Roque A Tomatis
- Listed as
- architect
- Firm
- Spinel-Tomatis, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Dec 2025
7 permits since 2000 (architect on 7 permits): 3 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | In progress issued Aug 2026 | 1033 Broadway | Seths Crew | remodel interior layout to remove living room and enlarge 2 (e) bedrooms and on (e) bathroom new fixtures and finishes in bathroom install (n) laundry closet and remodel interior finishes replace windows in kind.Details
remodel interior layout to remove living room and enlarge 2 (e) bedrooms and on (e) bathroom new fixtures and finishes in bathroom install (n) laundry closet and remodel interior finishes replace windows in kind. | $150,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 208 Moultrie St | Cardenas Custom Builders Inc., Darc Ventures Inc Dba Spl Construction S | convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade.Details
convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade. | $40,000 |
| Mar 5, 2025 | In progress filed Mar 2025, not yet issued | 214 Missouri St | remove deck. rebuild laundry room at 2nd & 3rd fl. build new exterior stairsDetails
remove deck. rebuild laundry room at 2nd & 3rd fl. build new exterior stairs | $30,000 | |
| Dec 4, 2024 | Completed final sign-off Sep 2025 | 1224 16th Av | Gnetzer General Contractor | replace kitchen cabinets, fixtures & finishes. relocate bathroom & add one more bathroom at 3rd fl. install (n) skylight. reconfigure 3 windows at rear facade 3rd flDetails
replace kitchen cabinets, fixtures & finishes. relocate bathroom & add one more bathroom at 3rd fl. install (n) skylight. reconfigure 3 windows at rear facade 3rd fl | $50,000 |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 28 Hillway Av | Del Plata Builders Inc | infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight.Details
infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight. | $150,000 |
| Nov 23, 2022 | In progress issued Mar 2024 | 79 Elsie St | altered site permit to pa201904248872-s: minimize changes to facade; reconfig interior layout,reduce massing to comply w/ sfpc sec.242. bernal heights sud;revised project to fit within previously approved envelope.top roof deck removed. 1 story vert + 3 story horiz addition.Details
altered site permit to pa201904248872-s: minimize changes to facade; reconfig interior layout,reduce massing to comply w/ sfpc sec.242. bernal heights sud;revised project to fit within previously approved envelope.top roof deck removed. 1 story vert + 3 story horiz addition. | ||
| Apr 24, 2019 | Never finaled issued Sep 2021, no final | 79 Elsie St | construct 1 story vertical & 3 story horizontal addition to (e) 2 story sfr. remove (e) 1 story wood deck @ rear & provide 1 deck @ 3rd floor & 1 roof deck. relocate entry to 1st floor. renovate 2 story interior with new partitions & finishes.Details
construct 1 story vertical & 3 story horizontal addition to (e) 2 story sfr. remove (e) 1 story wood deck @ rear & provide 1 deck @ 3rd floor & 1 roof deck. relocate entry to 1st floor. renovate 2 story interior with new partitions & finishes. | $561,000 |