Patrick Perez
- Listed as
- architect, designer
- Firm
- Designnpad Architecture
- Based in
- Emeryville
- On San Francisco permits
- Mar 2005 to Jul 2026
29 permits since 2000 (architect on 28 permits, designer on 1 permit): 18 completed, 4 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Sep 2026 | 1045 Cole St | C H Burnham Inc | partial renovation to single family home including kitchen and powderroom. add new windows to rear. remove fireplace and chimney. replace in-kind roof deck guardrail, repair rear facade dry rot and roof decking.Details
partial renovation to single family home including kitchen and powderroom. add new windows to rear. remove fireplace and chimney. replace in-kind roof deck guardrail, repair rear facade dry rot and roof decking. | $110,000 |
| Jun 23, 2025 | In progress issued Jul 2025 | 246 28th Av | De Jong Construction | 270 sqft rear yard addition at 2nd fl. partial renovation to bathrooms at 2nd flDetails
270 sqft rear yard addition at 2nd fl. partial renovation to bathrooms at 2nd fl | $175,000 |
| Oct 31, 2023 | In progress issued Jul 2025 | 2930 Laguna St | main rear: 1/f: renovate (e) bathroom, add shower, create new cooridor alongside garage for exit access to rear living space, new sliding glass door at rear living space and new exterior steps to deck. 2/f: no work. 3/f: 100sf addition to rear bedroom, renovate and expand existing. demo chimney.Details
main rear: 1/f: renovate (e) bathroom, add shower, create new cooridor alongside garage for exit access to rear living space, new sliding glass door at rear living space and new exterior steps to deck. 2/f: no work. 3/f: 100sf addition to rear bedroom, renovate and expand existing. demo chimney. | $40,000 | |
| Oct 31, 2023 | In progress issued Jul 2025 | 2928 Laguna St | Mission Home Remodeling Inc | front: new single family home to be built over existing two car garage.Details
front: new single family home to be built over existing two car garage. | $450,000 |
| Sep 14, 2022 | Completed final sign-off May 2023 | 580 Mississippi St | Hong Shink Construction | rev to pa 202112104170 shift large skylight to the west approx 2 structural updates: roof:sister (n) 2x10 to 6x10 due to new skylight location. second floor framings sister (n) lvl to 5.25 x 9 psl supporting the roof beams, (n) beams by the stairs due to removed of existing posts. first floor: (n) bDetails
rev to pa 202112104170 shift large skylight to the west approx 2 structural updates: roof:sister (n) 2x10 to 6x10 due to new skylight location. second floor framings sister (n) lvl to 5.25 x 9 psl supporting the roof beams, (n) beams by the stairs due to removed of existing posts. first floor: (n) b | |
| Sep 22, 2021 | Completed final sign-off Aug 2024 | 1970 Green St | Flmc Development Corp Dba Adamo Campagna | renovation to lower unit, partial excavation of basement o create habitable space; minor interior reconfig of floor plan at 1/f and 2/f.reloctae of stairs from 1/f to bsemen t with reconfig of stair from 1/f to 2nd.Details
renovation to lower unit, partial excavation of basement o create habitable space; minor interior reconfig of floor plan at 1/f and 2/f.reloctae of stairs from 1/f to bsemen t with reconfig of stair from 1/f to 2nd. | $85,000 |
| Jan 27, 2021 | Completed final sign-off Aug 2022 | 54 Homestead St | H T H Construction | remodel kitchen & bathroom on 2/f. remodel bathroom & add new bathroom on 3/f. infill of north side lightwell at 3/f.Details
remodel kitchen & bathroom on 2/f. remodel bathroom & add new bathroom on 3/f. infill of north side lightwell at 3/f. | $150,000 |
| Jul 13, 2020 | Completed final sign-off Oct 2024 | 520 Foerster St | Mission Home Remodeling Inc | two story addition at rear yard,interior renovation,new kitchen & bath, renovate existing bath, new rear yard deck.Details
two story addition at rear yard,interior renovation,new kitchen & bath, renovate existing bath, new rear yard deck. | $280,000 |
| May 12, 2020 | Completed final sign-off Sep 2020 | 835 Peralta Av | -conversion of existing ground floor storage space to living space -renovation of (e) kitchen and two bathrooms (1 lower level & 1 upper level).Details
-conversion of existing ground floor storage space to living space -renovation of (e) kitchen and two bathrooms (1 lower level & 1 upper level). | $45,000 | |
| Jan 2, 2020 | Completed final sign-off Aug 2023 | 479 21st Av | rear yard addition & renovation to single family home. renovate kitchen & new half bath.Details
rear yard addition & renovation to single family home. renovate kitchen & new half bath. | $132,800 | |
| Sep 26, 2019 | Completed final sign-off Oct 2022 | 583 Clipper St | O Donoghue Construction Inc. | new deck & stair @ rear to serve 2nd floor. new sliding gladd door at deck. new windows at rear side east wallDetails
new deck & stair @ rear to serve 2nd floor. new sliding gladd door at deck. new windows at rear side east wall | $45,000 |
| Nov 30, 2018 | Expired or cancelled expired Feb 2025 | 742 Myra Wy | Finbarr Collins Construction Inc. | rear yard addition. new bathroom at ground level below existing detail.Details
rear yard addition. new bathroom at ground level below existing detail. | $30,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2017 | 2869 Broderick St | Michael De Jong Construction | remodel of (e) 2nd & 3rd floors. all work is interior, no exterior work.Details
