Joshua Marrow

License
63015
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
Firm
Partner Engineering
Based in
San Francisco
On San Francisco permits
Feb 2015 to Sep 2024

8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 8 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Aligned Technologies Llc Dba Aligned Dev (2), Mulhall Construction Inc. (2), Gil Construction & Assoc Inc., S L M Development Inc.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 24, 2024Completed
final sign-off Feb 2025
667 33rd Avreplace support pole in gargae area due to damage by vehicle
Details
Permit
202409241491
Permit issued
Sep 26, 2024
Final sign-off
Feb 10, 2025

replace support pole in gargae area due to damage by vehicle

Open the permit page

$16,000
Nov 5, 2018Completed
final sign-off Sep 2020
659 Merchant StAligned Technologies Llc Dba Aligned Devvoluntary seismic retrofit to vacant space. disable accessibility upgrade will be filed under separate tenant improvement permit, building will remain vacant, failure to comply will result in issuance of notice of violation per sfbc ab-017.
Details
Permit
201811054929
Permit issued
Dec 16, 2019
Final sign-off
Sep 30, 2020

voluntary seismic retrofit to vacant space. disable accessibility upgrade will be filed under separate tenant improvement permit, building will remain vacant, failure to comply will result in issuance of notice of violation per sfbc ab-017.

Open the permit page

$45,000
Aug 2, 2018Completed
final sign-off Oct 2018
680 Clay StAligned Technologies Llc Dba Aligned Devstructural repairs upper level
Details
Permit
201808026227
Permit issued
Aug 2, 2018
Final sign-off
Oct 18, 2018

structural repairs upper level

Open the permit page

$25,000
Jul 17, 2018Completed
final sign-off Apr 2019
422 Arguello BlGil Construction & Assoc Inc.repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permit
Details
Permit
201807174751
Permit issued
Jul 27, 2018
Final sign-off
Apr 25, 2019

repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permit

Open the permit page

$35,000
Nov 20, 2017Completed
final sign-off May 2019
146 Portola DrMulhall Construction Inc.to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4
Details
Permit
201711204386
Permit issued
Nov 5, 2018
Final sign-off
May 17, 2019

to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4

Open the permit page

$95,000
Jul 18, 2017Completed
final sign-off Sep 2018
1758 Palou Av2nd fl - move kitchen to back right, divide center right room into pantry and closet. remove chimney. remove 2 walls and install a drop header. install bathroom in current kitchen space. reconfigure 1st fl back by expanding back bathroom. add walls to create walk-in closet, widen stair. change
Details
Permit
201707182229
Permit issued
Aug 29, 2017
Final sign-off
Sep 24, 2018

2nd fl - move kitchen to back right, divide center right room into pantry and closet. remove chimney. remove 2 walls and install a drop header. install bathroom in current kitchen space. reconfigure 1st fl back by expanding back bathroom. add walls to create walk-in closet, widen stair. change

Open the permit page

$25,000
Mar 28, 2017Completed
final sign-off Oct 2017
1153 Leavenworth StS L M Development Inc.soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4. maher na
Details
Permit
201703282594
Permit issued
Aug 9, 2017
Final sign-off
Oct 11, 2017

soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4. maher na

Open the permit page

$25,000
Feb 11, 2015Completed
final sign-off Apr 2015
2727 Polk StMulhall Construction Inc.revision to pa#201501206070 s1.1 relocate shear wall due to (e) obstructions, s1.2 relocate shear wall & extend grade beam due to no footing, s2.2 revised detail due to (e) pipe obstructions, s2.3 add (n) sheet to provide details for unforseen (e) conditions.
Details
Permit
201502118048
Permit issued
Feb 12, 2015
Final sign-off
Apr 29, 2015

revision to pa#201501206070 s1.1 relocate shear wall due to (e) obstructions, s1.2 relocate shear wall & extend grade beam due to no footing, s2.2 revised detail due to (e) pipe obstructions, s2.3 add (n) sheet to provide details for unforseen (e) conditions.