Permit GraphShortlistSan Francisco building permits since 2000

Stanislav Y. Gorbis

License
C81928
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C81928 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Blymyer
Based in
Alameda
On San Francisco permits
Feb 2021 to Dec 2024

4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 4 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Corestates Construction Services Inc (3), Cupertino Electric Inc.
Engineers
Benjamin J Liu
Authorized agents
Danielle Whitley

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 30, 2024Completed
final sign-off Jul 2025
1530 Galvez AvCorestates Construction Services Incev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers
Details
Permit
202409130751
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers

Open the permit page

$40,000
Dec 30, 2024Completed
final sign-off Jul 2025
1501 Newhall StCorestates Construction Services Incev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.
Details
Permit
202409130750
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.

Open the permit page

$40,000
Dec 30, 2024Completed
final sign-off Jul 2025
3911 03rd StCorestates Construction Services Incinstall 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.
Details
Permit
202409110518
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.

Open the permit page

$40,000
Feb 16, 2021Completed
final sign-off Jun 2021
350 Pacific AvCupertino Electric Inc.install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot.
Details
Permit
202102164734
Permit issued
Mar 24, 2021
Final sign-off
Jun 29, 2021

install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot.

Open the permit page

$120,000