Maximo Construction
- Based in
- Novato
- On San Francisco permits
- Oct 2014 to Jul 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 100 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2015 | Completed final sign-off Dec 2016 | 1939 Judah St | remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windoDetails
remodel/kitchen,remove non-load bearing walls,move bathroom,remove old fau & wh change to electric base heater & hw for both units,add smoke detectors on 3rd flr 2nd unit,add deck from 2nd flr to rear & door garden,add new security door @1st flr entryadd windo | $50,000 |
| Jul 20, 2015 | Completed final sign-off Aug 2015 | 1933 Oak St | repair damaged rear deck less than 50% in kind, replace (e) dry rotted rear stairs in kind. to comply with nov #201411271Details
repair damaged rear deck less than 50% in kind, replace (e) dry rotted rear stairs in kind. to comply with nov #201411271 | $7,500 |