Russell S. Nichols
- Listed as
- architect
- Firm
- Rmw, Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Feb 2019
6 permits since 2000 (architect on 6 permits): 3 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2019 | Completed final sign-off Sep 2019 | 750 Post St | C C I Commercial Construction & Improv | exterior facade improvements & interior ti, including retail area, open office, private offices, conference rooms, training rooms, beak room & support areas. new ada compliant restrooms. mep/fire/life safety under separate permit.Details
exterior facade improvements & interior ti, including retail area, open office, private offices, conference rooms, training rooms, beak room & support areas. new ada compliant restrooms. mep/fire/life safety under separate permit. | $864,830 |
| Nov 19, 2018 | Completed final sign-off Nov 2020 | 750 Post St | C C I Commercial Construction & Improv | interior tenant demoltion of the 1st & 2nd floors of an existing 2 story office building at 750 post st. each project floor area is approximately 11,000 sf ab-017Details
interior tenant demoltion of the 1st & 2nd floors of an existing 2 story office building at 750 post st. each project floor area is approximately 11,000 sf ab-017 | $90,000 |
| Dec 13, 2016 | Expired or cancelled withdrawn Oct 2019 | 295 Bay St | Opi Commercial Builders | revision to p/a#201602119416. addition of exterior high pressure laminate panel system at entry of building.Details
revision to p/a#201602119416. addition of exterior high pressure laminate panel system at entry of building. | $119,000 |
| Oct 6, 2016 | Completed final sign-off Oct 2019 | 295 Bay St | Opi Commercial Builders | revision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13Details
revision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13 | $38,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 295 Bay St | Opi Commercial Builders | interior tenant improvement on all four floors, previous demo pa #201510068992. mep & life safety/sprinkler deferred under separate permit. n/a maher ordinanceDetails
interior tenant improvement on all four floors, previous demo pa #201510068992. mep & life safety/sprinkler deferred under separate permit. n/a maher ordinance | $1,864,830 |
| Dec 4, 2015 | Expired or cancelled cancelled Jan 2026 | 295 Bay St | tenant improvement of all 4 floors, including replacement of existing exterior windows with new insulated glazing. mep & life safety/sprinklers under separate permit. n/a maher ordinanceDetails
tenant improvement of all 4 floors, including replacement of existing exterior windows with new insulated glazing. mep & life safety/sprinklers under separate permit. n/a maher ordinance | $2,864,830 |