house (rear), not visible from street.Details
two new windows at property line at the carriage house (rear), not visible from street. | $1,500 |
| May 9, 2013 | Completed final sign-off Apr 2014 | 2143 42nd Av | Paul Slattery | remodel kitchen & bathroom @ 2nd floor. 1st floor remodel including new family room, guest room, bath & laundry, new insulation window & doors at rear.Details
remodel kitchen & bathroom @ 2nd floor. 1st floor remodel including new family room, guest room, bath & laundry, new insulation window & doors at rear. | $125,000 |
| Mar 18, 2013 | Completed final sign-off Jul 2013 | 666 Rockdale Dr | Grant Ian Hetherington | legalize (e) habitable space on ground floor. remodel of 2 bedrooms at ground floor. remodel of closets at ground floor. new finishes at hallwayDetails
legalize (e) habitable space on ground floor. remodel of 2 bedrooms at ground floor. remodel of closets at ground floor. new finishes at hallway | $15,000 |
| Oct 25, 2012 | Completed final sign-off Apr 2013 | 225 Locust St | Grant Ian Hetherington | stair replacement (replace in kind)Details
stair replacement (replace in kind) | $6,000 |
| Sep 17, 2012 | Completed final sign-off Mar 2013 | 171 San Benito Wy | Grant Ian Hetherington | re-configure closets on 2nd floor & retile master bathroom - plumbing fixtures to remain in existing locations. revision to pa# 201202073687.Details
re-configure closets on 2nd floor & retile master bathroom - plumbing fixtures to remain in existing locations. revision to pa# 201202073687. | $15,000 |
| Feb 2, 2010 | Completed final sign-off Mar 2011 | 2478 14th Av | Grant Ian Hetherington | horizontal addition & remodel to 1st & 2nd floors include new bathrooms on each level, remodel kitchen, new (repalce) stair from 2nd floor to 1st, new deck & rear landscaping, fence repair & addtional bedroom, new family rm, bedroom, office & mudroom on 1st floor.Details
horizontal addition & remodel to 1st & 2nd floors include new bathrooms on each level, remodel kitchen, new (repalce) stair from 2nd floor to 1st, new deck & rear landscaping, fence repair & addtional bedroom, new family rm, bedroom, office & mudroom on 1st floor. | $95,000 |
| Aug 30, 2005 | Completed final sign-off Jul 2006 | 210 Lisbon St | rev. to (e) appl#200409023282 revised scope (reduced) work at basement & new stair omittedDetails
rev. to (e) appl#200409023282 revised scope (reduced) work at basement & new stair omitted |