Scott Ferrell
- Listed as
- architect
- Firm
- Aquatic Design Group
- On San Francisco permits
- Aug 2012 to Mar 2017
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2017 | Completed final sign-off Jan 2018 | 41 Tehama St | Lend Lease (Us) Construction Inc | structural drawing for spa permit included in the approved site permit and architectural addendum (ref. appln #201404304554s)Details
structural drawing for spa permit included in the approved site permit and architectural addendum (ref. appln #201404304554s) | |
| Aug 6, 2014 | Completed final sign-off Mar 2015 | 380 Fulton St | Nibbi Bros Assoc Inc. | revision to pa#201303222886-s3 mechanical only, plumbing for swimming pool and electrical, hvac for pool only.Details
revision to pa#201303222886-s3 mechanical only, plumbing for swimming pool and electrical, hvac for pool only. | $75,000 |
| Aug 14, 2012 | Never finaled issued Apr 2013, no final | 3555 19th St | reivsion to 201006295547 to remediate substandard existing pool deck concrete slab and pool mechanical equipment. scope of work includes removeal and replacement of the pool deck and pool mechanical systemDetails
reivsion to 201006295547 to remediate substandard existing pool deck concrete slab and pool mechanical equipment. scope of work includes removeal and replacement of the pool deck and pool mechanical system | $150,000 |