Block 3103, lot 015
171 San Benito Way
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 4,792 sq ft
- Lot
- 9,914 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 1, 2017 | Never finaled issued Aug 2017, no final | 171 San Benito Wy | Grant Ian Hetherington | replace exisiting wood shingles at third story inkind. no other work.Details
replace exisiting wood shingles at third story inkind. no other work. | $8,000 |
| May 2, 2017 | Never finaled issued May 2017, no final | 171 San Benito Wy | Grant Ian Hetherington | replace all existing wood window sashes on second floor with like kind, custom matching wood sashesDetails
replace all existing wood window sashes on second floor with like kind, custom matching wood sashes | $10,000 |
| Sep 17, 2012 | Completed final sign-off Mar 2013 | 171 San Benito Wy | Grant Ian Hetherington | re-configure closets on 2nd floor & retile master bathroom - plumbing fixtures to remain in existing locations. revision to pa# 201202073687.Details
re-configure closets on 2nd floor & retile master bathroom - plumbing fixtures to remain in existing locations. revision to pa# 201202073687. | $15,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2013 | 171 San Benito Wy | Grant Ian Hetherington | excavate and remodel basement to include bedroom, bathroom, wine cellar and play room. new foundation, new windows, in basementDetails
excavate and remodel basement to include bedroom, bathroom, wine cellar and play room. new foundation, new windows, in basement | $95,000 |
| Jan 26, 2011 | Completed final sign-off May 2011 | 171 San Benito Wy | remodeling of kitchen and 4 and half bathrooms. furnace replacement and painting and painting, kitchen: at least 50% high efficacy (by wattage) lighting, bathrm high efficacy of occupancy sensor,Details
remodeling of kitchen and 4 and half bathrooms. furnace replacement and painting and painting, kitchen: at least 50% high efficacy (by wattage) lighting, bathrm high efficacy of occupancy sensor, | $35,000 | |
| Jan 25, 2011 | Never finaled issued Jan 2011, no final | 171 San Benito Wy | Go Roofing | reroofingDetails
reroofing | $9,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grant Ian Hetherington (4), Go Roofing
- Architects
- Suzanne Dehne
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.