Nicholas J Tricarico
- Listed as
- architect
- Firm
- Tricarico Architecture
- On San Francisco permits
- Sep 2013 to Feb 2025
9 permits since 2000 (architect on 9 permits): 6 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2025 | Completed final sign-off Feb 2025 | 441 Jackson St | American Sign Installation Co | awning sign "polo ralph lauren" (above door)Details
awning sign "polo ralph lauren" (above door) | $4,000 |
| Feb 13, 2025 | Completed final sign-off Feb 2025 | 441 Jackson St | American Sign Installation Co | awning sign (projecting)Details
awning sign (projecting) | $3,500 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 441 Jackson St | Alain Hirsch Construction Corp | deferred electrical only permit for permit #202407025713.Details
deferred electrical only permit for permit #202407025713. | |
| Dec 18, 2015 | Never finaled issued Jan 2016, no final | 166 Geary St | Build Group Inc. | revision to app#2015-1015-9793. scope is to revise support of new steel staircase at maiden lane entrance.Details
revision to app#2015-1015-9793. scope is to revise support of new steel staircase at maiden lane entrance. | $5,000 |
| Oct 30, 2015 | Expired or cancelled cancelled Feb 2021 | 166 Geary St | Build Group Inc. | replace fire rating in walls where abatement occurred to remove hazardous materials. revision to approved pa#'s 201501266676 & 201506037965Details
replace fire rating in walls where abatement occurred to remove hazardous materials. revision to approved pa#'s 201501266676 & 201506037965 | $5,000 |
| Jul 30, 2015 | Never finaled issued Aug 2015, no final | 170 Ofarrell St | Trainor Commercial Construction Inc. | 2nd floor t.i. - demo (e) mill work, finishes, flooring, install new finishes with associated electrical. n/a maher oridnanceDetails
2nd floor t.i. - demo (e) mill work, finishes, flooring, install new finishes with associated electrical. n/a maher oridnance | $65,000 |
| Feb 21, 2014 | Completed final sign-off Oct 2014 | 865 Market St | Fisher Development Inc | shelving permit for house of hoops foot locker. ti under separate permit #201402219045. compliance with ordinance #155-13 not required.Details
shelving permit for house of hoops foot locker. ti under separate permit #201402219045. compliance with ordinance #155-13 not required. | $5,000 |
| Feb 21, 2014 | Completed final sign-off Oct 2014 | 865 Market St | Fisher Development Inc | house of hoops/footlocker: ti of existing retail space in sf centre mall. combine 2 units, remove demising wall. new finishes, fooring, electrical, shelving under separate permit. compliance with ordinance #155-13 not required.Details
house of hoops/footlocker: ti of existing retail space in sf centre mall. combine 2 units, remove demising wall. new finishes, fooring, electrical, shelving under separate permit. compliance with ordinance #155-13 not required. | $100,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2015 | 50 03rd St | Horizon Retail Construction Inc | lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588Details
lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588 | $64,621 |