Nina Le Baron
- Listed as
- architect
- Firm
- Island Architecture
- Based in
- Sausalito
- On San Francisco permits
- Oct 2015 to Apr 2017
7 permits since 2000 (architect on 7 permits): 4 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2017 | Expired or cancelled cancelled Jan 2026 | 611 06th Av | widen garage door from 7'-6" to 8'-6', revise cut in sidewalk & curb to accomodate wider driveway, addres drainage, move gas meter, add window @ garage, update fence & gate to second door, locate leak @ porch roof & repair, add planterDetails
widen garage door from 7'-6" to 8'-6', revise cut in sidewalk & curb to accomodate wider driveway, addres drainage, move gas meter, add window @ garage, update fence & gate to second door, locate leak @ porch roof & repair, add planter | $25,000 | |
| Nov 5, 2015 | Never finaled issued Nov 2015, no final | 370 Waller St | American Enterprise Of Sf-See Notes | rev of pa#2015.1008.9221-reduction of scope of work; no fire sprinkers to be moved or relocated.Details
rev of pa#2015.1008.9221-reduction of scope of work; no fire sprinkers to be moved or relocated. | |
| Oct 30, 2015 | Completed final sign-off May 2016 | 2701 Van Ness Av | Haralampos Bratsis | unit 707, widen 2 existing archways on east west walls of dining room. wall non load bearingDetails
unit 707, widen 2 existing archways on east west walls of dining room. wall non load bearing | $6,500 |
| Oct 16, 2015 | Completed final sign-off Dec 2016 | 1939 Judah St | Maximo Construction | remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windoDetails
remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windo | $50,000 |
| Oct 8, 2015 | Never finaled issued Oct 2015, no final | 370 Waller St | American Enterprise Of Sf-See Notes | rear bldg - renovation of existing kitchen, add gas line for stove & fireplace, new lighting & electrical, no work to plumbing except moving fire sprinklers from wall into ceiling, remove non-load bearing walls between entry & kitchenDetails
rear bldg - renovation of existing kitchen, add gas line for stove & fireplace, new lighting & electrical, no work to plumbing except moving fire sprinklers from wall into ceiling, remove non-load bearing walls between entry & kitchen | $40,000 |
| Oct 8, 2015 | Completed final sign-off Apr 2017 | 263 Arch St | Current Construction | 1st floor in law: move non-load bearing wall, add doorway. 2nd fl unit: replace back windows w/ sliding doors, add deck & stairway down to backyard for egress.Details
1st floor in law: move non-load bearing wall, add doorway. 2nd fl unit: replace back windows w/ sliding doors, add deck & stairway down to backyard for egress. | $15,000 |
| Oct 8, 2015 | Completed final sign-off Apr 2017 | 261 Arch St | Current Construction | legalize non-permitted in-law, ordinance #43-14.Details
legalize non-permitted in-law, ordinance #43-14. | $1,000 |