Maximo Construction
- Based in
- Novato
- On San Francisco permits
- Oct 2014 to Jul 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2016 | Completed final sign-off Dec 2016 | 1939 Judah St | extend psl beam, revision to 2nd flr, 201510169980.Details
extend psl beam, revision to 2nd flr, 201510169980. | |
| Oct 16, 2015 | Completed final sign-off Dec 2016 | 1939 Judah St | remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windoDetails
remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windo | $50,000 |
| Jul 20, 2015 | Completed final sign-off Aug 2015 | 1933 Oak St | repair damaged rear deck less than 50% in kind, replace (e) dry rotted rear stairs in kind. to comply with nov #201411271Details
repair damaged rear deck less than 50% in kind, replace (e) dry rotted rear stairs in kind. to comply with nov #201411271 | $7,500 |
| Jun 4, 2015 | Completed final sign-off Mar 2016 | 1527 09th Av | anchor bolts around foundation. 1/2" plywood on bsmt walls. brackets on 5 support posts in bsmt. install reinforcing brackets to secure walls & joists.Details
anchor bolts around foundation. 1/2" plywood on bsmt walls. brackets on 5 support posts in bsmt. install reinforcing brackets to secure walls & joists. | $15,000 |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 2820 Octavia St | build walls as described in plans in basement for garage and crawl space.Details
build walls as described in plans in basement for garage and crawl space. | $8,500 |