Sergio Becerrill
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Mission Bay Construction Services Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Mar 2025
29 permits since 2000 (contractor on 28 permits, authorized agent-others on 1 permit, designer on 1 permit): 18 completed, 2 in progress, 9 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 7, 2025 | In progress issued Sep 2025 | 134 Alpine Tr | replace front non-conforming front steps from sidewalk level to terrace levelDetails
replace front non-conforming front steps from sidewalk level to terrace level | $25,000 | |
| May 7, 2024 | Completed final sign-off Feb 2025 | 1527 20th Av | Mission Bay Construction Services Inc. | convert existing bedroom to primary bathroom & closet. convert existing family room to bedroom. convert existing closet to laundry room. plumbing and electrical in remodeled areaDetails
convert existing bedroom to primary bathroom & closet. convert existing family room to bedroom. convert existing closet to laundry room. plumbing and electrical in remodeled area | $40,000 |
| Feb 12, 2024 | Completed final sign-off Feb 2024 | 3920 Sacramento St | Mission Bay Construction Services Inc. | install sliding glass window screens for awning at the rear.Details
install sliding glass window screens for awning at the rear. | $12,000 |
| Dec 15, 2023 | In progress issued Jan 2024 | 591 Noe St | Mission Bay Construction Services Inc. | install (2) new doors in place of (2) existing windows onto the (e) front deck area. no change to look of building facade, no change to opening size, same width, same htDetails
install (2) new doors in place of (2) existing windows onto the (e) front deck area. no change to look of building facade, no change to opening size, same width, same ht | $12,000 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 3920 Sacramento St | Mission Bay Construction Services Inc. | to comply with nov# 202312112. have pre-fab aluminum awning inspected & legalized.Details
to comply with nov# 202312112. have pre-fab aluminum awning inspected & legalized. | $9,000 |
| Dec 19, 2022 | Never finaled issued Dec 2022, no final | 1924 Pine St | Mission Bay Construction Services Inc. | install (3) new gas fireplace inserts in (e) fireplace boxes. run (n) gas lines. not to install in bedrooms, fireplace shall be direct-vent, gas vent per cmc802.6 & sfmc 802.6.2.Details
install (3) new gas fireplace inserts in (e) fireplace boxes. run (n) gas lines. not to install in bedrooms, fireplace shall be direct-vent, gas vent per cmc802.6 & sfmc 802.6.2. | $15,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 75 Magellan Av | Mission Bay Construction Services Inc. | remodel en suite bathroom at 3rd level. new toilet, vanity, tub, tiles. no change to layout.Details
remodel en suite bathroom at 3rd level. new toilet, vanity, tub, tiles. no change to layout. | $29,000 |
| Aug 7, 2019 | Completed final sign-off Oct 2021 | 2031 29th Av | Mission Bay Construction Services Inc. | revision to 201811297065 rebuild kitchen wallDetails
revision to 201811297065 rebuild kitchen wall | $15,000 |
| Jul 23, 2019 | Completed final sign-off Sep 2019 | 66 Eureka St | Mission Bay Construction Services Inc. | install new toilet & vanity in hallway 1/2 broom. new dwv, add 1 new ckt for vanity light 7 new fan. no change of (e) floor plan.Details
install new toilet & vanity in hallway 1/2 broom. new dwv, add 1 new ckt for vanity light 7 new fan. no change of (e) floor plan. | $5,000 |
| Feb 1, 2019 | Completed final sign-off Mar 2019 | 2135 30th Av | Mission Bay Construction Services Inc. | replace in kind kitchen - cabinets, sink, dw, add lights, plugs and switches.Details
replace in kind kitchen - cabinets, sink, dw, add lights, plugs and switches. | $21,500 |
| Nov 29, 2018 | Completed final sign-off Oct 2021 | 2031 29th Av | Mission Bay Construction Services Inc. | remodel kitchen & bathroom, no change in layoutDetails
remodel kitchen & bathroom, no change in layout | $38,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 1084 Howard St | Mission Bay Construction Services Inc. | unit a: replace kitchen in kind (n) cabinets, tile, sink & appliances. replace bathroom in kind (n) tile, tub, toilet, lavy fixtures. in residence only.Details
unit a: replace kitchen in kind (n) cabinets, tile, sink & appliances. replace bathroom in kind (n) tile, tub, toilet, lavy fixtures. in residence only. | $23,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 753 Shrader St | Mission Bay Construction Services Inc. | replace vanity, tub & toilet in kind. new tiles. no alteration of wall, window and door.Details
replace vanity, tub & toilet in kind. new tiles. no alteration of wall, window and door. | $10,000 |
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 1458 10th Av | Mission Bay Construction Services Inc. | dryrot repair to rear deck, no change to layout, not to exceed 50%, repair in-kindDetails
dryrot repair to rear deck, no change to layout, not to exceed 50%, repair in-kind | $4,800 |
| Feb 5, 2018 | Completed final sign-off Mar 2018 | 742 Haight St | Mission Bay Construction Services Inc. | administrative permit to document number of stories (3) & number of basement/cellars (1). revision to bpa#201801299784Details