remodel of (e) 2nd & 3rd floors. all work is interior, no exterior work. | $135,000 |
| Nov 17, 2015 | Completed final sign-off Aug 2016 | 232 San Carlos St | Michael De Jong Construction | new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windowsDetails
new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windows | $95,000 |
| May 1, 2015 | Completed final sign-off Oct 2015 | 1825 Scott St | Hyline Construction Inc | revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changedDetails
revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changed | |
| May 1, 2015 | Completed final sign-off Oct 2015 | 1827 Scott St | Hyline Construction Inc | revision to 2013 0513 6725; minor floor plan changes to each floor. some windows revised in sizeDetails
revision to 2013 0513 6725; minor floor plan changes to each floor. some windows revised in size | |
| Aug 19, 2014 | Completed final sign-off Jan 2018 | 1235 Sanchez St | C H Burnham Inc | partial renovation of first floor, complete renovation at second floor, new bay window at sw corner at level two., expand and renovate existing partial third floor and roof deck, new roof deck at fourth floor.Details
partial renovation of first floor, complete renovation at second floor, new bay window at sw corner at level two., expand and renovate existing partial third floor and roof deck, new roof deck at fourth floor. | $175,000 |
| May 13, 2013 | Completed final sign-off Oct 2015 | 1827 Scott St | Hyline Construction Inc | convert ground floor storage space to living space renovate kitchen, new partial 3rd story additionDetails
convert ground floor storage space to living space renovate kitchen, new partial 3rd story addition | $90,000 |
| May 13, 2013 | Completed final sign-off Oct 2015 | 1825 Scott St | Hyline Construction Inc | conduct ground floor storage space to apartment renovate kitchen in main unit, new partial 3rd storyDetails
conduct ground floor storage space to apartment renovate kitchen in main unit, new partial 3rd story | $90,000 |
| Mar 29, 2013 | Completed final sign-off Sep 2015 | 3060 Jackson St | Dawson - Clinton Gen Contr Corp | interior renovation thruout convert crawl space at ground level to living space add dormers to top floor living space new elevatorDetails
interior renovation thruout convert crawl space at ground level to living space add dormers to top floor living space new elevator | $475,000 |
| Mar 21, 2013 | Never finaled issued Mar 2014, no final | 4268 26th St | Mrcc | convert closet and attic space to bathroomDetails
convert closet and attic space to bathroom | $25,000 |
| Mar 11, 2011 | Expired or cancelled withdrawn Apr 2012 | 230 Avila St | horizontal addition, convert portion of garage to living space, renovate kitchen, bath and den at second fl. new 349 sf addition to existing third fl. new roof, deck and fire escape at rear of building.Details
horizontal addition, convert portion of garage to living space, renovate kitchen, bath and den at second fl. new 349 sf addition to existing third fl. new roof, deck and fire escape at rear of building. | $195,000 | |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 1161 Mission St | T J Constr Inc***Ck Id,Tie Liu Only***** | suite #120 - revision to approved permit # 2009/0930/7942. additional infomation added to as builts per inspector's instructions and to clarify accessible entrance path of travel.Details
suite #120 - revision to approved permit # 2009/0930/7942. additional infomation added to as builts per inspector's instructions and to clarify accessible entrance path of travel. | |
| Nov 1, 2007 | Completed final sign-off Feb 2008 | 1054 Cole St | interior remodel to kitchen,new cabinets and lighting, convert laundry room to new bathroom. infill existing proprerty line window. replace window with door.Details
interior remodel to kitchen,new cabinets and lighting, convert laundry room to new bathroom. infill existing proprerty line window. replace window with door. | $30,000 | |
| Aug 8, 2007 | Completed final sign-off Jan 2008 | 177 Townsend St | work @ unit# 1131 only. minor interior renovation. replace doors, tile, cabinets faces. replace in kind decorative cfl lighting. move two non-load bearing partition walls.Details
work @ unit# 1131 only. minor interior renovation. replace doors, tile, cabinets faces. replace in kind decorative cfl lighting. move two non-load bearing partition walls. | $95,000 | |
| Jan 19, 2006 | Never finaled issued Nov 2007, no final | 1160 Fulton St | Bridgepoint Builders Inc. | replace (e) rear yard stair with 1 story new deck & stair.Details
replace (e) rear yard stair with 1 story new deck & stair. | $12,000 |
| Dec 23, 2005 | Expired or cancelled expired Mar 2011 | 1160 Fulton St | rear building - relocate (e) bathroom, (e) windows & doors.Details
rear building - relocate (e) bathroom, (e) windows & doors. | $10,000 | |
| Mar 11, 2005 | Completed final sign-off Nov 2005 | 1190 Sacramento St | interior renovation, new kitchen cabinets, new bath fixtures & finishes. removal of some non-loadDetails
interior renovation, new kitchen cabinets, new bath fixtures & finishes. removal of some non-load | $40,000 | |
| Mar 4, 2005 | Expired or cancelled withdrawn Feb 2006 | 22 Roselyn Tr | adding 270 sqft. to (e) 3rd/fl (top). to create a master bedroom suite w/3 new skylights & minorDetails
adding 270 sqft. to (e) 3rd/fl (top). to create a master bedroom suite w/3 new skylights & minor | $78,000 |