Bernie Boi Tsan
- Listed as
- engineer
- On San Francisco permits
- Jan 2019 to Dec 2019
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2019 | Completed final sign-off Jul 2020 | 600 Felton St | Yao Star Construction | 2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage.Details
2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage. | $65,000 |
| May 24, 2019 | Never finaled issued Jul 2019, no final | 1859 39th Av | Blue Birds Construction Inc | 2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrmsDetails
2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrms | $20,000 |
| Jan 25, 2019 | Never finaled issued Apr 2019, no final | 3621 Clement St | A & W Contractors | 1/f: remodel (e) 3 bathrooms & 1 kitchen. remove walls to create "open concept." add large windows/doors on southside (rear). update electrical. add radiant heating, add skylight on flat roof. replace plumbing as needed. replace rear stucco to match (e) not visible to street.Details
1/f: remodel (e) 3 bathrooms & 1 kitchen. remove walls to create "open concept." add large windows/doors on southside (rear). update electrical. add radiant heating, add skylight on flat roof. replace plumbing as needed. replace rear stucco to match (e) not visible to street. | $75,000 |