Roberto Cortez
- Listed as
- engineer
- Firm
- Monarch Engineering
- On San Francisco permits
- Nov 2007 to Sep 2026
19 permits since 2000 (engineer on 19 permits): 10 completed, 3 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 33 Retiro Wy | J Farley Construction | remove existing wall on the second floor including the existing front door. build a new wall where the front door will be located.Details
remove existing wall on the second floor including the existing front door. build a new wall where the front door will be located. | $25,000 |
| Jun 5, 2026 | In progress issued Jul 2026 | 247 Cumberland St | Matthew Kelly Construction Inc | retaining wall replacement at rear yardDetails
retaining wall replacement at rear yard | $30,000 |
| Feb 20, 2025 | In progress filed Feb 2025, not yet issued | 560 Franconia St | demo concrete entrance ramp and landing, and wooden railing. construct concrete entrance ramp and landing, and steel railing.Details
demo concrete entrance ramp and landing, and wooden railing. construct concrete entrance ramp and landing, and steel railing. | $20,000 | |
| Dec 12, 2022 | Completed final sign-off Apr 2023 | 2143 Greenwich St | replace & repair rear deck more than 50%. repair in-kind and voluntary strengthening.Details
replace & repair rear deck more than 50%. repair in-kind and voluntary strengthening. | $20,000 | |
| Nov 2, 2022 | Completed final sign-off Mar 2023 | 3626 Sacramento St | abe program - determine technical infeasability to remove architectural barriers. install compliant handrails @ (e) stairs. add contrasting strips to front stairs. abe #202209084026.Details
abe program - determine technical infeasability to remove architectural barriers. install compliant handrails @ (e) stairs. add contrasting strips to front stairs. abe #202209084026. | $7,500 | |
| May 5, 2022 | Never finaled issued Sep 2022, no final | 2845 Ingalls St | to comply with nov# 201982931: legalize unpermitted work. replace in-kind furnace in attic space. add partition wall to separate (e) dwelling unit with (e) commercial unit. replace ceiling. add new curb ramp at main door landing. remove escape ladder.Details
to comply with nov# 201982931: legalize unpermitted work. replace in-kind furnace in attic space. add partition wall to separate (e) dwelling unit with (e) commercial unit. replace ceiling. add new curb ramp at main door landing. remove escape ladder. | $38,850 | |
| May 5, 2022 | Never finaled issued Sep 2022, no final | 2845 Ingalls St | to comply with nov# 201982931: remove unpermitted door at the kitchen and reinstall window (reverting to condition before unpermitted work).Details
to comply with nov# 201982931: remove unpermitted door at the kitchen and reinstall window (reverting to condition before unpermitted work). | $1,000 | |
| Mar 3, 2022 | Expired or cancelled withdrawn Feb 2023 | 256 Laguna Honda Bl | K F L Construction Inc. | rev to pa201907196376: changes to ada ramps & path of travelDetails
rev to pa201907196376: changes to ada ramps & path of travel | |
| May 13, 2020 | Completed final sign-off Nov 2021 | 734 23rd Av | Palacios Construction | remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewerDetails
remodel (e) kitchen & baths. add (n) bath on 2nd fl. relocate 1st fl powder rm . (n) bath & laundry on ground fl. turn ground fl stairs direction. upgrade main electr panel. add subpanel on 2nd fl. (n) wh & furnace. reinforce structural component, add piers on grnd fl, replace main sewer | $150,000 |
| Jan 21, 2020 | Completed final sign-off Jan 2022 | 121 Elsie St | Jeff King And Company Inc | revision to pa #201910043578. 2nd floor (n) stair rail and increase floor opening 2', (e) stair posts to be kept in (e) location, refinish (e) staircase.Details
revision to pa #201910043578. 2nd floor (n) stair rail and increase floor opening 2', (e) stair posts to be kept in (e) location, refinish (e) staircase. | $8,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2022 | 121 Elsie St | Jeff King And Company Inc | gr fl laundry and bath remodel. add 1 powder rm to e living space. 2nd fl kitchen remodel, remove 1 pwdr room. 3rd fl bath remodel. replace bay window at front.Details
gr fl laundry and bath remodel. add 1 powder rm to e living space. 2nd fl kitchen remodel, remove 1 pwdr room. 3rd fl bath remodel. replace bay window at front. | $200,000 |
| Jun 18, 2018 | Never finaled issued Jun 2018, no final | 125 03rd St | temporary tent structure/ tent size 60w x 60d. 22'-9.5 h// this has been approved in the past, the historical building next door has prompted this approval with dbi prior to getting the temp membrane and occupancy(seperate permit) with 698 2nd street at sffd hq.Details
temporary tent structure/ tent size 60w x 60d. 22'-9.5 h// this has been approved in the past, the historical building next door has prompted this approval with dbi prior to getting the temp membrane and occupancy(seperate permit) with 698 2nd street at sffd hq. | $10,000 | |
| Apr 27, 2018 | Completed final sign-off Sep 2019 | 650 Visitacion Av | remove interior walls, installatio of new headers & support posts, retrofit garage headerDetails
remove interior walls, installatio of new headers & support posts, retrofit garage header | $8,500 | |
| Nov 7, 2017 | Completed final sign-off Mar 2018 | 25 Madison St | remove interior walls and entry doors to existing kitchen/dining area. infill e openingDetails
remove interior walls and entry doors to existing kitchen/dining area. infill e opening | $7,000 | |
| Aug 13, 2015 | Completed final sign-off Nov 2015 | 100 Romain St | Marvel Construction Company Inc | legalize (e) guest room & bath @ ground floor. reduce sliding doors size in bedroom on 2nd floor, remove wall in kitchen, replace 3 skylights, install 1 new skylight in staircase.Details
legalize (e) guest room & bath @ ground floor. reduce sliding doors size in bedroom on 2nd floor, remove wall in kitchen, replace 3 skylights, install 1 new skylight in staircase. | $22,000 |
| Aug 20, 2014 | Completed final sign-off Jan 2015 | 125 Clayton St | P Jordan Builders Inc | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. | $65,000 |
| Jan 27, 2011 | Completed final sign-off Oct 2015 | 507 09th Av | Todd Pattison & Associates | replace existing wood beam with new steel beam, lower slab to 8'0 clr. widen garage door to 8'6.Details
replace existing wood beam with new steel beam, lower slab to 8'0 clr. widen garage door to 8'6. | $32,000 |
| Jan 15, 2009 | Expired or cancelled cancelled Feb 2010 | 245 14th St | Liberty Construction | install spiral stairwell from lower unit to 2nd fl units, install firewall on third & fourth floors on east wall of building.Details
install spiral stairwell from lower unit to 2nd fl units, install firewall on third & fourth floors on east wall of building. | $18,000 |
| Nov 30, 2007 | Expired or cancelled cancelled Jul 2024 | 2765 Mission St | rear addition to commercial 1-story building approx. 1,400 s.f. with ada complying bathroom.Details
rear addition to commercial 1-story building approx. 1,400 s.f. with ada complying bathroom. | $65,000 |