Stanislav Y. Gorbis
- License
- C81928
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C81928 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Blymyer
- Based in
- Alameda
- On San Francisco permits
- Feb 2021 to Dec 2024
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Corestates Construction Services Inc (3), Cupertino Electric Inc.
- Engineers
- Benjamin J Liu
- Authorized agents
- Danielle Whitley
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 1530 Galvez Av | Corestates Construction Services Inc | ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargersDetails
ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers | $40,000 |
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 1501 Newhall St | Corestates Construction Services Inc | ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.Details
ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. | $40,000 |
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 3911 03rd St | Corestates Construction Services Inc | install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.Details
install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls. | $40,000 |
| Feb 16, 2021 | Completed final sign-off Jun 2021 | 350 Pacific Av | Cupertino Electric Inc. | install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot.Details
install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot. | $120,000 |