Rene Philip Vignos
- License
- S4462
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S4462 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Forell Elesser
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Nov 2026
5 permits since 2000 (engineer on 5 permits): 2 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (3), Novo Construction Inc
- Architects
- Emily Gosack (2), Annie K Lo, Carolyn Kiernat, Steven Huegli
- Engineers
- Justin Schultz, Michael Giangrave
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 800 Chestnut St | Plant Construction Co, Lp | revision to pa#202512081243. exterior/site revisions: landscape, pathways, perimeter wall, & sidewalks; clay lv 4 exterior updates, including benches/cane detection, awnings, gates & landscaping; miscellaneous guardrails & handrails. space planning & room reconfiguration.Details
revision to pa#202512081243. exterior/site revisions: landscape, pathways, perimeter wall, & sidewalks; clay lv 4 exterior updates, including benches/cane detection, awnings, gates & landscaping; miscellaneous guardrails & handrails. space planning & room reconfiguration. | |
| Jun 4, 2026 | In progress issued Oct 2026 | 800 Chestnut St | Plant Construction Co, Lp | revision to bpa# 202508132954, update concrete wall alignment at gridline c. revise collector callouts. remove grade beam extension beyond level 1 retaining walls. other misc. structural details per plans due to field conditions.Details
revision to bpa# 202508132954, update concrete wall alignment at gridline c. revise collector callouts. remove grade beam extension beyond level 1 retaining walls. other misc. structural details per plans due to field conditions. | |
| Oct 7, 2025 | In progress issued Mar 2026 | 800 Chestnut St | Plant Construction Co, Lp | seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has been completed.Details
seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has been completed. | $5,000,000 |
| Jul 21, 2011 | Completed final sign-off Feb 2012 | 101 Spear St | Novo Construction Inc | floor 2, #200 - revision to t.i. pa #201106208478: structural upgrade work to existing mezzanine.Details
floor 2, #200 - revision to t.i. pa #201106208478: structural upgrade work to existing mezzanine. | |
| Sep 15, 2006 | Completed final sign-off Dec 2006 | 356 Warren Dr | replace (e) deteriorated concrete stair (exterior) with new wood stair.Details
replace (e) deteriorated concrete stair (exterior) with new wood stair. | $5,000 |