administrative permit to document number of stories (3) & number of basement/cellars (1). revision to bpa#201801299784 | |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 1082 Howard St | Mission Bay Construction Services Inc. | barrier removal, remodel new ada restroom. n/a for maherDetails
barrier removal, remodel new ada restroom. n/a for maher | $12,000 |
| May 3, 2017 | Never finaled issued May 2017, no final | 2382 Hyde St | O S Builder, Mission Bay Construction Services Inc. | interior remodel. remodel master bathroom & guest bathroom. create 1/2 bathroom in lower level. remodel kitchen and remove a portion of non-bearing wall in kitchen areaDetails
interior remodel. remodel master bathroom & guest bathroom. create 1/2 bathroom in lower level. remodel kitchen and remove a portion of non-bearing wall in kitchen area | $62,000 |
| Apr 21, 2017 | Completed final sign-off Mar 2018 | 1088 Howard St | Mission Bay Construction Services Inc. | install 3 non-bearing walls. install (n) lights. maher naDetails
install 3 non-bearing walls. install (n) lights. maher na | $17,200 |
| Mar 22, 2017 | Completed final sign-off Aug 2018 | 1088 Howard St | Mission Bay Construction Services Inc. | change of use to light manufacturing. no facade changes. n/a for maher ordinance.155-13. change from retail non-permitted to light manufactoring (factory for pipe product assembly).Details
change of use to light manufacturing. no facade changes. n/a for maher ordinance.155-13. change from retail non-permitted to light manufactoring (factory for pipe product assembly). | $2,000 |
| Mar 22, 2017 | Completed final sign-off Mar 2018 | 1088 Howard St | Mission Bay Construction Services Inc. | barrier removal, update new ada restroom maher naDetails
barrier removal, update new ada restroom maher na | $13,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 431 Capp St | Mission Bay Construction Services Inc. | existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r)Details
existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r) | $40,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | Mission Bay Construction Services Inc. | revision to pa 201608306316: remodel unit 1 at 2nd floor, remodel unit 2 at 3rd and 4th floor level. modify floor plans at 1st , 2nd, 3rd, & 4th floors. modify structural foundation/framing and add dormers.Details
revision to pa 201608306316: remodel unit 1 at 2nd floor, remodel unit 2 at 3rd and 4th floor level. modify floor plans at 1st , 2nd, 3rd, & 4th floors. modify structural foundation/framing and add dormers. | $40,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2017 | 8 Landers St | Mission Bay Construction Services Inc. | #103: replace counter top, kitchen faucet, paint cabinets, add new lights to living room & new wine fridge circuit.Details
#103: replace counter top, kitchen faucet, paint cabinets, add new lights to living room & new wine fridge circuit. | $3,500 |
| May 26, 2016 | Completed final sign-off Feb 2018 | 68 Mccoppin St | Mission Bay Construction Services Inc. | replace kitchen cabinets in kind, sink, appliances, under cabinets lights.Details
replace kitchen cabinets in kind, sink, appliances, under cabinets lights. | $18,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 3709 25th St | Mission Bay Construction Services Inc. | interior remodel @ 3rd fl adding one full bath. all work to be performed w/in (e) boundary of the bldg.Details
interior remodel @ 3rd fl adding one full bath. all work to be performed w/in (e) boundary of the bldg. | $11,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 3709 25th St | Mission Bay Construction Services Inc. | swap out bathroom fixtures, no change in layout, toilet, bath tub, vanity.Details
swap out bathroom fixtures, no change in layout, toilet, bath tub, vanity. | $9,000 |
| Nov 13, 2015 | Completed final sign-off Aug 2017 | 233 Stanyan St | Mission Bay Construction Services Inc. | one bath remodel @ 2nd floor - replace all bathroom fixtures in kind, new tiles, vanity, tub, shower, toilet, new gfci & led recessed lights.Details
one bath remodel @ 2nd floor - replace all bathroom fixtures in kind, new tiles, vanity, tub, shower, toilet, new gfci & led recessed lights. | $18,500 |
| Sep 16, 2015 | Never finaled issued Sep 2015, no final | 6738 Fulton St | Mission Bay Construction Services Inc. | replace tiles, tub, vanity sink, toilet & light fixtures in kind. replace shower control.Details
replace tiles, tub, vanity sink, toilet & light fixtures in kind. replace shower control. | $10,500 |
| Apr 21, 2015 | Completed final sign-off Jul 2015 | 3182 Turk Bl | Mission Bay Construction Services Inc. | remodel kitchen - in kind- cabinet, sink, stove, & fridge; new floor tiles & countertop; remodel balthroom in kind- tub, vanity, toilet; new tiles. to comply with cec150.0(k)3 &5Details
remodel kitchen - in kind- cabinet, sink, stove, & fridge; new floor tiles & countertop; remodel balthroom in kind- tub, vanity, toilet; new tiles. to comply with cec150.0(k)3 &5 | $26,000 |