Benjamin J Liu

License
E21280
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E21280 at the Board for Professional Engineers
Listed as
engineer
On San Francisco permits
Feb 2021 to Dec 2024

3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Corestates Construction Services Inc (2), Albion Power Company Inc
Architects
Stanislav Y. Gorbis

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 30, 2024Completed
final sign-off Jul 2025
1530 Galvez AvCorestates Construction Services Incev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers
Details
Permit
202409130751
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers

Open the permit page

$40,000
Feb 16, 2022Completed
final sign-off Oct 2023
850 La PlayaCorestates Construction Services Incinstall 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required for
Details
Permit
202202168135
Permit issued
Dec 14, 2022
Final sign-off
Oct 31, 2023

install 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required for

Open the permit page

$300,000
Feb 23, 2021In progress
issued Apr 2026
800 Howard StAlbion Power Company Incto construct a 837 kw dc (600w x 1395 modules) solar array on moscone west convention center and perform associated roofing repairs.
Details
Permit
202102235185
Permit issued
Apr 28, 2026

to construct a 837 kw dc (600w x 1395 modules) solar array on moscone west convention center and perform associated roofing repairs.

Open the permit page