Sam Tsui
- License
- C78233
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C78233 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Tas Consulting Engineers
- Based in
- San Jose
- On San Francisco permits
- Apr 2008 to Sep 2025
11 permits since 2000 (engineer on 8 permits, architect on 1 permit, authorized agent-others on 1 permit, designer on 1 permit): 6 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Be Pro Construction Inc, Blue Birds Construction Inc, Dmsquare Construction 2 Inc, F Liu Construction, Ho Bok Construction, Soon Ye Louie/Dba Soon Louie Const., Sturdy Home Builders
- Engineers
- Bernie Boi Tsan
Where they worked
- Single-family 9
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Jan 2026 | 1 Gabilan Wy | to comply w/ nov 202428348: contruct new patio at front entrance with sloped roof to enclose entranceDetails
to comply w/ nov 202428348: contruct new patio at front entrance with sloped roof to enclose entrance | $1,000 | |
| Apr 25, 2025 | In progress issued Jul 2025 | 841 44th Av | Be Pro Construction Inc | convert 682 sf garage area to habitable space on ground fl: 1 bedrm, bathrm family rm, mud rm; new door to public way; deck and stair extending approx 6' into the rear yard; construct 2nd new bath on 2nd fl; new recessed lighting in bedroom 1 and bedroom 2Details
convert 682 sf garage area to habitable space on ground fl: 1 bedrm, bathrm family rm, mud rm; new door to public way; deck and stair extending approx 6' into the rear yard; construct 2nd new bath on 2nd fl; new recessed lighting in bedroom 1 and bedroom 2 | $40,000 |
| May 13, 2024 | Completed final sign-off May 2025 | 1619 35th Av | Sturdy Home Builders | gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt.Details
gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt. | $20,000 |
| Mar 29, 2024 | Completed final sign-off Oct 2024 | 165 Laura St | Ho Bok Construction | scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor.Details
scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor. | $10,000 |
| Aug 28, 2023 | Completed final sign-off Nov 2025 | 2639 21st Av | Dmsquare Construction 2 Inc | legalize existing conditioned space as a 1-bedroom accessory dwelling unit(adu). 382 sq ft. per ordinace 95-17Details
legalize existing conditioned space as a 1-bedroom accessory dwelling unit(adu). 382 sq ft. per ordinace 95-17 | $10,000 |
| Dec 16, 2020 | Expired or cancelled withdrawn Apr 2021 | 230 Faxon Av | 2nd floor remodel: remove wall between extg dining room and kitchen, and wall between living room and dining room. remodel kitchen.Details
2nd floor remodel: remove wall between extg dining room and kitchen, and wall between living room and dining room. remodel kitchen. | $30,000 | |
| May 24, 2019 | Never finaled issued Jul 2019, no final | 1859 39th Av | Blue Birds Construction Inc | 2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrmsDetails
2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrms | $20,000 |
| Aug 29, 2018 | Expired or cancelled withdrawn May 2022 | 3619 Lincoln Wy | construct new rear decks & new retaining wall. convert (e) windows @ rear of 1st floor & 2nd floor to 5'-0" sliding glass doors.Details
construct new rear decks & new retaining wall. convert (e) windows @ rear of 1st floor & 2nd floor to 5'-0" sliding glass doors. | $16,000 | |
| May 6, 2014 | Completed final sign-off Sep 2014 | 3421 Scott St | F Liu Construction | construct (n) bathroom in place of (e) lightwell. compliance with ordinance no 155-13 not required.Details
construct (n) bathroom in place of (e) lightwell. compliance with ordinance no 155-13 not required. | $5,000 |
| Mar 28, 2014 | Completed final sign-off Dec 2014 | 2516 16th Av | Soon Ye Louie/Dba Soon Louie Const. | g/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath.Details
g/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath. | $55,000 |
| Apr 28, 2008 | Never finaled issued Apr 2008, no final | 344 Gold Mine Dr | replace all 12 windows and all siding on all three sidesDetails
replace all 12 windows and all siding on all three sides | $15,000 |